Several terrestrial biosphere Carbon Dioxide Removal (CDR) approaches rely on the capture and storage of carbon in living woody biomass, --including both aboveground biomass (AGB) and belowground biomass (BGB). The quantification of BGB is often dependent upon AGB1, which is more directly observable. Thus, for these pathways, accurately and conservatively quantifying the gross storage of carbon in AGB is crucial for demonstrating net CO2 removal.
Aboveground biomass (AGB) encompasses all living vegetation above the soil surface, including stems, branches, foliage, and bark. Woody biomass refers to plants whose structure includes lignified stems, such as bamboo, plants, shrubs, and trees. Belowground woody biomass (BGB) encompasses the subsurface woody biomass in root systems.
This Module outlines requirements for quantification of AGBwoody biomass over a project area using Airborne Laser Scanning (ALS) measurements, also known as an area-based approach. This Module includes requirements for ALS data acquisition, ALS data processing, modeling, and verification.
ALS data can also be used to develop other types of models for forest carbon, such as through Individual Tree Crown modeling. Individual Tree Crown modeling is not in scope for this current Protocol version, but guidelines may be included in future iterations.
An area-basedThis approach forinvolves estimating [math:woody M_{AGB}]biomass involvesby linking field measurements of forest inventory with ALS data to enable area-wide mapping of forest attributes.
Generally, the following steps are used:
A number of decisions are made throughout the process. The requirements and recommendations for each step are detailed in subsequent sections.
The following resources are suggested for guidance on best practices:
This Module was developed based on the current state of the art, publicly available science regarding quantification of woody aboveground biomass and long-term monitoring of terrestrial ecosystems. This Module aims to be scientifically stringent and robust. We recognize that some requirements may exceed the status quo in the market and that there will be opportunities to improve the rigor of this Module.
Additionally, this Module will be reviewed when there is an update to published scientific literature, government policies, or legal requirements that would affect net CO2e removal quantification or the monitoring guidelines outlined in this Module, or at a minimum of every 2 years.
This Module quantifies the masstotal ofCO2 equivalent stored as aboveground woody biomass across the project area ([math: M_CO_2e_{AGB,t}]) at a given time point, t, throughmeasured directusing vegetationairborne samplinglaser andscanning. parameterWhere estimationincluded withinas surveya plots and scientifically validated allometric equations.
This Module is applicable to Projects whichwhere meet the following requirements:
Throughout this Module, the use of “must” indicates a requirement, whereas “should” indicates a recommendation.
For the purposes of this Module, any allometric equation employed by the Project must have widespread acceptance in scientific literature or rigorous evidence supporting its applicability.
Newly developed allometric equations must undergo validation against peer-reviewed standards and reference datasets.
This Module allows for two different area-based approaches for calculating [math: M_{AGB}(t)] (tonnes), the total aboveground biomass at a given time point, using ALS data. The recommended approach is to use wall-to-wall ALS measurements that have full coverage over the project area. In the other approach, ALS data collection can occur over representative subplots over a portion of the project area.
In the wall-to-wall approach, [math: M_{AGB}] of the project area is calculated by summing all the values of biomass density derived from the ALS observations and modeling across the entire project area:
[math: M_{AGB}(t) = {\sum_{i=1}^{n} AGB_{pixel,i}(t) \times a_{pixel}}]
(Equation 1)
Where:
In the alternative approach, ALS data is collected over representative subplots, and then used to estimate the mean biomass density ([math: \bar{m}_{AGB}]) over the project area.
[math: \bar{m}_{AGB}(t) = \frac{\sum_{i=1}^{j} AGB_{pixel,i}(t) \times a_{pixel}}{\sum_{i=1}^{j} a_{pixel}}]
(Equation 2)
Where:
[math: M_{AGB}] can then be calculated using the estimate of the mean AGB density, which can then be multiplied by the project area to obtain a total AGB:
[math: M_{AGB}(t) = \bar{m}_{AGB}(t) \times A_{project}]
(Equation 3)
Where:
If the project area is stratified, Equations 2 and 3 can be repeated for each project sub-area.
For both of the approaches above, the total aboveground biomass carbon stock in tonnes CO2 equivalent at time, [math: t], is further calculated as:
[math: CO_2e_{AGB}(t) = \frac{44}{12} \times CF \times M_{AGB}(t)]
(Equation 4)
Where:
The carbon fraction, [math: CF], must be chosen from the following hierarchy:
Where belowground biomass (BGB) is an included as a carbon pool, the belowground biomass is calculated as:
[math: CO_2e_{BGB}(t) = CO_2e_{AGB}(t) \times RS]
(Equation 5)
Where:
Appropriate root-to-shoot ratios should be selected by regional and species-specific factors that are justified based on scientific literature (e.g., USFS's Component Ratio Method or similar national-level species-specific ratios). This is the preferred approach to have the most accurate estimate and avoid overestimation. If sufficient evidence is provided to demonstrate that no suitable project-specific factor can be obtained, matching to the ecological zone and continent of the project area, based on the IPCC 2019 Table 4.46, must be used. In this case, sufficient evidence documenting the unsuccessful search for project specific factors must also be supplied. Acceptable evidence must show (1) a list of search terms used within a research database (e.g., Web of Science, Google Scholar) that encapsulate the region and species relevant to the Project, and (2) the relevant species are not included in the list of species for which root-to-shoot ratio data are available on the TRY Plant Trait Database8.
Where the root:shoot ratios are species or genus specific, the project-area root:shoot ratio must be calculated as a weighted value to represent the species mix within the project area.
The uncertainty in selected [math: RS] factors must be reported from the same source dataset. For example, the IPCC 2019 Chapter on Forest Land6 provides an uncertainty in the root-to-shoot ratio.
ALS data collection must occur throughout the Crediting Period, at the end of each Reporting Period for all Projects crediting under the Reforestation Protocol; all Projects crediting under Improved Forest Management, Agroforestry, or Mangroveat Restorationa mustdifferent followfrequency otherwise prescribed by the respectiveProtocol collectionunder requirementswhich The Project is crediting.
Wall-to-wall laser scanning measurements are highly recommended. Laser scanning of representative subplots throughout the project area is also permissible with rigorous statistical analysis to constrain the uncertainty associated with subplot selection and upscaling.
The ALS data acquisition must yield sufficient ground sampling to obtain a digital elevation model of 1 m resolution or greater over the observed area.
Minimum requirements for data acquisition parameter values are detailed below and are based on guidance from White (2013)2 and Duncanson et al. (2021)5. In some settings (e.g., areas with dense canopies), these parameter values may need to be more stringent than these minimum requirements in order to meet the digital elevation model resolution requirement.
Minimum parameter requirements include:
For subplot sampling, athe minimumfinal ofprocessed data product must cover 25% coverage of the project area. (after removing areas with scan-angles >12%) is required, and aA simple systematic sampling design (i.e., flight lines) should be sufficient in most cases. In some instances, flight lines may need to be drawn in such a way as to ensure the intersection with all strata. Overlap is not expectedrequired here.
Where subplot sampling is used for ALS acquisition, Projects must provide details on the subplots or flight lines acquired and include justification for the design which addresses any stratification used and how spatial autocorrelation is addressed.
[/G-6HBR-0]The ALS data acquisition must yield sufficient ground sampling to obtain a digital terrain model (DTM) of 1 m resolution or finer over the observed area.
[/R-WHF0-1]Some considerations around the data acquisition parameters are detailed below and are based on guidance from White (2013)2 and Duncanson et al. (2021)9. These are recommendations rather than strict requirements. It is expected that the acquisition parameters will be tailored to the setting and conditions to yield the required DTM resolution, and that these may need to change over time as canopy closure occurs and forest density increases.
Projects must provide information on the acquisition parameters that are used, and the guidance for each provided below should be considered in how the acquisition parameters are tailored to the project area, but do not represent strict requirements:
Alternative airborne methods for generation of canopy height maps may be eligible in consultation with Isometric.
For each flight, the following must be reported:
The recommended quality control process will differ between instruments. Techniques must be specific to high-resolution LiDAR data and be sufficiently documented to permit replication, including for quality control, filtering, and statistical analysis.
[/R-G6AN-0]Project Proponents are strongly encouraged to use standardized tools and published QA/QC protocols to maximize ease of replicability and transparency, several such protocols are referenced in Duncanson et al. (2021)59.
A typical LiDAR processing workflow consists of the following steps, the specifics of which must be documented:
Returns below 2 meters above ground must be excluded from analysis as these typically represent understory vegetation and can weaken the relationship between ALS-derived metrics and biomass densities.
[/G-G3DB-0]Project Proponents may set a lower height threshold if they are able to provide field survey data demonstrating that the altered threshold still excludes at least 90% of understory vegetation or evidence from a peer-reviewed study in the same type of ecosystem using the altered threshold.
[/G-3R90-0]Projects must report the relative vertical accuracy of each ALS acquisition, assessed as swath-to-swath agreement and smooth-surface precision in non-vegetated areas, following ASPRS (2024)10 or an equivalent standard.
[/G-QD4N-1]As the DTM is used in the calculation of vegetation height and terrain is assumed to remain stable over the Crediting Period, Projects must demonstrate terrain consistency across all acquisitions via one of the following:
Any areas where identified terrain disturbances have occurred (e.g., supplementallandslides) must be excluded from this assessment.
The data acquisition and processing workflow should remain consistent across the Crediting Period, and consolidatedany vertical accuracy requirements.]
Digital Elevation Model (DEM) datamodifications must adherebe to fundamental, supplemental,disclosed and consolidated vertical accuracy requirements6justified.
This section describes the requirements for developing and applying ALS-based predictive models towhich link ALS structure data to AGB. PreviouslyThroughout developedthis modelssection, willtraining beis consideredused acceptableto refer to this process of model fitting and calibration. Section 8 further details the requirements for usethe whenassessment documentationof model performance (validation) and uncertainty. This is provideddone onvia a benchmarking process which requires periodic collection of field plots from the developmentproject of the model that demonstrates these procedures were followedarea.
Overlapping ground plots with ALS plots are required to develop ALS-based predictive models.
These plots by default should be within the project area, but may be outside the project area conditional on consultation withModel and approvalTraining by Isometric. Specific requirements for ground plot measurements include:
Plot Selection:
Plot Size:
Plot Measurements:
See Area-based quantification Module for requirements and details
Predictive ALS-based AGB maps have been developed with a variety of statistical models. The selection of the best modeling approach will be site and project-specific. The following types of models are acceptable for use:
It is recommended to use the simplest possible statistical model that yields high-performance. White et al. (2017)4, in particular Tables 4, 5 and 6 therein can be used to support key decisions and considerations in selecting a modeling approach.
Regardless of the particular type of model selected from the above options, models used to estimate AGB must:
Modeling approaches must be based on peer-reviewed methodologies,those with evidence provided of prior usageapplication in peer-reviewed studies or inoperational applications in industry or government;
In general, it is expected that the model will be trained on measurements of biomass collected via field plots from the project area collected alongside ALS data. Where field plots are specifically collected for model training purposes the field measurements should follow the requirements in Section 8.1. Training data may also include other supplementary data sources and types (e.g., national or regional inventory plots; terrestrial laser scanning data).
Data used to train the model must be kept separate from the benchmarking plots used to validate it, except where validation follows the cross-validation procedures in Section 8.2.1.
[/G-WCC8-0]Projects must document the following details related to the model development and training:
Any models used under this Module must be well-validatedmetrics and skillfultheir forprocessing the purpose for which they are used forsteps. ProofThis ofsame model validation can be achieved through either:
All models must undergo a skill assessment based on a test dataset not used for model development or training. The test data must include data that is representative of the project area.
Model skill assessment must report R2, RMSE, bias, and a 1:1 plot of model performance. The model skill assessmentprocessing must be used to inform a conservative uncertainty discount.
Documentation of the inputabove parametermust rangebe forsufficient whichenough to enable reproduction of the model was developed and validated must be reported, as the skill assessment is only applicable within this rangeresults.
Onceprovide details on the modelprocedure hasthey beenuse developed,to itgenerate canthe beAGB map and calculate aboveground and belowground biomass in sufficient detail to reproduce the result. ]
Calibrated models are then applied to ALSthe LiDAR data collected from the project area (see Section 5.0) to generate anthe biomass estimate maps that feed into the quantification of aboveground and belowground biomass (see Section 4.0). Projects must provide details on the procedure they use to generate the AGB map and calculate aboveground and belowground biomass in sufficient detail to reproduce the result. The following requirements ensure appropriate model use:
At each verification, Projects must report the range of ALS metric values measured in the project area relative to the range of values over which the model was developedtrained toand ensurevalidated. Projects may only apply the model is being appropriately applied.]
If the model is developed using leaf-on data, it must not be applied to leaf-off data, and vice versa.
Non-parametric models commonly exhibit a phenomenon called “regression-to-the-mean”. Machine learning models work by optimizing a loss function withWhere the goalmodel is updated over the course of obtaining the lowestCrediting possible error rate. Often, the lowest possible error will be obtained by over-estimating areas with low AGB densities and under-estimating areas with large AGB densities. This can be observed in the one-to-one regression plots of many papersPeriod (e.g., seenew Figuretraining 3data are incorporated), Panelthe 1updated model should be applied retroactively to any prior ALS data collections used in Pflugmacher et al., 2014)14.
When a model exhibits regression to the mean,overall itremovals is not appropriate to simply sum the pixel values within a given area as the systematic error of the model has not been accounted for. This is a considerable problem for regrowth modeling. Non-parametric models that use satellite imagery will almost always dramatically over-estimate low-biomass densities. Similarly, there is good evidence that the “green-up” of stands to pre-disturbance levels in moderate resolution vegetation indices will predate the actual structural regeneration of the stand by many years15.
Model-assisted estimation is a framework that allows ancillary information to be incorporated into the estimation procedure. This can allow for more precise estimates of AGB density. The typical setup for a model-assisted estimation procedure is as follows:
Details for model-assisted estimation, and an associated R package, can be found in McConville et al. (2020)16.
There are many geostatistical considerations that come into play when developing statistical models. Spatial autocorrelation can violate the assumption of independence. This is why clustered plot designs are less efficient than other sampling schemes; the clustered plots are effectively pseudo-replicates. Under a design-based model-assisted framework, this is not a concern. However, it is a concern if the pixels in a map are being summed as all pixels within the same forest patch are pseudo-replicates. Therefore, the sampling size is falsely inflated, given an optimistic estimate of the variance of the estimated meancalculation.
The ALS data must be benchmarked against field plot measurements collected in the Project Area, at least once every 5 years during the Crediting Period unless otherwise specified in the Protocol or Module the Project is crediting against.
[/R-FNJ6-0]The benchmarking process serves two purposes. These data are used both to validate the model and assess its skill in the project context (see Section 8.2), and are further used to support the broader uncertainty assessment.
Benchmarking must use field plot measurements mustof followwoody biomass collected within the Project Area following the requirements set forth inwithin the Area-based Quantification of AbovegroundWoody Biomass Module, with the exceptions and additions below.
Uses
See Module for requirements and details regarding quantification of vegetationwoody speciesbiomass via field plot measurements.
In addition to the considerations for field sampling included in the referenced Module, field plots forBecause the purpose of validatingbenchmarking anis externalto characterize the map's performance across the range of conditions to which it is applied, rather than to estimate mean stock directly, there may be differences in how the sampling design is structured. The sampling design must adherebe structured to capture the followingfull range of AGB values present within the project area. Projects are encouraged to develop a stratification approach informed by differences in planting design, management, and/or environmental factors. Projects must provide justification for the sampling design used. Over the course of the Crediting Period, it is recommended to use Structurally Guided Sampling to further guide plot selection to ensure adequate representation of the range of forest conditions and to address any gaps identified in prior benchmarking events. In Structurally Guided Sampling, ALS metrics (e.g., height) are used as the source of data for stratification. See Goodbody et al., 202315 for more details on Structurally Guided Sampling.
Model performance must be assessed at each benchmarking event using out-of-sample data from the fieldbenchmarking plots are(i.e., statisticallyplots equivalenton which model performance is being assessed were not used to train the ALSmodel). dataThis atcan 90%be confidencedone witheither +/- 10% allowable error.]by:
Validation plots must be spatially independent of the plots used for model training. This is met by one of the following:
The model skill assessment must report the following validation metrics:
If the model skill assessment indicates a systematic bias a correction must be applied and documented and the validation reassessed.
[/G-KGBH-0]Any updates to the model as part of the benchmarking event must be done prior to the validation assessment. The validated model must then be used until the next benchmarking event.
[/G-TT2V-0]Projects using cross-validation procedures wherein the benchmark data are also used to support training must meet the following requirements:
Models and measurements of above-ground biomass inherently include uncertainty from various data sources which contribute to the quantification.
While it is not expected that all uncertainties are exhaustively quantified, Project Proponents must evaluate, report, and conservatively account for identifiable and significant sources following the approved approaches outlined in the corresponding section of the Isometric Standard. This must be done and reported for all key uncertainty sources.
[/G-CSJ4-0]Potential sources of uncertainty to consider include, but are not limited to:
The uncertainty associated with the ALS data collection and woody biomass quantification are used to support the overall uncertainty assessment within the Protocol under which the project is crediting.
Project Proponents mustare reportresponsible for reporting the followingrequired information in this module in the PDD, to ensure transparency and withat enougheach detailverification. toProject allowProponents are also responsible for repeatability:
Datamaintaining acquisition:
ALS Acquisition (see Section 5)
ALS ProjectsProcessing must(see provideSection the6)
Model altitudeDevelopment and velocityTraining ofData drone/plane
Data
Ground plots used for model development:
Model developmentApplication (see Section 7.2)
Benchmarking Plots (see Section 8.0)
Validation (see Section 8.2)
Uncertainty generated(see AGBSection map for the project area.]9)
Field measurements for benchmarking:
Assessment of major sources of uncertainty (e.g., model uncertainty estimates):
For each verification, Project Proponents must submit a description and copies of any data used and/or collected for the biomass quantification and benchmarking.
In addition to a primary certified Validation and Verification Body (VVB), independent third-party consultants may be required for the evaluation of ALS-based quantification. Consultants must have relevant experience with quantification of AGB using an area-based approach via LiDAR. This must be demonstrated through work experience, post-graduate degrees, research projects, peer-reviewed papers, or equivalent experience.
Isometric would like to thank Renosterthe forfollowing theirexternal extensivecontributors feedback duringto this Module's:
Pan, Y., Birdsey, R. A., Fang, J., Houghton, R., Kauppi, P. E., Kurz, W. A., Phillips, O.L., Shvidenko, A., Lewis, S.L., Canadell, J.G., Ciais, P., Jackson, R.B., Pacala, S.W., McGuire, A.D., Piao, S., Rautiainen, A., Sitch, S., & Hayes, D. (2011). A large and persistent carbon sink in the world’s forests. Science, 333(6045), 988-993. https://doi.org/10.1126/science.1201609↩
White, J. (2013). A best practices guide for generating forest inventory attributes from airborne laser scanning data using an area-based approach (INFORMATION REPORT FI-X-010). Natural Resources Canada. https://ostr-backend-prod.azurewebsites.net/server/api/core/bitstreams/3eac62d1-8765-48cb-a48e-a777eb8ae015/content↩↩2
Næsset, E. (2013). Area-based inventory in Norway–from innovation to an operational reality. In Forestry applications of airborne laser scanning: concepts and case studies (pp. 215-240). Dordrecht: Springer Netherlands. ↩
White, J. C., Tompalski, P., Vastaranta, M. A., Wulder, M. A., Saarinen, N. P., Stepper, C., & Coops, N. C. (2017). A model development and application guide for generating an enhanced forest inventory using airborne laser scanning data and an area-based approach. Natural Resources Canada. ↩↩2
Doraisami, M., Kish, R., Paroshy, N. J., Domke, G. M., Thomas, S. C., & Martin, A. R. (2022). A global database of woody tissue carbon concentrations. Scientific Data, 9(1), 284. https://doi.org/10.1038/s41597-022-01396-1↩
Aalde, Harald. vol. 4, Institute for Global Environmental Strategies (IGES), 2006. IPCC Guidelines for National Greenhouse Gas Inventories: Agriculture, Forestry and Other Land Use. https://www.osti.gov/etdeweb/biblio/20880391↩↩2↩3
McGroddy, M. E., Daufresne, T., & Hedin, L. O. (2004). Scaling of C: N: P stoichiometry in forests worldwide: Implications of terrestrial redfield‐type ratios. Ecology, 85(9), 2390-2401. https://doi.org/10.1890/03-0351↩
Kattge, J., Bönisch, G., Díaz, S., Lavorel, S., Prentice, I. C., Leadley, P., ... & Cuntz, M. (2020). TRY plant trait database–enhanced coverage and open access. Global change biology, 26(1), 119-188. ↩
Duncanson, L., Armston, J., Disney, M., Avitabile, V., Barbier, N., Calders, K., Carter, S., Chave, J., Herold, M., MacBean, N., McRoberts, R., Minor, D., Paul, K., Réjou-Méchain, M., Roxburgh, S., Williams, M., Albinet, C., Baker, T., Bartholomeus, H., Bastin, J.F., Coomes, D., Crowther, T., Davies, S., de Bruin, S., De Kauwe, M., Domke, G., Dubayah, R., Falkowski, M., Fatoyinbo, L., Goetz, S., Jantz, P., Jonckheere, I., Jucker, T., Kay, H., Kellner, J., Labriere, N., Lucas, R., Mitchard, E., Morsdorf, F., Næsset, E., Park, T., Phillips, O.L., Ploton, P., Puliti, S., Quegan, S., Saatchi, S., Schaaf, C., Schepaschenko, D., Scipal, K., Stovall, A., Thiel, C., Wulder, M.A., Camacho, F., Nickeson, J., Román, M., Margolis, H. (2021). Aboveground Woody Biomass Product Validation Good Practices Protocol. Version 1.0. In L. Duncanson, M. Disney, J. Armston, J. Nickeson, D. Minor, and F. Camacho (Eds.), Good Practices for Satellite-Derived and Product Validation, (p. 236): Land Product Validation Subgroup (WGCV/CEOS), doi:10.5067/doc/ceoswgcv/lpv/agb.001 ↩↩2
NDEP,American NSociety for Photogrammetry and Remote Sensing (ASPRS). (20042024). GuidelinesASPRS Positional Accuracy Standards for Digital ElevationGeospatial Data. Retrieved(Edition December2, 7,Version 2010. https://it.nc.gov/documents/files/national-digital-elevation-program-guidelines/download?attachment↩
Goodbody, T. R., Coops, N. C., Queinnec, M., White, J. C., Tompalski, P., Hudak, A. T., Auty, D., Valbuena, R., LeBoeuf, A., Sinclair, I., McCartney, G., Prieur, J., & Woods, M. E. (20232). sgsR: a structurally guided sampling toolbox for LiDAR-based forest inventories. Forestry, 96(4), 411-424ASPRS. https://doi.org/10.109314358/forestry/cpac055↩
Gobakken, TASPRS., & Næsset, EPAS. (2009). Assessing effects of positioning errors and sample plot size on biophysical stand properties derived from airborne laser scanner data. Canadian Journal of Forest Research, 39(5), 1036-1052. https://cdnsciencepub.com/doi/abs/10.1139/X09-0252024↩
Queinnec, M., Coops, N. C., White, J. C., McCartney, G., & Sinclair, I. (2022). Developing a forest inventory approach using airborne single photon lidar data: from ground plot selection to forest attribute prediction. Forestry: An International Journal of Forest Research, 95(3), 347-362. https://doi.org/10.1093/forestry/cpab051↩
Ayrey, E., Hayes, D. J., Kilbride, J. B., Fraver, S., Kershaw, J. A., Cook, B. D., & Weiskittel, A. R. (2021). Synthesizing disparate LiDAR and satellite datasets through deep learning to generate wall-to-wall regional inventories for the complex, mixed-species forests of the eastern United States. Remote Sensing, 13(24), 5113. https://doi.org/10.3390/rs13245113↩
Meyer, H., & Pebesma, E. (2021). Predicting into unknown space? Estimating the area of applicability of spatial prediction models. Methods in Ecology and Evolution, 12(9), 1620-1633. https://doi.org/10.1111/2041-210X.13650↩
Johnson, L. K., Mahoney, M. J., Bevilacqua, E., Stehman, S. V., Domke, G. M., & Beier, C. M. (2022). Fine-resolution landscape-scale biomass mapping using a spatiotemporal patchwork of LiDAR coverages. International Journal of Applied Earth Observation and Geoinformation, 114, 103059. https://doi.org/10.1016/j.jag.2022.103059↩
ZolkosGoodbody, ST. R., Coops, N. C., Queinnec, M., White, J. C., Tompalski, P., Hudak, A. T., Auty, D., Valbuena, R., LeBoeuf, A., Sinclair, I., McCartney, G., GoetzPrieur, S. J., & DubayahWoods, RM. E. (20132023). AsgsR: metaa structurally guided sampling toolbox for LiDAR-analysisbased offorest terrestrial aboveground biomass estimation using lidar remote sensinginventories. Remote sensing of environmentForestry, 12896(4), 289411-298.https://doi.org/10.1016/j.rse.2012.10.017↩
Pflugmacher, D., Cohen, W. B., Kennedy, R. E., & Yang, Z. (2014). Using Landsat-derived disturbance and recovery history and lidar to map forest biomass dynamics. Remote Sensing of Environment, 151, 124-137424. https://doi.org/10.10161093/j.rse.2013.05.033↩
Pickell, P. D., Hermosilla, T., Frazier, R. J., Coops, N. C., & Wulder, M. A. (2016). Forest recovery trends derived from Landsat time series for North American boreal forests. International Journal of Remote Sensing, 37(1), 138-149. https:forestry//doi.org/10.1080/2150704X.2015.1126375↩
McConville, K.S., Moisen, G. G., & Frescino, T. S. (2020). A Tutorial on Model-Assisted Estimation with Application to Forest Inventory. Forests. 11(2), 244. https://doi.org/10.3390/f11020244cpac055↩