This Module establishes the requirements associated with the use of feedstocks as a part of carbonBiomass dioxideCarbon removalRemoval and Storage (BiCRS)Projects. This includesModule settingensures out criteria foreligible feedstocks are sourced in relationcompliance towith rigorous scientific and economic standards, covering sustainability, counterfactual storage and market leakage, and, for feedstocks harvested or cultivated for CDR, quantifying direct and indirect land-use change. This Module alsoprovides providesrobust methods for calculating the GHG impacts associated with market leakage, and methods for the quantification of counterfactual storage to ensure carbon removals generated from biomass reflect a real, beneficial and markettangible leakageclimate to determine eligible feedstocksimpact.
This Module is currently applicable to the following feedstocks:
EveryThe following feedstocks are ineligible under this Module:
All feedstocks must comply with the requirements in Section 1.5 and Section 1.6. Residue Feedstocks must be accounted for using the requirements in Section 2. Purpose-Grown Feedstocks must be accounted for using the requirements in Section 3, and Standing Stock Feedstocks using the requirements in Section 4. Indirect land-use change for Purpose-Grown Feedstocks is quantified under Section 3.5; Standing Stock Feedstocks must not displace productivity and are not assessed for indirect land-use change (see SSC1.4 and SSC2.6).
Purpose-Grown Feedstocks are feedstocks cultivated for CDR whose production would not have occurred at the same scale in the absence of CDR revenue, for example switchgrass cultivated on non-agricultural land or algae grown in bioreactors. Standing Stock Feedstocks are biomass removed from an existing stock not cultivated by the Project that would have remained in a living carbon stock, such as an abandoned plantation stand, rather than being harvested in the absence of CDR revenue. This includes cases where a Project performs wildfire mitigation itself rather than absorbing residual biomass streams from existing activities (see Appendix E.2). A feedstock must be treated as Purpose-Grown or standing stock, rather than as a Residue, where either (a) the biomass would not have been grown in the counterfactual, or (b) the biomass would have remained in a living carbon stock rather than being harvested. Conversely, biomass whose removal was already scheduled or legally committed and funded independently of CDR revenue (a pre-committed removal) is a Residue, even where the Project performs or takes over the removal, and must be assessed under SC7 in Section 2.3.7.
A Residue Feedstock is defined as a product that is not an economic driver of the process it is produced in. Where Project demand may increase the marginal production of a residue, for example sourcing feedstock above a traceable surplus level, without changing the traceable supplier's behavior, land area or harvested stock, the feedstock remains a Residue, but the Project must account for the resulting upstream production emissions in line with the Isometric GHG Accounting Module. Where the induced increase would require additional land, removal of standing stock or a change in the primary process's output, the marginal feedstock is considered Purpose-Grown or standing stock.
This Module applies to all pathways wishing to register Certificates with Isometric using biomass feedstocks to sequester carbon. All feedstocks utilized by a Project must be registered with Isometric and comply with all applicable criteria within this Module. The rules for a Project to follow updated Module requirements can be found in the relevant section of the Isometric Standard, and vary based on Project stage.
Certificates registered with Isometric are always verified by a VVB. Some requirements outlined in this Module are only necessary to assess at Project initiation, known as Validation Requirements, while some requirements necessitate ongoing evidence submission applicable to each Reporting Period, known as Verification Requirements. The type of requirement can be found adjacent to the requirement text. Validation Requirements are valid for the duration of the Crediting Period, found in the relevant Protocol. Verification Requirements are assessed at the end of each Reporting Period, prior to the issuance of Certificates. Where evidence to comply with a Verification Requirement contains no novel information (e.g., carbon stock inventories, sustainability assurance certificates), the Project Proponent must considerattest specificthat alternativeno usesmore recent version of feedstocks that wouldevidence exists or has been produced.
Social safeguards such as strict adherence to legality, international labor laws, and the principles of Free, Prior, and Informed Consent (FPIC) are essential to ensuring feedstock sourcing for BiCRS Projects is both equitable and sustainable. Consequently, Projects have occureda inclear the absence of the Project. The baseline scenario must be considered relativeresponsibility to eachensure feedstockfull used if the Project utilizes multiple feedstock types, in linecompliance with Sectionall 2.5.2environmental ofand social safeguards defined in the Isometric Standard., Ifas awell Projectas usesthose anyoutlined feedstock that is deemed ineligible bywithin this Module, this feedstock will not count towards Crediting. If a Project utilizes ineligible biomass for alternative uses in excess of 25% of the feedstock mass in a given Reporting Period, removals within the Reporting Period will not be Credited by Isometric.
The current approach outlined in this Module provides:
This Module waspresents developeda basedreliable, onpractical, and stringent approach to accounting for feedstock inputs in BiCRS Projects. Developed in collaboration with leading scientists and economists, this methodology is grounded in the current state of the art and publicly available science regardingconcerning biomass feedstock carbon accounting. As the Carbon Dioxide Removal (CDR) industry grows, the challenge of sourcing sustainable biomass for Biomass Carbon Removalintensifies, and Storage (BiCRS) Projects. This Module is based in part on the most up-to-date literature and models at the time of publication. Thisthis Module will continuebe adapted to address these challenges.
This Module takes a conservative stance on feedstock accounting and will be updatedaltered in future versions as scientific and& economic understanding developsimproves.
Future work to include additionalAdditional feedstocks, such as purpose-grown BiCRS feedstocks, willmay be undertakenadded as necessitated by demand and the development of robust accounting methodologies.
This Module accounts for the biomass entering a Project: whether a feedstock is eligible, the change in carbon stocks and flows driven by the Project and what the Project's demand for feedstock changes elsewhere. It does not quantify the removal itself. It is applied alongside the relevant Protocol, which sets the Crediting Period and the pathway-specific requirements.
The unit of assessment is the feedstock, not the Project. The Project Proponent prepares a feedstock submission for each feedstock the Project uses, or for each group of feedstocks meeting the conditions in Section 1.3.2, and asworks enabledthrough this Module once per submission. Sections 1.5 and 1.6 apply to every feedstock. Beyond that, the route through the Module is set by improvedits researchclassification. A feedstock is a Residue, accounted for under Section 2, a Purpose-Grown Feedstock, accounted for under Section 3, or a Standing Stock Feedstock, accounted for under Section 4.
Requirements are set out in criteria tables. Each criterion carries an ID, states whether it is a Validation Requirement, a Verification Requirement or both, and modelinglists the documentation a Project Proponent must provide to demonstrate compliance. Where several documentation options are given, the criterion states whether one or all are required. Validation Requirements are assessed once and hold for the Crediting Period; Verification Requirements are assessed every Reporting Period. The row introducing each set of criteria states which of them apply, and on what condition. Criteria are cited by ID throughout: FC (Feedstock Characterization), FS (Feedstock Storage), CU (Cascading Use), SC and ML (residue Sustainability Criteria and Market Leakage), CF and CS (Counterfactual Fate and Counterfactual Storage), PSC and SSC (Purpose-Grown and Standing Stock Sustainability Criteria), and LUD, DLUC and ILUC (Land Use Declaration, Direct Land-Use Change and Indirect Land-Use Change), each prefixed P for Purpose-Grown or S for Standing Stock Feedstocks (Standing Stock Feedstocks have no ILUC criteria), for example PDLUC1 and SDLUC2.
ThisThe table below maps each feedstock type to the criteria sets that apply to it.
Table 1 – Feedstock Pathway Summary
Feedstock | Characterization | Storage | Sustainability Criteria | Carbon Stock/Flow Accounting | Market Leakage |
|---|---|---|---|---|---|
Residue Feedstocks (Section 2) for all feedstocks that are produced by an established process and are not an economic driver of that process, such as sawmill residues, industrial processing residues, CO2 streams from established facilities and invasive biomass that would be felled regardless of Project intervention. | |||||
Forestry and plantation wood residues and pre-consumer wood processing residues (Section 2.3.1) | FC1 and CF1 | FS1 or FS2 | SC1 | One of CS1-CS4 | CU1 and one of ML1-ML7 |
Crop residues (Section 2.3.2) | SC2 | CU2 and one of ML1-ML7 | |||
Manure (Section 2.3.3) | SC3 | One of ML1-ML7 | |||
Controlled waste (Section 2.3.4) | SC4 | ||||
Industrial and commercial residues (Section 2.3.5) | SC5 | CU1 or CU2, and one of ML1-ML7 | |||
Biofuel CO2 byproduct streams using bioenergy crops (Section 2.3.6) | SC6 | One of ML1-ML7 | |||
Conservation and management residues (Section 2.3.7) | SC7 | CU1 or CU2, and one of ML1-ML7 | |||
Purpose-Grown Feedstocks (Section 3) for feedstocks that are cultivated for CDR, either by a Project Proponent or by a nominated third party, such as energy grass, short-rotation woody coppice or algae. | |||||
Feedstocks cultivated for CDR (PSC1, Section 3.2.1) | FC1 and PLUD1 | FS1 or FS2 | PSC1 | PDLUC1 or PDLUC2 | One of PILUC1-PILUC4 |
Standing Stock Feedstocks (Section 4) for feedstocks that exist in a standing stock, such as an invasive species, high-priority wildfire fuel or abandoned short-rotation/overcoppiced plantations, where harvest would not take place without the Project and the Project can demonstrate the landscape carbon stock will be fully regenerated or exceeded in a timely manner. | |||||
Woody standing stock (SSC1, Section 4.2.1) | FC1 and SLUD1 | FS1 or FS2 | SSC1 | One of SDLUC1-SDLUC3 | None. Feedstock must not be diverted from a productive use (SSC1.4) |
Non-woody standing stock (SSC2, Section 4.2.2) | SSC2 | SDLUC2 | None. Feedstock must not be diverted from a productive use (SSC2.6) |
While this Module is designed to apply to all Projects and feedstocks, some Projects may not be able to demonstrate compliance with a given criterion through the presented evidence options, while still being able to sufficiently demonstrate that the purpose behind a requirement has been met. Project Proponents presenting alternative evidence to demonstrate compliance with a given criterion may be eligible, subject to a case-by-case review with Isometric and the VVB. The alternative evidence must: (a) be demonstrably equivalent to, or greater than, the listed evidence options for the given criterion in demonstrating compliance with a given requirement, or purpose behind the given requirement, assessed against the specific risk the criterion is designed to address; and (b) be independently verifiable by the VVB to a standard comparable to that of the listed options, rather than relying on the Project Proponent's assertion. Isometric will document the applicable requirement, the evidence submitted, the justification for why the evidence is considered equivalent and any conditions attached to its ongoing use (e.g., expiry, revalidation date) which will be reviewed by the VVB and transparently and publicly presented on anthe annualProject's cadencepage on the Isometric registry, as well as subject to review in linethe public comment period for the PDD. Some alternative evidence for demonstrating compliance with a given Validation Requirement may necessitate the submission of ongoing evidence, necessitating coordination with Isometric and the VVB.
All feedstocks must be separated by applicable criteria to ensure they comply with the Isometricrequirements Standard.
The framework outlined inby this Module. setsFeedstocks outmay sourcingbe grouped into a single feedstock submission when they are the same feedstock type from the same Sourcing Region as specified by FC1.2, and are eligible under the same criteria thatusing qualifythe same evidence options. Where grouped feedstocks asdo eligiblenot share the same counterfactual fate and the per-tonne values of [math: CO_2e_{Counterfactual}] and [math: CO_2e_{Leakage}] differ across the group, the most conservative value must be applied to the whole group. These values must be assessed in tandem, ensuring that the counterfactual storage and market leakage associated with each given fate are quantified together and the most conservative of the combined fates, representing one consistent fate, must be selected and applied. Grouped submissions must identify every supplier and the volume attributable to each; compliance evidence must be collected for useeach insupplier BiCRSand Projectsrefreshed ineach Reporting Period where the requirement is a wayVerification Requirement. Should a single supplier or a subset of suppliers cease to comply with the requirements during the Crediting Period, the volume attributable to that ensuressupplier sustainableis sourcing and accountsineligible for the emissionsReporting impactsPeriod thatin result from market leakage. These considerations vary based onwhich the characteristicsnon-compliance arose, and sourcingall activitiessubsequent ofReporting thePeriods feedstock.
Feedstockuntil eligibilitycompliance requiresis established by the Project Proponent and verified by the VVB.
In the case where grouped feedstock characteristics (e.g., total organic carbon, moisture content) may affect the durability of the processed material (e.g., biochar), grouped feedstocks must be used in a consistent mix, or demonstrated to be consistent enough to not affect storage durability, in consultation with Isometric and the VVB. It is worth noting this is included here for guidance/visibility for assessing how to group feedstocks, while the actual durability testing is required at the Protocol level.
Where feedstock suppliers fluctuate frequently, the Project must discuss this with Isometric and the VVB prior to Validation, and all feedstock submissions must be kept up to date throughout the Crediting Period unless an aggregator is used and is contractually obliged to source from suppliers that would meet the given feedstock requirements. Where changes in suppliers during the Crediting Period are covered by existing evidence provided by the Project Proponent, the change will be assessed as a Verification event. Where changes in suppliers during the Crediting Period are not covered by the existing evidence package (e.g., where a supplier-specific affidavit or dataset is relied on), updated evidence must be submitted and assessed by the VVB prior to the issuance of Certificates. Whenever a feedstock materially changes (e.g., change/expansion of a Sourcing Region, change to the feedstock characteristics, change to the understood counterfactual fate) the Project Proponent must notify Isometric and the VVB at the earliest opportunity. In such cases, the feedstock will be revalidated unless the Project Proponent can demonstrate that the change is immaterial to Project accounting, subject to a case-by-case review by Isometric.
If a feedstock compliesis collected by the Project or from an aggregator who sources across multiple source lots (>10), the Project Proponent may collect evidence based on a statistically significant representative group of source lots in consultation with Isometric and the VVB. Such a sampling approach must meet all of the following minimum requirements:
[math: n_S = max\left( 10, \left\lfloor \left( 1 - (Section14- CL)^{\dfrac{1}{D}} \right) \cdot \left( N_S - \dfrac{D - 1}{2} \right) + 0.5 \right\rfloor \right)]
(Equation 1)
Where:
This Module is intended to cover a broad range of feedstocks mustand thentherefore undergomany furtherof evaluationthe criteria that follow are specific to assesscertain their counterfactual storage (Section 3) and market leakage (Section 4.2) valuesfeedstocks. Guidance of how to use this documentThis can be seen in Figureboth 1the below.
SectionFigure 41
For use byguides a Project Proponentthrough what criteria apply to its feedstock.
Figure 1 – Module Decision Logic
[Image: BFAv1.4Figure1v5]
To ensure precise communication and minimize ambiguity while maintaining a concise text length, this Module utilizes specific technical terms. The primary concepts referenced throughout the document are outlined below.
Feedstock
The raw material that is used for CreditingCO2 Removal.
Feedstock Supplier
The entity from which the Project Proponent obtains the feedstock, and to which any payment for the feedstock sourcingis made. This may be the entity that physically produces the feedstock (for example a farmer generating corn stover, a conservation organization clearing invasive species, or an oat hulling facility) or an intermediary such as an aggregator or broker. Where an intermediary is used, certain requirements such as the revenue tests in Section 2.5.1 must be deemedapplied sustainableto the entity whose production, sourcing or management behavior could be influenced by the payment, rather than the intermediary.
Sourcing TheRegion
A followingregion sectioncovering outlinesthe howarea from which a Project Proponentfeedstock is required to assess whether their feedstock sourcing is sustainable and provide evidence of sustainability for their feedstock type. In some instances, sustainabilityor criteriacould also include an evaluation of market leakage (e.g.be, SC5.1).
The following information must be submitted as part of the verification for each Reporting Period:
Feedstock Batch
A batch is a discrete unit of feedstock. This is defined as a specific feedstock type (e.g., SC1sawdust) grouped by the volume that is used in a given Reporting Period (e.g., 1 month). Each batch is automatically assigned a unique ID for traceability in the Isometric Certify platform.
Feedstock Submission
Similar to a PDD, but specifically for a feedstock. A feedstock submission contains all relevant documentation for a Project Proponent to demonstrate compliance with the applicable criteria within this Module. See Section 1.3.2 for the conditions under which feedstocks may be grouped into a single submission.
Residue
A product that is not an economic driver of the process it is produced in.
Purpose-Grown Feedstock
Feedstocks cultivated for CDR specifically, or where CDR revenue is a sufficient financial aspect that stimulates, increases or maintains feedstock cultivation.
Standing Stock Feedstock
Biomass removed for CDR from an existing stock that was not cultivated or established by the Project, such as a plantation or invasive stand, where CDR revenue is a sufficient financial aspect that stimulates, increases or maintains the harvest. Includes restoration removals and SC1sustained-yield harvests performed by or for the Project.
Nameplate Capacity
The maximum, full-load output that a given generator or facility can sustain under ideal conditions.
Eligible Retrofit Project
A Project in which an underlying facility, established to produce non-CDR Primary Product(s), is subsequently modified to capture, or improve the capture of, carbon dioxide. Waste streams from the existing process are utilized for CDR and the demand for biomass feedstock is demonstrated to exist independently of the CDR Project. Projects must demonstrate compliance with the requirements in Appendix E.1 to be considered an Eligible Retrofit Project.
Eligible Integration Project
A CDR Project that incorporates a CDR process into a newly or recently constructed industrial or engineered process. Waste streams from the process are utilized for CDR and the demand for biomass feedstock is demonstrated to exist independently of the CDR Project. Projects must demonstrate compliance with the requirements in Appendix E.1 to be considered an Eligible Integration Project.
Sustainable Usage Rate (SUR)
The rate at which a feedstock can be removed from a location or process without affecting the feedstock's environmental benefit.
Baseline Feedstock Generation Rate
The rate at which a feedstock is generated by a producer, facility or process in the absence of the Project.
Baseline Feedstock Consumption Rate
For Eligible Retrofit and Integration Projects, the rate at which the underlying facility consumes a given feedstock.
Counterfactual
What would have happened in the absence of the Project.
Carbon Stock
The quantity of carbon held within a given reservoir or landscape. This often refers to the aboveground biomass, belowground biomass and the organic carbon contained within soil in a given area.
Direct Land-Use Change (dLUC)
The physical conversion of a given parcel of land from one management category, or natural state, to another.
Indirect Land-Use Change (ILUC)
The effect of using previously productive land or an agricultural commodity for an alternative use, shifting the Pre-Project Productivity to another, often untraceable, land parcel. A form of market leakage.
Upon submission to Isometric, Project Proponents must provide the following information to Isometric and the VVB at Validation, and ensure this list is up to date at each Verification:
Table 2 – Feedstock Characterization Criteria
Criterion ID and Type | Requirement | Documentation Requirements | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
FC1: All feedstock submissions must provide all feedstock supplier details, the feedstock Sourcing Region, the chain or chains of custody, the demand for the feedstock at scale and the feedstock characteristics. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
FC1.1Validation and Verification Requirement | [R-CWFE-1, The feedstock supplier(s) are defined. For more details on how to handle feedstock aggregators/intermediaries, handling diverse feedstock portfolios and more, see Section 1.3.2 and The feedstock supplier(s) are defined. For more details on how to handle feedstock aggregators/intermediaries, handling diverse feedstock portfolios and more, see Section 1.3.2 | [G-MJVQ-0, The Project Proponent must
1.6 Feedstock Storage ConditionsThe storage of feedstock prior to utilization can result in anaerobic decomposition that results in methane emissions depending on the feedstock composition, storage duration and the conditions of storage. When a All feedstocks must demonstrate compliance with FS1.1 or FS2.1. Table 3 – Feedstock Storage Criteria
1.6.1 Feedstock Storage EmissionsProjects that cannot demonstrate feedstock compliance with FS1 must quantify the emissions impact from increasing the CH4 emissions due to feedstock storage. Projects must use the following equations to calculate the emissions that must be subtracted from gross removals associated with each feedstock delivery as a Project emission.
(Equation 2) Where:
(Equation 3) Where:
2.0 Residue Accounting2.1 Residue Feedstock ApplicabilityThe following sections contain all requirements of biomass feedstock accounting applicable to residual biomass, defined as a product that is not an economic driver of the process it is produced in. This includes feedstocks such as forest/plantation residues, sawmill residues, crop residues, food processing residues, industrial/commercial residues and controlled wastes, among others. For Projects that use Purpose-Grown or Standing Stock Feedstocks, defined as feedstocks cultivated for CDR, or This section of the
Feedstocks assessed under this section must demonstrate compliance with the Feedstock Characterization and Storage requirements in Sections 1.5 and 1.6. Where a Project sources a mix of Purpose-Grown, Standing Stock and Residue Feedstocks, each category must be assessed under its respective section with results aggregated at the Project level. 2.2 Cascading UseAs well as all sustainability, counterfactual and market leakage criteria, Residue Feedstock submissions assessed under SC1, SC2, SC5 or SC7 must comply with the criteria in this section to demonstrate that the feedstock is a suitable CDR feedstock. Projects must provide evidence that the feedstock does not divert biomass from food, feed, or long-lived products: for woody feedstocks, that the feedstock is not both suitable for and in demand for use in wood-based products, and for all other feedstocks, that the feedstock has not been used for food or feed. This is due to the unacceptable risk of market leakage associated with diverting these feedstocks from these purposes. Any assessment of market leakage in these cases would likely constitute a direct replacement with the diverted product, resulting in limited atmospheric benefit. For woody feedstocks, this is compounded by direct extraction from long-rotation woody stands as well as a significant counterfactual storage penalty where the diverted wood-based product would have stored carbon. Feedstock submissions assessed under SC1, SC2, SC5 or SC7 must demonstrate compliance with the Cascading Use (CU) criteria. CU1 must be complied with where the feedstock is woody. CU2 must be complied with where the feedstock is non-woody. If a feedstock submission does not demonstrate compliance with the CU criterion that applies to it, the feedstock will not be considered eligible and will not result in the generation of carbon removals registered with Isometric. The CU criteria do not apply to manure (SC3), controlled waste (SC4), biofuel CO2 byproduct streams (SC6) or CO2 streams from Eligible Retrofit or Integration Projects (see Appendix E.1). Table 4 – Cascading Use Criteria
2.3 Residue SustainabilitySustainable feedstock sourcing is essential both for preventing the depletion of natural resources and for ensuring that sourcing is carried out in an environmentally and socially responsible manner. Sustainability criteria are used to differentiate eligible feedstocks from those obtained through unacceptable practices. This is a binary determination – a Project's feedstock is considered eligible to generate removals or not. All Residue Feedstock submissions must demonstrate their compliance with one of the following sustainability criteria (SC) sets, depending on the feedstock type. Table 5 – Residue Sustainability Criteria by Feedstock Type
2.3.1 Forestry & Plantation Wood Residues & Pre-Consumer Wood Processing Residues (SC1)The following criteria apply where the feedstock is a Residue from forest management or timber plantation management (such as slash, pre-commercial thinnings and biogenic CO2 streams from facilities combusting these feedstocks) or wood-based residues from wood processing facilities downstream of forestry/plantation management (such as sawdust, offcuts, bark, wood chips) that are unavoidable byproducts of timber/wood-based product production and silvicultural practices. Feedstocks that meet this description must demonstrate compliance with SC1.1 and SC1.2 and SC1.3. Residues from wildfire mitigation The sourcing of feedstock from forests and plantations faces the most stringent requirements. This is because unsustainable harvesting in these areas can cause substantial, often underreported, environmental damage. Such damage includes the destruction of soil carbon stocks due to improper felling techniques and inadequate residue retention, as well as significant disruption from uncontrolled mechanical or chemical interventions. Furthermore, unsustainable forestry harms vital ecosystem services like water quality, carbon sequestration, habitat provision and pollination while also limiting the use of woodlands for non-timber forest products. Given that forests and plantations are significant carbon sinks, storing large amounts of carbon both above- and belowground, and the important role they play in climate, ecosystem and community health, they are subject to the most rigorous sustainability assurance guardrails, executed by third-party engagement and auditing. Table 6 – Forestry & Plantation Wood Residue Sustainability Criteria (SC1)
2.3.2.1 Distinguishing Crop Residues From Industrial and Commercial ResiduesCrop residues are assessed under SC2 and industrial and commercial residues under SC5 because the risks to be managed differ. A crop residue is directly generated by agriculture and is usually collected at the farm level or by a field-level aggregator; it remains linked to the land, so SC2 addresses the history of that land (SC2.1, SC2.2) and the effect of removal on soil quality and soil carbon (SC2.3). An industrial or commercial residue is collected from a facility that processes the agricultural product, such as an oat hulling plant, a sugar mill or a rice husking facility; it has already been separated from the land by a processing step, so these land-level requirements are not applied. A pre-processing step, such as drying or grinding, does not change a crop residue into an industrial residue. Market leakage from increased demand for any residue is addressed separately under Section 2.5. 2.3.3 Manure (SC3)The feedstock is manure, produced as a byproduct of animal agriculture, or a biogenic CO2 stream from a facility processing this material, such as an anaerobic digester. Feedstocks that meet this description must demonstrate compliance with SC3.1. Table 8 – Manure Sustainability Criteria (SC3)
2.3.5 Industrial & Commercial Residues (SC5)The feedstock is a Residue generated by an industrial or processing step distinct from the activity that produced the Primary Product, such as residues produced from food/beverage processing facilities, urban landscaping residues, green waste, compost overs or a CO2 stream from facilities using these residues (see Section 2.3.2.1 for how this is distinguished from crop residues, assessed under SC2). Feedstocks that meet this description must demonstrate compliance with SC5.1 and SC5.2. Pre-consumer sawmill residues are not eligible under this criterion and must demonstrate compliance with SC1. CO2 streams from the production of biofuels using energy crops are not eligible under this criterion and must demonstrate compliance with SC6. Post-industrial and post-consumer woody waste obtained directly from the industry or business that generates it, such as a pallet manufacturer or recycler, a utility replacing poles or a rail operator replacing ties, has not passed through a waste sorting step that tests whether it could be re-used or recycled. Such feedstocks are assessed under SC5 and must also comply with CU1.1. Woody waste received from a controlled waste stream, such as construction and demolition waste, is assessed under SC4 (see Section 2.3.4). Table 10 – Industrial & Commercial Residue Sustainability Criteria (SC5)
2.3.6 Biofuel CO2 Byproduct Streams Using Bioenergy Crops (SC6)The feedstock is a CO2 stream from the production of biofuels using dedicated energy crops (such as sugar beet, sugarcane and maize). For feedstocks that meet this description, the corresponding biofuel feedstock must demonstrate compliance with SC6.1 and SC6.2 and SC6.3. Other residues from the production of biofuels, such as post-anaerobic digestate or Table 11 – Biofuel CO2 Byproduct Stream Sustainability Criteria (SC6)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
SC6.2Validation Requirement | [R-GY33-0, The biofuel feedstock must not originate from crops cultivated on land that held any of the listed statuses in or after January 2008, whether or not the land continues to hold that status.] The biofuel feedstock must not originate from crops cultivated on land that held any of the following statuses in or after January 2008, whether or not the land continues to hold that status:
| [G-RJQT-0, The Project Proponent must demonstrate that the feedstock does not originate from land that held any of the listed statuses in or after January 2008.] The Project Proponent must provide one of the following:
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
SC6.3Validation Requirement | [R-4JYR-0, The feedstock must not originate from crops cultivated on land that held any of the listed statuses in January 2008 and no longer holds that status.] The feedstock must not originate from crops cultivated on land that held any of the following statuses in January 2008, and no longer holds that status:
| [G-C7KF-0, The Project Proponent must demonstrate that the feedstock does not originate from land that held any of the listed statuses in January 2008 and no longer holds that status.] The Project Proponent must provide one of the following:
|
Criterion ID and Type | Requirement | Documentation Requirements |
SC7.1Validation Requirement | [R-WPQD-1, The feedstock must originate from a documented conservation, habitat or ecological management activity undertaken for ecological, safety or land management purposes independent of the Project.] The feedstock must originate from a documented conservation, habitat or ecological management activity undertaken for ecological, safety or land management purposes independent of the Project. Eligible management activities include but are not limited to:
| [G-ZWF4-0, The Project Proponent must demonstrate that the feedstock originates from a documented conservation, habitat or ecological management activity undertaken for ecological, safety or land management purposes independent of the Project.] The Project Proponent must provide one of the following:
|
SC7.2Validation or Verification Requirement | [R-BWP2-0, The volume of feedstock obtained by the Project must not exceed the volume that would have been generated by the conservation or management activity in the absence of the Project, including existing feedstock end-use.] The volume of feedstock obtained by the Project must not exceed the volume that would have been generated by the conservation or management activity in the absence of the Project, including existing feedstock end-use. [/R-BWP2-0] | [G-KHAS-0, The Project Proponent must demonstrate that the feedstock sourcing will The Project Proponent must provide one of the following:
|
SC7.3Validation Requirement | [R-ZHHQ-0, Where applicable, the recovery and transportation of the feedstock must not compromise biosecurity or increase the risk of undesired proliferation of the feedstock species or of any pest or pathogen it carries.] Where applicable, the recovery and transportation of the feedstock must not compromise biosecurity or increase the risk of undesired proliferation of the feedstock species or of any pest or pathogen it carries. [/R-ZHHQ-0] | [G-766E-0, The Project Proponent must demonstrate that the feedstock sourcing does not risk the spread of invasive species, pests or pathogens.] The Project Proponent must provide one of the following:
|
Carbon Certificates generated through Biomass Carbon Removal and Storage Projects only represent a genuine climate benefit when they reflect a measurable reduction in atmospheric carbon dioxide concentrations relative to what would have occurred in the absence of the Project within a defined timeframe. This principle is foundational to carbon accounting. This aligns with bodies such as the UNFCCC Article 6.4 Supervisory Body4, the EU Expert Group on Carbon Removals and the leading carbon removal buyers that define removals as the net change in GHG reservoirs, calculated by subtracting the sum of the change in GHGs stored in each applicable GHG reservoir in the baseline scenario from the sum of the change in GHGs stored in each applicable GHG reservoir in the Project scenario.
AccountingIn forplain counterfactualterms, storagea ensurescarbon Creditsremoval accuratelymust reflect the difference between the Project's actualscenario climateand impact,the preventingbaseline overstatementscenario. Accounting simply for the gross quantity of removalscarbon captured – and assuming "carbon neutrality" by accountingdefault for– carries risks of claiming carbon removals that in actuality are shifts in carbon between durable sinks.
Biomass often serves as a carbon sink absent any human intervention. A pile of slowly decomposing coarse woody debris in boreal forests, structural timber that would otherwise remain in use, or biotic soil amendments that would remain below the soil surface all hold carbon that would have stayedremain out of the atmosphere for longmeaningful periods regardlessin the absence of any Project intervention, sometimes exceeding the duration of carbon removals issued under other pathways.
Ignoring this feature of the biomass's lifecycle can lead to overstated claims of atmospheric benefits of a CDR Project. Consider the example of a BECCS Project sourcing biomass from slowly decomposing wood with a half-life of several decades. Without counterfactual accounting, assuming carbon neutrality, the Project has limited atmospheric benefit for the first several decades, compounded by establishment emissions and capture inefficiencies that accelerate carbon release, rather than halting it in the near term.
We exercise this requirement through the term "counterfactual storage". We define counterfactual storage as the carbon that would have remained stored in the biomass in the absence of the Project's intervention. ThisOnly isthe alsofraction toof ensurebiomass Projectcarbon activitiesthat would have abeen measurable impactreleased in mitigatingthe near- term climaterepresents changean additional atmospheric benefit when captured and todurably incentivize the use of feedstocks with the most near-term impactsstored.
To Evidencinginform Requirements
Projectthe Proponentscounterfactual storage assessment, all Projects must demonstrate thatdefine the counterfactual fate hasof beentheir properlyfeedstock, assesseddefined as what most likely would have happened to the feedstock in the absence of Project intervention, by demonstrating compliance with the following Counterfactual Fate (CF) criteria. This is integral to carbon accounting and theinforms both counterfactual storage hasand beenmarket appropriately quantifiedleakage. OnceCritically, this is a consideration for what would most likely have happened to the feedstock's counterfactualin the absence of the Project based on evidence, not an assumption of what could have happened given the feedstock characteristics. Isometric recognizes the complications of predicting feedstock utilization across a future scenario and encourages Project Proponents to take into account the historical fate hasof beenthe establishedfeedstock, it'sregulatory determinedshifts fateand isdeclining/growing industries.
Counterfactual storage assessments are valid for 10the yearsduration of the Crediting Period, provided the feedstock sourcing does not materially change. UnderA exceptionalmaterial circumstanceschange whereis defined as a change in Sourcing Region, feedstock specification or counterfactual fate, or an increase in feedstock consumption that invalidates the existing assessment, which voids the assessment and requires resubmission. Where the Project or Isometric identifies a significant change to the understood counterfactual fate of a feedstock, Isometric reservesmay therequire rightreassessment toand may conduct an audit to ensureconfirm feedstocksthat continuethe feedstock continues to meet the criteria laid out in this Module. TypicallyA Project Proponent may request reassessment on the grounds of drastic market shifts, regulatory shifts or the evolution of modeling approaches.
Table 13 – Counterfactual Fate Criteria
Criterion ID and Type | Requirement | Documentation Requirements |
CF1: All feedstock submissions must describe what would have happened to each feedstock in the absence of the Project. | ||
CF1.1Validation Requirement | [R-GBK2-1, The feedstock counterfactual fate must be evidenced.] The feedstock counterfactual fate must be evidenced. The Project Proponent must demonstrate that the volume of feedstock subject to the claimed counterfactual fate in the Sourcing Region meets or exceeds the Project's contracted volume. Where a Project Proponent relies on historical evidence of the counterfactual fate, that evidence must cover a minimum look-back period ending immediately before the Project start date. The minimum look-back period is five years for forestry and wood-processing residues, to capture long-term fluctuations in market trends, and three years for all other feedstocks. Where data availability or feedstock specifics justify a shorter period, a reduction may be accepted subject to a case-by-case review by Isometric and the VVB. Feedstocks with mixed counterfactual fates must be accurately assessed using mass balance. Where this data resolution is not available, the Project Proponent must select, from the fates evidenced, the fate that produces the largest counterfactual storage deduction under Section 2.4.5 when combined with the corresponding market leakage deduction under Section 2.5, so that the most conservative yet consistent counterfactual fate is selected. [/R-GBK2-1] | [G-TV23-0, The Project Proponent must demonstrate what would most likely have happened to the feedstock in the absence of the Project.] The Project Proponent must provide one of the following:
|
Some Residue Feedstocks carry negligible risk of counterfactual storage and, with robust evidence, do not need to quantify counterfactual storage. All feedstocks eligible for creditingProjects must meetdemonstrate compliance with one of the following criteria listed in Table 2 to evaluatedetermine whether counterfactual storage.
Table 14 – Counterfactual Storage Criteria
2.4.3 The Near-Term HorizonThis Module adopts a The 15-year horizon is calibrated to the urgency of near-term temperature trajectories. Certificates that represent carbon durably stored from biomass that would have otherwise decayed and released it within this window are aligned with that urgency. The horizon also creates a deliberate incentive to use feedstocks with rapid counterfactual emissions, such as feedstocks destined for combustion, fast-decaying agricultural residues and food waste, which carry limited risk of counterfactual storage and attract little or no discount. Feedstocks with slow counterfactual decay, or where re-release would not have happened in the near-term counterfactual, are assigned a proportionate discount. 2.4.4 The High-GWP HorizonFeedstocks that decay through anaerobic decomposition, such as lagooned manure and food waste in landfill, release methane in the counterfactual, in addition to CO2. Biogenic methane is a highly potent greenhouse gas, with a [math: GWP_{100}] of 27 (IPCC, AR6, WGI Chapter 7, Table 7.15), carrying significant radiative forcing implications across the near to medium term. Projects that durably store carbon from feedstocks that otherwise would have undergone anaerobic decomposition are preventing disproportionately severe climate forcing consequences and the accounting framework should reflect this. The same principle extends to feedstocks that release other highly potent GHGs in the counterfactual, such as land-applied biosolids which generate significant volumes of nitrous oxide through nitrification and denitrification of their nitrogen content; nitrous oxide has a [math: GWP_{100}] of 273 (IPCC, AR6, WGI Chapter 7, Table 7.15). This Module accounts for the disproportionate near-term climate impact of these feedstocks by extending the window of decomposition for carbon eligible to generate removals. Where counterfactual decay releases significant volumes of GHGs more potent than CO2 – principally CH4 and N2O – the ineligible carbon is determined on the basis of what carbon would remain durably stored past 50 years, rather than 15. For most feedstocks undergoing rapid anaerobic decomposition, virtually all organic carbon would have been released well within this window, meaning Projects using these feedstocks are eligible to generate removals from the full biogenic carbon content of the feedstock. Crucially, while recognizing the impacts of potent GHGs, this approach keeps all Certificates tied to stored feedstock carbon content, rather than avoided CH4 or N2O emissions, while increasing the eligibility for those feedstocks with the greatest near-term climate consequences. The near-term climate benefit of preventing high-[math: GWP] counterfactual emissions is real and substantial, but Certificates under this Module represent the durable removal of biogenic CO2 from the atmosphere, not the prevention of the release of methane or nitrous oxide, which is handled by Isometric's Superpollutant pathways. 2.4.5 Residue Counterfactual Storage QuantificationWhere Projects are required to quantify counterfactual storage under CS1, Project Proponents must use an appropriate modeling approach based on the feedstock characteristics, counterfactual fate and available data. All models must be capable of quantifying the values for [math: CO_2e_{Counterfactual,i}], by using [math: CO_2e_{CFEmissions,i,(0,15)}], [math: CO_2e_{Feedstock,i}] and [math: CO_2e_{CFStorage,i,50}] as defined below. Counterfactual storage modeling can be technically demanding, particularly for novel feedstock types or complex counterfactual scenarios. Isometric can provide direct guidance on model selection and parameterization prior to Validation. Example quantifications can be found in Appendix G. The following equation must be used to assess counterfactual storage to demonstrate compliance with CS1:
(Equation 4) Where:
|
Feedstocks that do not meet CC1 or CC2 within Table 2 must quantify counterfactual storage. Biogenic carbon that would likely be stored in the biomass for the next 15 years in the counterfactual is considered counterfactually stored.
Counterfactual storage is a quantified measurement of stored biogenic carbon, and takes into account the amount of biogenic carbon within the feedstock and the emissions associated with the release of the biogenic carbon.
Biomass decay that would leadProtocol to additional carbon storage in the landscape is taken into account (e.g., soil organic carbon gains from biomass decay). This effect may be nonlinear and Project Proponents can provide evidence of its negligibility at the feedstock removal rates.
Counterfactual storage is reported in CO2e units. Counterfactual emissions are evaluated asrepresent the CO2e using the 100-year Global Warming Potential (GWP), GWP100,content of allfeedstocks releasedto GHGsgenerate withinremovals (e.g., in subsurface biomass storage pathways).
If all stored biogenic carbon within the feedstockthat would behave emittedbeen released within 15 years in the counterfactual, thenfrom feedstock batch [math: i], expressed in tonnes of CO2e, evaluated at [math: GWP_{100}].
[math: CO_2e_{Counterfactual}] = 0. If CO2e emissions within 15 years exceed the equivalent stored biogenic carbon within the feedstock at 15 years, counterfactual storage can be quantified by the amount of biogenic CO2e that is stored after 50 years. This is to increase the eligibility of feedstocks that have a disproportionately large near-term release of GHGs with a GWP100 >1 in the counterfactual. Example calculations can be found in Appendix 6.
Equation 1 and equation 2 must be summed across all feedstock batches used in a given Reporting Period prior to quantifybeing subtracted from removals at the totalProtocol CO2elevel thatusing isthe ineligiblefollowing for Crediting.equation:
[math: CO_2e_{Counterfactual,\ xRP}\\= \\sum_{i=1}^{N_B} CO_2e_{Feedstock} \ \ - \ \ CO_2e_{CounterfactualEmissionsCounterfactual,i}]
(Equation 15)
[math: CO_2e_{CounterfactualEmissions} \ \ = \ \ min(CO_2e_{CounterfactualEmissions15}, \ \ CO_2e_{Feedstock}\ \ - \ \ CO_2e_{CounterfactualStorage50})]
(Equation 2)
Where:
For each Reporting Period, [math: CO_2e_{Counterfactual}] must be aggregated across all feedstock batches, where [math: n] is the total number of batches:
[math: CO_2e_{Counterfactual}\ \=\ \ \sum_{x=1}^{n}\ CO_2e_{Counterfactual,\ x}]
(Equation 3)
Where:
Where [math: CO_2e_{Counterfactual}] is less than 1% of the biogenic carbon contained within the feedstock batch at the point of utilization, the counterfactual storage for that feedstock batch may be recorded as zero. This is due to the recognized uncertainty associated with determining a stable counterfactual fate across the Crediting Period, the associated uncertainty and conservative parameterization of counterfactual decay modeling, together with increasing global temperatures, extreme weather events, as well as increased biomass utilization projections.
Where a feedstock acts as a counterfactual carbon sink, and Equation 4 results in counterfactual storage greater than the carbon that would remain stored at year 50, the Project Proponent may choose to account for counterfactual emissions dynamically over the Crediting Period, in addition to the upfront issuance determined under Equation 4. This is not a default requirement, but may be pursued by the Project Proponent when desired. The upfront issuance is unchanged: it remains the eligible biogenic carbon determined by the counterfactual emissions evaluated over the first 15 years, subject to the 50-year storage ceiling. Thereafter, the Project may accrue the residual biogenic carbon, determined by the counterfactual emissions that would have been released after year 15 in the counterfactual, as the Project persists, up to a counterfactual horizon of 50 years. This issuance is known as a tail issuance. Biogenic carbon that would have remained stored in the counterfactual beyond 50 years is considered durably stored and is never eligible to generate removals.
To quantify the residual tail issuances, the following equations must be used:
[math: CO_2e_{Tail,i,n} = min\left( CO_2e_{CFEmissions,i,\left( 15,T_n \right)}, CO_2e_{Counterfactual,i} - CO_2e_{CFStorage,i,50} \right)\ \\ - min\left( CO_2e_{CFEmissions,i,\left( 15,T_{n - 1} \right)}, CO_2e_{Counterfactual,i} - CO_2e_{CFStorage,i,50} \right)]
(Equation 6)
Where:
[math: CO_2e_{Tail,m} = \sum_{i:\, m_i < m} CO_2e_{Tail,i,m - m_i}]
Sourcing(Equation feedstocks7)
Where:
Tail issuances will only be issued to the Project while the Project is registered with Isometric.
The quantification of [math: CO_2e_{CFEmissions,i,(0,15)}], [math: CO_2e_{CFStorage,i,50}] and, where dynamic tail issuance is used, [math: CO_2e_{CFEmissions,i,(15,T_n)}] requires modeling based on the counterfactual fate. Across all modeling approaches the following requirements apply:
Project Proponents may apply published default decay rates and emission factors from frameworks without bespoke modeling. Currently acceptable sources are as follows, subject to a demonstration of feedstock and fate equivalence. Other sources may be evaluated on a case-by-case basis:
The following models are capable of producing central to conservative estimates when parameterized in accordance with the general requirements above and are therefore recommended by Isometric.
Table 15 – Recommended Model Frameworks
Model | Developer | Primary Application | Applicable Feedstocks | Notes on Use |
C-BREC | Fingerman et al. (2021); Schatz Energy Research Center and Humboldt State University Department of Environmental Science and Management | Biomass residue counterfactual storage, designed for BiCRS | Forestry residues, agricultural residues, conservation/management residues, some industrial residues | Central to conservative depending on parameter selection. Highly robust model for single-pool modeling for woody and agricultural biomass under scattered or piled decay regimes (not landfill). Climate parameterization allows translation across climates. |
IPCC First Order Decay Model | IPCC | Decomposition for organic waste in landfill. GHG evolution from landfilled organics. | Controlled wastes and manure | Conservative for aerobic decomposition scenarios. Can be very conservative for anaerobic scenarios depending on landfill conditions. |
RothC | Rothamsted Research | Soil organic matter and residue decomposition in agricultural systems. | Agricultural residues, some industrial residues | Central, well-validated in temperate conditions. Very conservative for decay in tropical soils. |
CBM-CFS3 | Canadian Forest Service | Forest residue and dead organic matter decomposition. | Forestry residues, conservation/management residues, some industrial residues | Central to conservative. Well-validated in boreal conditions. Very conservative for warmer/more humid conditions. |
Yasso20 (Yasso07/Yasso15 accepted where required for consistency with a national inventory submission) | Finnish Meteorological Institute | Organic matter decomposition across climate zones. Used in European national inventories. | Forestry residues, conservation/management residues, some industrial residues | Conservative for woody litter. Stable humus fraction is treated as non-decomposable, which can be very conservative depending on feedstock. |
EPA WARM | US EPA | US waste stream counterfactual decomposition, landfill GHG evolution. | Controlled wastes | Central, well-validated for US waste streams. Application outside the US requires validation against waste composition/climate parameters. |
BEAM | NEBRA | US biosolids emission characterization in various scenarios. | Biosolids | Central, well-validated for US biosolids. |
Where the models listed above are inappropriate for the feedstock type or regional context, Project Proponents may propose alternative models with appropriate justification. Proposals must demonstrate that the model is peer-reviewed and validated against field-measured data, and that conservative parameterization is achievable and documented.
When a BiCRS Project sources a feedstock, it can lead to an increase in GHGgreenhouse gas emissions resultingthat fall outside the Project's system boundary by removing a feedstock from changesits toexisting market, or generating new demand which causes adjustments in the supply and demand equilibrium, also called market leakage. ForThe example,indirect the sourcing of a feedstock above the Baseline Feedstock Generation Rate could lead to increased feedstock production (e.g., land use change). This can also occur when removed feedstocks exceed the Sustainable Usage Rate, leading to demand for a replacement product (e.g., fertilizer). Feedstocks that do not meet the criteria establishedincrease in TableGHG 3emissions arecaused deemed ineligible under the current Module due to high risks of significant market leakage. Market leakage must be evaluated in all cases using the criteria within Table 4.
Onceby a Project's effect on feedstock markets is known as "market leakage".
For example, a Project that sources constrained woody residues that would otherwise have been used for bioenergy displaces energy production that will likely be backfilled by a fossil fuel generator. In this context, the Project's removals overstate its net climate impact if these displacement effects are ignored.
Isometric requires an assessment of this emissions impact. Consistent with consequential life-cycle assessment and with partial-equilibrium displacement modeling of biomass markets, the default assumption, identical to counterfactual storage, is that the marginal replacement product – the most economic alternative use of the feedstock, or the material existing users would switch to in its absence – determines the relevant leakage pathway, as this reflects the most probable market response to its removal. Displacement need not be one-for-one: where a Project quantifies leakage under ML1 it must state and justify the displacement factor applied. This assumption is changed if the Project provides sufficient evidence in Section 2.4.1 to demonstrate an alternative fate of the feedstock.
Isometric determines that there are no market leakage emissions associated with certain feedstock sourcing situations. This includes situations where the revenue provided to the supplier for the feedstock is identifiedinsufficient to influence sourcing behavior or divert from productive use, when there is a demonstrable history of disposal of that feedstock or absence of alternative uses, or when a Project is an Eligible Retrofit or Integration Project as eligibledefined in Appendix E.1.
This is independent of the counterfactual storage requirements. A feedstock with zero counterfactual storage – one that would have been combusted immediately in the counterfactual – may still carry market leakage if its combustion would have served a useful energy function. Conversely, a feedstock with significant counterfactual storage, such as woody debris in an arid climate, may have zero market leakage if it maintainshad it'sno eligibilityalternative use.
This section contains two parts. The first part provides requirements for a periodfeedstock to demonstrate zero leakage associated with feedstock sourcing, or the requirement for Projects to quantify the market leakage associated with their feedstock. The second part provides detailed steps for a Project to quantify the market leakage associated with their feedstock sourcing. Projects that must quantify the market leakage associated with sourcing may still qualify for zero market leakage emissions, depending on the outcome of 10the yearsmarket providedleakage assessment.
All feedstock submissions must demonstrate compliance with one of the following market leakage (ML) criteria to determine if Project feedstock sourcing doesbehavior notcan change.be Underassigned exceptional circumstances where Isometric identifies a significant risk of substantialzero market leakage, Isometricemissions reservesor the rightProject is required to conductquantify anmarket auditleakage emissions. ML2 - ML7 each allow a Project to ensuredemonstrate feedstocksthat continuetheir tofeedstock meetsourcing produces no market leakage emissions, depending on the criteriascenario. laidWhere outa Project cannot comply with one of these, the Project Proponent must quantify market leakage emissions in thisline Modulewith ML1. A quantification of market leakage emissions may still result in zero market leakage emissions depending on the Project scenario.
The following informationdecision musttree can be submitted every 10 years:
Figure been2 evaluated– Market Leakage Decision Logic
Table 16 – Market Leakage Criteria
[Image: BFAv1.4Figure2V5]
Criterion
|
| [/R-68S0-1] | [G-X3CC-0, | |
| ] The Project Proponent must provide all of the following:
|
ML2 | ||
ML2.1Validation Requirement | [R-17BZ-1, The Project Proponent's contribution to the revenue of the feedstock supplier is negligible, with no other upstream incentives (e.g., revenue sharing, side payments, or in-kind benefits) provided to the supplier.] The Project Proponent's contribution to the revenue of the feedstock supplier is negligible, with no other upstream incentives (e.g., revenue sharing, side payments, or in-kind benefits) provided to the supplier. Where the feedstock supplier is a related party2 of the Project Proponent, this criterion cannot be used. Where feedstocks have a demonstrable counterfactual economic use, this option is unavailable. [/R-17BZ-1] | [G-GR81-0, The Project Proponent must demonstrate | ] The Project Proponent must provide one of the following:
|
ML3: There is a surplus of feedstock |
ML3.1Validation Requirement | [R-MW7M-1, The feedstock is | The This is demonstrated either because the feedstock | [G-4D3P-0, |
| The Project Proponent must demonstrate that the | ] The Project Proponent must provide one of the following:
|
ML3.2Validation Requirement | [R-QQ1Y-0, The Project Proponent's financial contribution to the feedstock supplier is below the threshold that would reasonably incentivize changes in feedstock production, sourcing or management behavior.] The Project Proponent's financial contribution to the feedstock supplier is below the threshold that would reasonably incentivize changes in feedstock production, sourcing or management behavior. Where the feedstock supplier is a related party2 of the Project Proponent, this criterion cannot be used. [/R-QQ1Y-0] | [G-R1ZB-0, The Project Proponent must demonstrate | ] The Project Proponent must provide one of the following:
|
ML4: The feedstock serves an economic use, but can be extracted/diverted at a |
ML4.1Validation or Verification Requirement | [R-W5YY-1, The feedstock The feedstock must not be extracted/diverted above the Sustainable Usage Rate. [/R-W5YY-1] | [G-BPV0-0, The Project Proponent | ] The Project Proponent must provide
|
ML4.2Validation Requirement | [R-Z0S8-0, The Project Proponent's financial contribution to the feedstock supplier is below the threshold that would reasonably incentivize changes in feedstock production, sourcing or management behavior.] The Project Proponent's financial contribution to the feedstock supplier is below the threshold that would reasonably incentivize changes in feedstock production, sourcing or management behavior. Where the feedstock supplier is a related party2 of the Project Proponent, this criterion cannot be used. [/R-Z0S8-0] | [G-ZBPN-0, The Project Proponent must demonstrate | ] The Project Proponent must provide one of the following:
|
ML5: The feedstock is | |||
ML5.1Validation Requirement | [R-JNMX-0, The feedstock is a Residue from wildfire mitigation activities.] The feedstock is a Residue from wildfire mitigation activities. [/R-JNMX-0] | [G-K0JA-0, The Project Proponent must provide evidence that the feedstock is sourced from Eligible Wildfire Mitigation activities as defined in Appendix E.2.] The Project Proponent must provide evidence that the feedstock is sourced from Eligible Wildfire Mitigation activities as defined in Appendix E.2. [/G-K0JA-0] | |
ML5.2Validation Requirement | [R-6AGJ-0, The feedstock does not have a competing use.] The feedstock does not have a competing use. [/R-6AGJ-0] | [G-6NDZ-0, The Project Proponent must demonstrate that the feedstock would not have otherwise been used for an economic purpose.] The Project Proponent must provide one of the following:
| |
ML6: The Project is an Eligible Retrofit or Integration Project that does not change the rate at which the feedstock is consumed by the underlying facility or the source of the feedstock and does not decrease the outputs of the underlying facility. Feedstocks that demonstrate compliance with ML6.1 and ML6.2 and ML6.3 are considered to have no market leakage emissions, therefore [math: CO_2e_{Leakage}] = 0 for every batch of the feedstock. | |||
ML6.1Validation Requirement | [R-SXMN-1, The Project is an Eligible Retrofit or Integration Project.] The Project is an Eligible Retrofit or Integration Project. [/R-SXMN-1] | [G-1M0Y-0, The Project Proponent must demonstrate compliance with the requirements laid out in Appendix E.1.] The Project Proponent must demonstrate compliance with the requirements laid out in Appendix E.1. [/G-1M0Y-0] | |
ML6.2Validation and Verification Requirement | [R-DJGA-1, The Baseline Feedstock Consumption Rate for the underlying facility is defined and remains unchanged by the Project.] The Baseline Feedstock Consumption Rate for the underlying facility is defined and remains unchanged by the Project. [/R-DJGA-1] | [G-N8WK-0, The Project Proponent must provide a quantification of the Baseline Feedstock Consumption Rate as defined in Appendix D.3 and continue to report this for each Reporting Period to ensure the Project does not affect the rate at which the underlying facility sources feedstock.] The Project Proponent must provide a quantification of the Baseline Feedstock Consumption Rate as defined in Appendix D.3 and continue to report this for each Reporting Period to ensure the Project does not affect the rate at which the underlying facility sources feedstock. [/G-N8WK-0] | |
ML6.3Validation and Verification Requirement | [R-8JTV-0, The rate of production of the outputs of the underlying facility remains unchanged by the Project.] The rate of production of the outputs of the underlying facility remains unchanged by the Project. [/R-8JTV-0] | [G-8XR8-0, The Project Proponent must provide evidence that the Project does not change the production rate/volume of the underlying facility's Primary Products.] The Project Proponent must provide one of the following:
| |
ML7: The feedstock is consumed by the underlying facility regardless of the Project and the Project is an Eligible Retrofit or Integration Project. Feedstocks that demonstrate compliance with ML7.1 and ML7.2 are considered to have no market leakage emissions for the corresponding feedstock, therefore [math: CO_2e_{Leakage}] = 0 for every batch of the feedstock. This criterion set is specifically designed for Projects which Retrofit or Integrate an underlying facility with a heterogeneous feedstock baseline or where feedstock consumption can be reliably attributed to the demand for Primary Product production, where a continuous (pre- and post-Project) feedstock consumption rate cannot reasonably be assessed. | |||
ML7.1Validation Requirement | [R-SZC7-0, The Project is an Eligible Retrofit or Integration Project.] The Project is an Eligible Retrofit or Integration Project. [/R-SZC7-0] | [G-TA9M-0, The Project Proponent must demonstrate compliance with the requirements in Appendix E.1 and provide a justification for why ML6 cannot be complied with.] The Project Proponent must demonstrate compliance with the requirements in Appendix E.1 and provide a justification for why ML6 cannot be complied with. [/G-TA9M-0] | |
ML7.2Validation and Verification Requirement | [R-DM7W-0, The Project must account for any changes to feedstock sourcing, energy generation or changes in the export of Primary Products that are introduced by the Project to the underlying facility.] The Project must account for any changes to feedstock sourcing, energy generation or changes in the export of Primary Products that are introduced by the Project to the underlying facility. Where a Project results in a change to the export of the Primary Products of the underlying facility, the feedstock submission must account for this under ML1 and is ineligible for ML7, unless the facility operates within a binding emissions trading scheme in which increases in marginal power generation are met by a corresponding abatement of emissions, in which case the Project may reference this to remain compliant under this criterion. This includes where a bioenergy Retrofit or Integration reduces the quantity of energy exported to the grid compared to a non-capture baseline. The marginal reduction in export must be the basis for the leakage calculation. Where a Project increases or sustains the demand for feedstock, the marginal feedstock volumes must be conservatively quantified and assessed as a separate feedstock submission without invoking any documentation options afforded to Eligible Retrofit or Integration Projects. This includes cases where the Project draws energy from the underlying facility and, to compensate, the underlying facility sources more biomass. Where a Project introduces a parasitic load to the system that will be compensated by grid import or behind-the-meter, non-biomass-based energy generation, the feedstock is eligible under this criterion subject to robust accounting of the associated emissions in the Project's LCA. [/R-DM7W-0] | [G-DZ59-0, The Project Proponent must demonstrate any impacts the Project has on the underlying facility and account for them where necessary.] The Project Proponent must provide evidence covering each of the effects listed in the Requirement column that is applicable to the Project, selecting from the following. Where an effect is not applicable, the Project Proponent
|
Iffrom the underlying facility or chief engineer confirming that the Project's introduces no parasitic load to the underlying facility, corroborated by a single independent site inspection or engineering sign-off, conducted after commissioning, confirming that no additional load-drawing equipment has been installed as part of the Project.
Where a feedstock submission cannot demonstrate compliance with any of ML2–ML7 (Table 16), the Project Proponent must quantify market leakage mustemissions beunder calculatedML1 using Equation 8.
[math: CO_2e_{Leakage}] is part of the calculation of [math: CO_2e_{Emissions}] as set out by the relevant Protocol. [math: CO_2e_{Leakage}] must be quantified and aggregated across all feedstock batches, [math: x], within that removal, where [math: nN_B] is the total number of batches used in a given Reporting Period.
[math: CO_2e_{Leakage}] attributed to feedstocks for a Reporting Period is quantified with the following equation:
[math: CO_2e_{Leakage,RP}\\=\\\sum_{xi=1}^{nN_B}\CO_2e_{Leakage,i} = \sum_{i=1}^{N_B}x\left( Mass_{Div,i} \cdot \sum_{r} \left( Conv_{r,i} \cdot DF_{r,i} \cdot EF_{r,i} \right) + CO_2e_{Add,i} \right)]
(Equation 58)
Where:
[math: CO_2e_{Leakage,i}] is informed by:
The Project Proponent must undertake an appropriate assessment based on the available information regarding the feedstock. The assessment must consider the market leakage impact of the feedstock useused for the Project, including all relevant emissions.
If the Project Proponent contributes more than 510% of revenue to the feedstock supplier, the Project Proponent must assess their upstream attributional emissions (Seesee Section 6.4 of the Isometric GHG Accounting Module for guidance). These emissions are reported in the Project LCA and are not part of [math: CO_2e_{Leakage,i}].
To quantify the impact of market leakage, Projects must identify the alternativecounterfactual use of the feedstock in line with CF1 ( Section 2.4.1), and the marginal impact associated with the diversion of feedstock from this alternativecounterfactual use. ThisThe willsteps typicallybelow involvecorrespond identifyingto the unconstrained marginal product and applying a conversion rate to understand the quantityterms of theEquation replacement product required8.
Examples of the calculation of [math: CO_2e_{Leakage,i}] for different cases are set out below.
A Project Proponent may source woodwoody productsbiomass that werewas otherwise used for bioenergy production. Therefore, byBy sourcing the wood for the Project, the wood has been diverted from its alternative use for energy production. If wood suitable for bioenergy is a constrained resource, diverting wood from bioenergy plants may lead to an increased use of fossil power sources. The market leakage emissions are the emissions associated with the generation of energy based on the remaining grid mix8. The Project calculates the quantity of forgone energy production associated with the feedstock used for the Project. The forgone energy production (kWh) is multiplied by the average emissions intensity of the grid in the region.
A Project Proponent may source manure that is partially over the Sustainable Usage Rate. The Project causes some displacement to the manure that would have been used for nutrient replenishment. Manure is a constrained resource (as a residue from the dairy or livestock industry), so it is generally assumed that the replacement material is synthetic fertilizer. The Project Proponent must calculate the quantity of manure over the Sustainable Usage Rate, apply a conversion factor for the requisite fertilizer required to fulfill the same function as the manure, and source an emission factor for fertilizer use (see Appendix 4 for more details). The market leakage emissions are the quantity of fertilizer required multiplied by the emission factor for the fertilizer production.
A Project Proponent may source feedstock that otherwise would have been used for animal bedding. The biomass product is constrained as it is a residueResidue from an industrial process, and the unconstrained marginal product is identified as hay. The Project Proponent quantifies the amount of feedstock that would have been used for animal bedding and applies a conversion factor (Convr,i) to identify the quantity of hay that must be sourced as athe replacement materialproduct, and a displacement factor (DFr,i). The market leakage emissions are the quantity of hay requiredbackfilled multiplied by the emission factor for hay (EFr,i), plus any additional transport (CO2eAdd,i).
This section applies to any feedstock cultivated specifically for CDR, or for which CDR revenue is a sufficient financial driver that stimulates, increases or maintains feedstock cultivation. Feedstocks that are residues of existing processes are assessed under the residue accounting framework in Section 2, and feedstocks harvested from an existing stock not cultivated by the Project, such as invasive species or wildfire mitigation activities that are performed by or specifically stimulated by the Project, are assessed under the standing stock accounting framework in Section 4.
In contrast to residues that already exist in the economy and would have a counterfactual fate in the absence of the Project, Purpose-Grown Feedstocks would not be produced absent the economic incentive created by CDR demand.
The primary purpose of this section is to provide a framework for Projects seeking to use abandoned, non-productive and contaminated land, or intermediate crops on existing agricultural land, for cultivating biomass for use in CDR Projects. While residues typically represent the opportunity for the highest atmospheric benefit margin, this section allows the coupling of BiCRS with co-benefits such as local employment, environmental remediation, waste treatment etc.
All Projects using Purpose-Grown Feedstocks must account for all emissions associated with feedstock production, including operational, establishment and embodied emissions. These are assessed at the Protocol level, in the Sources, Sinks and Reservoirs (SSRs) table.
The following sections contain:
Feedstocks assessed under this section must demonstrate compliance with the Feedstock Characterization and Storage requirements in Sections 1.5 and 1.6. Where a Project sources a mix of Purpose-Grown, Standing Stock and Residue Feedstocks, each category must be assessed individually under its respective section with results aggregated at the Project level.
Ensuring feedstocks that are cultivated specifically for CDR are sourced sustainably is essential for minimizing the risk associated with production impacts on essential environmental and economic functions. As Purpose-Grown Feedstocks represent an elevated risk of land-use change emissions, degradation of ecosystems as well as threats to food and other resource availability, this Module purposefully imposes much stricter criteria compared to the Residue Feedstock accounting criteria. This includes restricting the production of Purpose-Grown Feedstocks to specific areas, ensuring biosecurity and preventing unacceptable impacts to ecosystems and communities.
All Purpose-Grown Feedstock submissions must comply with all the criteria in PSC1.
The feedstock is cultivated for CDR (such as short-rotation wood, energy grass, algae etc.). Feedstock submissions must demonstrate compliance with all of the requirements under PSC1.
Table 17 – Purpose-Grown Sustainability Criteria
Criterion ID and Type | Requirement | Documentation Requirements |
PSC1.1Validation Requirement | [R-W7PG-0, The feedstock must not originate from land that held a high-value status in or after January 2008.] The feedstock must not originate from land that held any of the following statuses in or after January 2008, whether or not the land continues to hold that status:
| [G-WJKX-0, The Project Proponent must demonstrate that the feedstock does not originate from a converted high-value landscape.] The Project Proponent must provide one of the following:
|
PSC1.2Validation Requirement | [R-FWJ5-0, The feedstock must not originate from converted high-value land.] The feedstock must not originate from land that held any of the following statuses in January 2008, and no longer holds that status:
| [G-G7FJ-0, The Project Proponent must demonstrate that the feedstock does not originate from a converted high-value landscape.] The Project Proponent must provide one of the following:
|
PSC1.3Validation Requirement | [R-3HDT-0, The feedstock production must not contribute to water scarcity.] The feedstock production must not contribute to water scarcity. [/R-3HDT-0] | [G-3WB7-0, The Project Proponent must demonstrate that the feedstock cultivation does not contribute to water scarcity.] The Project Proponent must provide one of the following:
|
PSC1.4Validation Requirement | [R-Q69F-0, The feedstock production must not contribute to the erosion of high erosion-risk areas.] The feedstock production must not contribute to the erosion of high erosion-risk areas. [/R-Q69F-0] | [G-QH6W-0, The Project Proponent must demonstrate that the production of the feedstock does not contribute to the erosion of high erosion-risk areas.] The Project Proponent must provide one of the following:
|
PSC1.5Validation Requirement | [R-AV54-0, The feedstock production must not result in a net warming effect due to albedo.] The feedstock production must not result in a net warming effect due to albedo. This test is made at the Project level against the counterfactual land cover, at the steady state of the production system. [/R-AV54-0] | [G-B62H-0, The Project Proponent must demonstrate that the production of the feedstock does not result in a net warming effect due to albedo.] The Project Proponent must provide one of the following:
|
PSC1.6Verification Requirement | [R-YG0S-0, Demand for feedstock production on prime agricultural land[^7] as a main crop, excluding intermediate crops, such as catch crops and cover crops, must be 7% or less of the feedstock intake by LHV.] Demand for feedstock production on prime agricultural land7 as a main crop, excluding intermediate crops, such as catch crops and cover crops, must be 7% or less of the feedstock intake by LHV. [/R-YG0S-0] | [G-YTY6-0, The Project Proponent must demonstrate that the feedstock production does not significantly displace the production of crops on prime agricultural land.] The Project Proponent must provide one of the following:
|
PSC1.7Validation Requirement | [R-J4WE-0, The feedstock production must not increase the risk of undesired proliferation.] The feedstock production must not increase the risk of undesired proliferation. [/R-J4WE-0] | [G-JFSV-0, The Project Proponent must demonstrate that the feedstock production does not introduce a risk of undesired proliferation.] The Project Proponent must provide one of the following:
|
PSC1.8Validation and Verification Requirement | [R-5SR3-0, The Project Proponent must ensure the feedstock production does not compromise the local environment.] The Project Proponent must ensure the feedstock production does not compromise the local environment. [/R-5SR3-0] | [G-64NG-0, The Project Proponent must provide evidence demonstrating compliance with the requirements in Appendix E.3.] The Project Proponent must provide evidence demonstrating compliance with the requirements in Appendix E.3. [/G-64NG-0] |
This section establishes the requirements for quantifying the carbon stock impact of introducing Purpose-Grown CDR biomass production into the Sourcing Region.
This section covers two components which must be assessed for all Purpose-Grown Feedstocks:
Indirect land-use change (ILUC), the market-mediated displacement of production, is addressed separately as Purpose-Grown Market Leakage in Section 3.5.
The Project Proponent must establish the counterfactual land use for each feedstock, known as a Land Use Declaration. Where feedstocks are produced from distinct land with different historical land use, feedstocks must be submitted to Isometric as separate feedstock submissions. The Land Use Declaration must demonstrate the land use and carbon stock trajectory that the parcel would have followed in the absence of the Project.
The default Land Use Declaration is an assumption of current use persistence, informed by current and historical land use, assuming that the land use and carbon stock would have remained unchanged from its current state immediately prior to the Project intervention. Where the land is abandoned or otherwise regenerating naturally (for example, land qualifying under PILUC4), the counterfactual carbon stock must include the expected natural regeneration over the near-term horizon rather than the stock immediately prior to the Project intervention.
The Land Use Declaration is valid for the Crediting Period. All Purpose-Grown Feedstocks must comply with the following requirement.
Table 18 – Purpose-Grown Land Use Declaration Criteria
Criterion ID and Type | Requirement | Documentation Requirements |
PLUD1: All Purpose-Grown Feedstock submissions must demonstrate what would have happened to the land used for feedstock production in the absence of the Project. | ||
PLUD1.1Validation Requirement | [R-SEKR-0, The counterfactual land use and carbon stock trajectory of the land in the absence of the Project is documented.] The counterfactual land use and carbon stock trajectory of the land in the absence of the Project is documented. The default trajectory is persistence of the current/historical land use, as set out in Section 3.3.1. The Project Proponent may instead declare a different counterfactual land use only where a change of land use was already legally committed and funded independently of CDR revenue. A change that is merely intended, expected or market-driven does not qualify. [/R-SEKR-0] | [G-SSH5-0, The Project Proponent must demonstrate what the land would have been used for in the absence of the Project.] The Project Proponent must provide one of the following:
|
Direct Land-Use Change (dLUC) is the change in carbon stock caused by the Project's land conversion measured against the baseline established under the Land Use Declaration in Section 3.3.1.
All feedstocks must demonstrate compliance with one of the following criteria. PDLUC2 allows Project Proponents to demonstrate their feedstock production does not produce emissions from Direct Land-Use Change. PDLUC1 requires the Project Proponent to quantify the emissions associated with Direct Land-Use Change. A quantification of Direct Land-Use Change may result in 0 dLUC emissions depending on the Project, the conversion and the counterfactual land use. These criteria apply to Purpose-Grown Feedstocks, to ensure any decreases in landscape carbon stocks and flows are captured and accounted for.
Table 19 – Purpose-Grown Direct Land-Use Change Criteria
Criterion ID and Type | Requirement | Documentation Requirements |
PDLUC1: The production of the feedstock requires/results in the conversion of land. [math: CO_2e_{dLUC}] is quantified. | ||
PDLUC1.1Validation and Verification Requirement | [R-D3FD-0, Where feedstock is produced from land that has undergone a land-cover conversion, the Project Proponent must quantify dLUC as the difference between the counterfactual and Project carbon stocks, including above- and belowground biomass and soil organic carbon pools, consistent with the Land Use Declaration.] Where feedstock is produced from land that has undergone a land-cover conversion, the Project Proponent must quantify dLUC as the difference between the counterfactual and Project carbon stocks, including above- and belowground biomass and soil organic carbon pools, consistent with the Land Use Declaration. All sustained (>15 year) carbon stock losses must be subtracted from Project removals. Where default values are used, [math: CarbonStock_{CF}] must be taken at the upper bound and [math: CarbonStock_{Proj}] at the lower bound of the published uncertainty range for the applicable land-use category, ecological zone and climate domain. [/R-D3FD-0] | [G-DECT-0, The Project Proponent must demonstrate that any change in landscape carbon stocks has been accurately quantified and accounted for.] The Project Proponent must provide one of the following:
|
PDLUC2: The production of the feedstock does not result in a change in land use or land cover and does not result in a decrease in landscape carbon stocks. Feedstock submissions that demonstrate compliance with the criteria do not result in Direct Land-Use Change, therefore [math: CO_2e_{dLUC}] = 0. | ||
PDLUC2.1Validation Requirement | [R-0RB2-0, The feedstock production is consistent with the existing land-use.] The feedstock production is consistent with the existing land-use. If the feedstock is an intermediate crop, the feedstock may be eligible under this criterion depending on evidence demonstrating that the introduction of this intermediate crop does not introduce a requirement for a change in agricultural practices that would result in decreases in soil carbon stocks (such as increasing/changing the need/extent of tillage, residue removal etc.). [/R-0RB2-0] | [G-138F-0, The Project Proponent must demonstrate that the land use before and after the Project is demonstrably consistent and no change in landscape carbon stocks occurs.] The Project Proponent must provide one of the following:
|
Where a feedstock complies with PDLUC1, the following equation must be used to quantify dLUC:
[math: CO_2e_{dLUC} = max\left( 0, CarbonStock_{CF} - CarbonStock_{Proj} \right)\ \cdot \ Area\ \cdot \ \dfrac{44}{12}]
(Equation 9)
Where:
Details for minimum measurement requirements for direct measurement can be found in Appendix F, Section F.1.
Changes in carbon stocks can take years to reach a new equilibrium. Where post-conversion changes are measured, measurement must take place when the land is deemed to have reached steady state in agreement with Isometric and the VVB. In these instances, a conservative deduction must be made from an informed model upfront to ensure conservatism.
dLUC under PDLUC1 is quantified as CO2e and is subtracted in full from gross removals as a Project establishment emission following the rules presented in the Isometric GHG Accounting Module on establishment emissions.
All emissions associated with the cultivation of Purpose-Grown Feedstock must be accounted for in the Project's LCA. This includes, but is not limited to, operational emissions such as fuel and energy use in cultivation, irrigation and harvesting, establishment emissions such as site preparation and planting, and embodied emissions such as fertilizer and agrochemical production, consistent with the requirements set out in the GHG Accounting Module.
Indirect land-use change (ILUC) is the form that market leakage takes for Purpose-Grown Feedstocks. It is the market-mediated effect of displacing productivity by either drawing productive land into a new use, or introducing a Purpose-Grown Feedstock into a system as an intermediate crop that adversely affects productivity of the primary crop(s). When a Project displaces production of an agricultural commodity, other suppliers may produce more to meet existing demands, and part of that new supply comes from bringing new land into cultivation elsewhere; converting that land releases carbon from biomass and soil. Unlike direct land-use change, ILUC cannot be observed on the Project site, so it must be estimated with an economic model or estimates from literature rather than measured.
All Purpose-Grown Feedstocks must demonstrate compliance with one of the following criteria. PILUC2-PILUC4 are routes for demonstrating zero ILUC emissions. Where none of these apply to the feedstock, the Project Proponent must quantify ILUC emissions under PILUC1. The quantification of ILUC may still result in zero ILUC emissions depending on the displacement of productivity.
Table 20 – Purpose-Grown Indirect Land-Use Change Criteria
Criterion ID and Type | Requirement | Documentation Requirements |
PILUC1: The production of the feedstock results in the displacement of productivity. [math: CO_2e_{Leakage}] is quantified. | ||
PILUC1.1Validation and Verification Requirement | [R-MD6Q-0, The Project Proponent must calculate any indirect land-use change emissions associated with the production of the feedstock.] The Project Proponent must calculate any indirect land-use change emissions associated with the production of the feedstock. [/R-MD6Q-0] | [G-MR44-0, The Project Proponent must demonstrate that indirect land-use change induced by the Project has been accurately quantified and accounted for.] The Project Proponent must provide all of the following:
|
PILUC2: The land used for feedstock production is unsuitable for the production of agricultural or forestry products at commercial scale, including reclaimed non-agricultural land. Feedstocks that demonstrate compliance with this criterion are considered to have no ILUC emissions, therefore [math: CO_2e_{Leakage}] = 0. Abandoned agricultural land that is technically suitable for agriculture is not eligible under PILUC2 and must instead comply with PILUC4. | ||
PILUC2.1Validation Requirement | [R-822C-0, The feedstock is produced in a built environment, on water or aquatic substrate, on land unsuitable for agricultural or forestry production, or on reclaimed land, as set out below.] The feedstock is produced on one of the following:
Abandoned agricultural land that is technically suitable for agriculture is not eligible under PILUC2, irrespective of how long it has been out of production. Such land must instead comply with PILUC4. [/R-822C-0] | [G-8CZS-0, The Project Proponent must demonstrate that the land used to produce the feedstock is unsuitable for agricultural or forestry production.] The Project Proponent must provide one of the following:
|
PILUC3: The feedstock is an intermediate crop grown on agricultural land with no competing crop. Feedstocks that demonstrate compliance with PILUC3.1 and PILUC3.2 are considered to have no ILUC emissions, therefore [math: CO_2e_{Leakage}] = 0. | ||
PILUC3.1Validation Requirement | [R-30NB-0, The feedstock occupies a window in the agricultural calendar in which no commercial crop was produced on the production unit during the previous five years.] The feedstock occupies a window in the agricultural calendar in which no commercial crop was produced on the production unit during the previous five years. [/R-30NB-0] | [G-3BJR-0, The Project Proponent must demonstrate that the feedstock production occupies an otherwise unproductive/fallow cropping window.] The Project Proponent must provide one of the following:
|
PILUC3.2Validation or Verification Requirement | [R-PNH0-0, The yields of the primary cash crop(s) remain at or above the pre-implementation baseline. Feedstocks grown as intermediate crops that result in yield reductions may still be eligible but must account for ILUC emissions through PILUC1. Where yield reductions are compensated for by inputs such as increased fertilizer use, the Project must account for such inputs under the Project LCA.] The yields of the primary cash crop(s) remain at or above the pre-implementation baseline. Feedstocks grown as intermediate crops that result in yield reductions may still be eligible but must account for ILUC emissions through PILUC1. Where yield reductions are compensated for by inputs such as increased fertilizer use, the Project must account for such inputs under the Project LCA. [/R-PNH0-0] | [G-Q0ED-0, The Project Proponent must demonstrate that the feedstock production does not reduce the yield of the primary crop(s).] The Project Proponent must provide one of the following:
Where the above cannot be evidenced, the Project must comply with PILUC1. A conservative yield-based adjustment may be introduced in consultation with Isometric. Further information can be found in Section 3.5.2.2. [/G-Q0ED-0] |
PILUC4: The land used for feedstock production is abandoned agricultural land. Feedstocks that demonstrate compliance with PILUC4.1 and PILUC4.2 are considered to have no ILUC emissions, therefore [math: CO_2e_{Leakage}] = 0. | ||
PILUC4.1Validation Requirement | [R-AACN-0, The feedstock is cultivated on land that transitioned out of an agricultural use at least five years prior to the Project start date.] The feedstock is cultivated on land that transitioned out of an agricultural use at least five years prior to the Project start date. [/R-AACN-0] | [G-ANA2-0, The Project Proponent must demonstrate that the land has not been used for agriculture recently.] The Project Proponent must provide one of the following:
|
PILUC4.2Validation Requirement | [R-XZ8A-0, The land is not enrolled in, and has not been enrolled within the preceding five years in, a set-aside, conservation reserve, fallow, or agri-environment payment scheme.] The land is not enrolled in, and has not been enrolled within the preceding five years in, a set-aside, conservation reserve, fallow, or agri-environment payment scheme. [/R-XZ8A-0] | [G-YA5Q-0, The Project Proponent must demonstrate that the land is not purposefully set aside or otherwise purposefully excluded from agricultural production for an environmental/economic benefit.] The Project Proponent must provide all of the following:
|
The remainder of this section sets out how indirect land-use change (ILUC) emissions are quantified. It applies to Purpose-Grown Feedstocks that meet criterion PILUC1 (Table 20). Feedstocks meeting any other ILUC criterion (PILUC2-PILUC4) have no ILUC emissions to quantify. Standing Stock Feedstocks are not assessed for ILUC: SSC1.4 and SSC2.6 (Section 4.2) prohibit any Standing Stock Feedstock whose removal diverts it from, or displaces, a productive use, so there is no displaced productivity to quantify. References in this section to the Land Use Declaration are to the declaration made under Section 3.3.1.
ILUC must be quantified through one of two core methods as described in this section. The default approach must be the application of ILUC factors based on the CORSIA framework corresponding to the amount of displaced productivity associated with the production of a Purpose-Grown Feedstock. This approach is detailed in Section 3.5.4. In instances where the displaced commodity is not modeled by CORSIA and the displaced commodity is not a substitute for a CORSIA-modeled feedstock, ILUC estimation must be based on an Increased Supply, New Land ([math: IS]-[math: NL]) approach (Section 3.5.5). Method selection for each displaced commodity is set out in Section 3.5.3.
ILUC emissions are quantified in three steps. First, the net forgone counterfactual production that the feedstock displaces is determined (Section 3.5.2). Second, each displaced commodity and the quantification method that applies to it are identified (Section 3.5.3). Third, the emissions for each commodity are calculated using the CORSIA-based approach (Section 3.5.4) or the IS-NL approach (Section 3.5.5), and summed using Equation 10 to give [math: CO_2e_{Leakage}].
[math: CO_2e_{Leakage} = \sum_{c \in C_{CORSIA}} \left( PPP_c \cdot EF_{ILUC,c} \right) + \sum_{c \in C_{IS-NL}} CO_2e_{Leakage,c}]
(Equation 10)
Where:
[math: CO_2e_{Leakage}] is summed across feedstocks and is deducted from the Project's net removals per the Protocol's net removals calculation.
This step establishes how much counterfactual commodity production the feedstock actually displaces. Projects must determine, for each commodity [math: c] in the Land Use Declaration, the Pre-Project Productivity ([math: PPP_c]): the annual output of commodity [math: c] that the feedstock land produced, or would have produced under the assumption of current-use persistence, absent the Project, expressed in bone-dry tonnes per year.
Where the Purpose-Grown Feedstock replaces the prior land cover and its commodity output, the displaced production is the full pre-project output of the prior commodity, and the displacement is a one-time, persistent change.
[math: PPP_c] is a one-time determination. It is set from the field's documented output over the preceding five years (or a regionally indexed default where site data are unavailable) and is not re-assessed over the Crediting Period. Because the prior commodity ceases entirely, there is no ongoing productivity interaction to monitor and no true-up.
[math: PPP_c] = the greater of:
Projects must provide the following, in addition to the Land Use Declaration (Section 3.3.1):
Where [math: PPP_c] cannot be evidenced, Projects must use the higher of the regional-average productivity for the commodity and land type, or any demonstrated Pre-Project Productivity of the commodity.
Where the feedstock is grown as a new intermediate crop alongside a retained primary commodity, displacement does not come from removing the primary crop. It arises only from any decline in the primary commodity's yield due to competition for nutrients, moisture, or a shortened planting window for the primary crop. This impact cannot be fully determined ex ante; it must be monitored against realized yields and trued up each Reporting Period.
[math: PSP_{c,f,RP} = {\underline{Y}}_{Regional, c} \cdot \dfrac{Y_{f,c,s}}{Y_{Regional,c,s}}]
(Equation 11)
Where:
Productivity shortfall:
[math: \Delta P_{c,f,RP} = max\left( PPP_{c,f} - PSP_{c,f,RP}, 0 \right)]
(Equation 12)
Where:
No ILUC is assessed where [math: \Delta P_{c,f,RP}\ = \ 0] as the primary crop's yield is unaffected.
De minimis threshold: the shortfall is expressed as a share of expected production, [math: EP]:
[math: SR_{c, RP} = \dfrac{\Delta P_{c,RP}}{EP_{c,RP}}]
(Equation 13)
Where:
Where the shortfall for a commodity is ≤ 3% of its expected production, it is immaterial and no ILUC is assessed for that commodity in that Reporting Period. The 3% threshold is a materiality gate, not a deductible: where the shortfall exceeds 3%, ILUC is assessed on the full shortfall, not only the portion above 3%.
Because the yield interaction is realized over time, [math: PSP] and the resulting shortfall are assessed independently each Reporting Period against the original pre-project baseline, and, where the shortfall exceeds the 3% threshold, the realized shortfall for that period, [math: \Delta P_{c,RP}] (bone-dry tonnes per year, as defined in Equation 13), is the displaced quantity for commodity [math: c]. It is used in place of [math: PPP_c] in Equation 10, or as the [math: PPP_c] input to Equation 15 where the [math: IS]-[math: NL] approach applies. A field that exits the Project is subject to a final true-up in the Reporting Period of exit.
Where the productivity evidence required by PILUC3.2 cannot be provided, the Project must comply with PILUC1. A conservative yield-based adjustment can be introduced in consultation with Isometric. Yield data collected before and after Project intervention can be used to demonstrate the yield effect (or lack thereof), assessed as the pre-project yield average, regionally indexed as in Equation 11. Variation in regional production of the same crop may be used to demonstrate Project-independent variation in yield data (see [math: Y_{Regional,c,s}] in Equation 11). If no statistical impact on yield is determined after three years, Isometric will refund the conservative adjustment, proportional to the yield data. If a yield reduction of 15% or more is detected, the feedstock is not eligible for further issuance and must be removed from production.
This limit is separate from the 3% materiality gate above, which only determines whether a shortfall is deducted. In addition to all cultivation emissions directly attributable to the cultivation of the feedstock, the Project Proponent must track any increase in farming inputs or activity made to maintain primary crop yield and include all associated emissions as Project emissions.
Projects must identify each displaced commodity [math: c] and select the quantification method for it as follows.
CORSIA models a finite set of agricultural feedstocks. Where a displaced commodity [math: c] is not covered by CORSIA, one of the following cases applies according to the nature of the displaced commodity.
The Appendix H factor is derived from CORSIA induced land-use-change values, which already encompass the direct land conversion of the marginal replacement production. Projects must not separately account for the replacement production's direct land-use change. Direct land-use-change emissions from converting the Project's own feedstock parcel are a distinct effect on distinct land and are accounted for separately through dLUC. They are additive to, not a substitute for, [math: CO_2e_{Leakage}].
This approach adopts the indirect land-use-change values published under ICAO's Carbon Offsetting and Reduction Scheme for International Aviation (CORSIA) as the source for ILUC factors. CORSIA developed default ILUC values for a defined set of feedstock-to-fuel pathways through a multi-year, internationally reviewed expert modeling exercise. Each value expresses the net global land-use-change emissions induced by a marginal expansion of that feedstock for fuel, in grams of CO2e per megajoule of fuel, amortized over 25 years and net of co-product credits.
This approach provides the CORSIA term of Equation 10 for each displaced commodity [math: c \in C_{CORSIA}]: [math: PPP_c] (Section 3.5.2; in oil-equivalent tonnes for oilseeds, Appendix H.3) multiplied by [math: EF_{ILUC,c}] from Appendix H.
The CORSIA values are the average of two structurally independent economic models:
The two models differ in scope (whole-economy vs land-sector), method (price-equilibrium vs spatially explicit land allocation), timeframe (static vs dynamic) and underlying data, so they provide unique perspectives on land-use responses rather than agreeing exactly. Rather than choosing between them, CORSIA runs each model over the same pathways and takes the arithmetic mean of the two central estimates as the default ILUC value for each pathway in instances where the ILUC emission results between the two models differ by 8.9 gCO2e/MJ or less. When the difference is greater than 8.9 gCO2e/MJ, the lower of the two values plus 4.45 gCO2e/MJ is used. This Module adopts the published values as its starting point without re-running the underlying models.
Two key adjustments are needed to translate the fuels-based CORSIA results to be fit for purpose for this Module.
First, the scenarios run in GTAP-BIO and GLOBIOM are implemented as fuel demand "shocks" where the quantity of feedstock needed is corn grain for ethanol-to-jet, soybean oil for HEFA, etc. These feedstocks produce valuable co-products that are used for animal feed (e.g., dried distillers grains with solubles (DDGS) and soybean meal). In these models the co-production of these feed sources alters and mitigates the impacts of demanding more of the overall feedstock as they complement and displace other baseline feed sources. For Purpose-Grown Feedstocks under this Module, the comparable scenario would consider displacement of the whole crop. The most appropriate scenario design in this Module would be a feedstock shock, not a fuel shock. To adapt, a co-product gross-up (Appendix H.2) of between 1.08× and 2.98×, depending on the commodity, is applied to adjust for the effective co-product realized within the consequential modeling frameworks on an economic-allocation basis.
Second, CORSIA results are reported per unit of fuel energy on a 25-year amortization. The choice of an amortization period is a policy choice, and in the CORSIA case it was a stated compromise between the typical use of 20 years in European contexts and 30 years in U.S. policy settings. Conceptually, the choice of a time frame can reflect policy target considerations for which one would want to assess all climate impacts before (e.g., 50% sector-wide GHG reductions by 2050), and also expected production periods; that is the time over which it is assumed the initially converted land will continue in production for the purpose analyzed (e.g., for biofuel feedstock).
Considering those factors for our purpose, a 15-year amortization is an appropriate basis. This corresponds to the near-term climate-impact horizon defined in Section 2.4.3. Where the Crediting Period specified in the relevant Protocol is shorter than 15 years, the undeducted remainder of [math: CO_2e_{Leakage}] must be taken in full during the Crediting Period; where it is longer, the deduction continues at the Appendix H rate until the full quantity has been taken and no further ILUC is charged thereafter. The amortization period applied must be reported at Validation under PILUC1. Appendix H restates the CORSIA values per dry tonne of total feedstock on a 15-year basis for ease of application, which corresponds to a 66.7% increase in values relative to the native CORSIA values.
Where a displaced commodity is not a CORSIA-modeled feedstock or an appropriate analog as outlined in Appendix I, ILUC must be estimated using the Increased Supply, New Land ([math: IS]-[math: NL]) approach set out below to determine the amount of new land brought into production, [math: ha_{LC}].
This estimate must be informed by:
The new land brought into production must be calculated separately for each commodity type being displaced as a result of the Project.
Emissions from land conversion are quantified using the following equation:
[math: CO_2e_{Leakage,c} = ha_{LC, c} \cdot \ EF_{CarbonStock}]
(Equation 14)
Where:
Estimating Indirect Land Conversion,[math: ha_{LC}].
[math: ha_{LC,c} = \dfrac{PPP_c \times IS_c \times NL_c}{Y_{NL,c}}]
(Equation 15)
Where:
Estimating Increased Supply,[math: IS].
Increased Supply is the proportion of forgone productivity that will be replaced by increased supply elsewhere, underpinned by the premise that forgone production will not necessarily be replaced in totality as a result of elasticities of supply and demand. Global markets for commodities have been assumed for the purposes of the leakage assessment.
[math: IS_c = \dfrac{\varepsilon_{s,c}}{\varepsilon_{s,c} + \left| \varepsilon_{d,c} \right|}]
(Equation 16)
Where:
Isometric has carried out a literature review of [math: \varepsilon_s] and [math: \varepsilon_d] values for certain regions; default values and the procedure for sourcing values in other regions are set out in Appendix J.
Estimating[math: NL].
[math: NL] considers the proportion of increased supply that will result in new land brought into production, underpinned by the premise that not all increased supply results in new land; some is met by intensification and higher yields on existing land. Default [math: NL] values for certain regions are in Appendix J; the procedure for sourcing values is set out there.
Estimating Yield on New Land,[math: Y_{NL}].
[math: Y_{NL}] considers the yield on new land brought into production for commodity [math: c], following the regional and national approach set out in the assessment of yield, [math: Y_c] (Isometric's Reforestation Protocol Section 8.3.2.1.2).
Determining the Carbon Stock Emission Factor,[math: EF_{CarbonStock}].
[math: EF_{CarbonStock}] must be derived from the IPCC average national aboveground biomass content of forests. Mean carbon stocks should be derived from aboveground biomass estimates in Table 3A.1.4 of the IPCC Good Practice Guidance for Land Use, Land-Use Change and Forestry, using the same CO2:C ratio and carbon fraction (CF) as set out in the Isometric Reforestation Protocol Section 9.3.1, with belowground biomass estimated per Isometric Reforestation Protocol Section 9.3.3.
Table 21 – ILUC Quantification Requirements Summary
Item | Requirement | Documentation Requirements |
PILUC1.q1 | Projects must quantify [math: CO_2e_{Leakage}] for all feedstocks meeting PILUC1. | The Project Proponent must provide the completed calculation, inputs, and the pinned Appendix H version. |
PILUC1.q2 | Projects must state the Pre-Project Productivity ([math: PPP]) for each displaced commodity. | The Project Proponent must provide all [math: PPP] source data (for Case A, the greater of five-year field history and the regional average) and, for intermediate crops, [math: PSP]/yield monitoring records and the shortfall used. |
PILUC1.q3 | For each commodity in [math: C_{CORSIA}], Projects must select each ILUC factor from Appendix H on the whole-crop, 15-year basis. | The Project Proponent must provide the commodity identification, factor(s) applied, and basis used. |
PILUC1.q4 | For each commodity in [math: C_{IS-NL}], Projects must quantify [math: CO_2e_{Leakage,c}] using Equations 14–16. | The Project Proponent must provide the [math: PPP_c], elasticity, [math: IS_c], [math: NL_c], [math: Y_{NL,c}] and [math: EF_{CarbonStock}] values used, with sources (Appendix J defaults or the Appendix J procedure). |
This section applies to biomass that is removed by or for the Project from an existing stock that was not cultivated or established by the Project, and for which CDR revenue is a sufficient financial driver that stimulates, increases or maintains the removal. Feedstocks cultivated for CDR are assessed under the Purpose-Grown Feedstock accounting framework in Section 3, and feedstocks that are residues of existing processes are assessed under the residue accounting framework in Section 2.
A standing stock is a biomass pool such as a plantation, scrubland, grassland or wetland. Unlike residues, the removal itself would not occur in the absence of CDR demand, and unlike Purpose-Grown Feedstocks, the Project does not establish the biomass. The removal therefore temporarily reduces the carbon stock held in the standing pool, and the Project Proponent must account for that change in stock and demonstrate the post-harvest regeneration meets or exceeds the pre-intervention carbon stock, including any forgone productivity (e.g., the removal of non-mature biomass that would continue to sequester carbon in the counterfactual). This section covers two removal pathways:
Biomass whose removal was already scheduled or legally committed and funded independently of CDR revenue (a pre-committed removal), for example under a routine conservation or land management program, is a Residue and is assessed under SC7 (Conservation and Management Residues) in Section 2.3.7, regardless of whether a Project intervenes to take over the harvest activity, as the relevant considerations for the feedstock are counterfactual storage and market leakage, as opposed to direct land-use change.
The purpose of this section is to provide a framework for Projects that wish to leverage carbon finance to engage in environmental restoration or wildfire mitigation activities while generating a feedstock for CDR. While residues typically represent the opportunity for the highest atmospheric benefit margin, this section allows the coupling of BiCRS with other co-benefits such as habitat restoration and local employment, while ensuring appropriate accounting for any losses to landscape carbon stocks, ensuring a net atmospheric benefit.
All Projects using Standing Stock Feedstocks must account for all emissions associated with feedstock removal, including operational and embodied emissions, and for the change in carbon stock caused by the removal. Isometric requires that the landscape carbon stock is regenerated within the near term. This effectively prohibits Projects that harvest long-rotation wood, or otherwise contribute to the long-term collapse of landscape carbon stocks. Feedstocks assessed under SDLUC1 must also demonstrate that the carbon stock removed is modeled to regenerate to at least 85% within 15 years and 100% within 30 years (the recovery thresholds, Section 4.3.2.1), and feedstocks assessed under SDLUC2 must meet the two-pool eligibility test in Section 4.3.2.2. Any shortfall of recovery modeled at year 15 (e.g., the carbon stock would only regenerate to 96% of pre-intervention levels by year 15) will take a discount within the Reporting Period in which the feedstock is used (the 4% shortfall at year 15), which may be refundable subject to a demonstrable recovery to the same or higher carbon stock levels within the 15-year window, including any forgone ecosystem sequestration resulting from the harvest event.
The following sections contain:
Standing Stock Feedstocks are not assessed for indirect land-use change. Instead, every Standing Stock Feedstock must demonstrate that it is not diverted from a productive use (SSC1.4 for woody feedstocks, SSC2.6 for non-woody feedstocks). Because a Standing Stock Feedstock cannot displace existing productivity, there is no displaced production to quantify and no ILUC emission to deduct.
Feedstocks assessed under this section must demonstrate compliance with the Feedstock Characterization and Storage requirements in Sections 1.5 and 1.6. Where a Project sources a mix of Purpose-Grown, Standing Stock and Residue Feedstocks, each category must be assessed under its respective section with results aggregated at the Project level.
Ensuring that feedstocks removed from standing stocks are sourced sustainably is essential for minimizing the risk associated with removal impacts on essential environmental and economic functions. Because removal temporarily reduces the carbon stock of an existing ecosystem, this Module imposes stricter criteria than the Residue Feedstock accounting criteria, restricting removal to appropriate areas, ensuring biosecurity and preventing unacceptable impacts to ecosystems and communities.
All Standing Stock Feedstock submissions must comply with all the criteria in SSC1 where the feedstock is woody, or SSC2 where the feedstock is non-woody.
The feedstock is woody biomass removed by or for the Project from a standing biomass pool that the Project did not establish, for example, coppice of unmarketable short-rotation wood, thinning or invasive/restoration harvest where the removal is attributable to the Project. All feedstocks meeting this description must comply with all the requirements under SSC1. SSC1 is similar in scope to PSC1 but adjusted for woody feedstocks that are harvested by the Project, rather than cultivated by the Project. Aspects covered in PSC1, such as water stress, erosion, the spread of invasive species and social/ecological sustainability are all covered under the Tier 1 forestry sustainability assurance framework. Direct land-use change for woody Standing Stock Feedstocks is assessed under SDLUC1, SDLUC2 or SDLUC3 (Section 4.3.2).
Table 22 – Standing Stock Sustainability Criteria 1 (Woody)
Criterion ID and Type | Requirement | Documentation Requirements |
SSC1.1Validation and Verification Requirement | [R-HM3Z-0, The feedstock must be sourced from management practices audited against high standards of social and environmental sustainability.] The feedstock must be sourced from management practices audited against high standards of social and environmental sustainability. Key sustainability principles include:
| [G-HZ1C-0, The Project Proponent must demonstrate that the management practices that produced the feedstock are audited to a high standard of social and environmental sustainability assurance.] The Project Proponent must demonstrate one of the following:
|
SSC1.2Validation and Verification Requirement | [R-58ZM-0, Projects must demonstrate that the forest carbon stocks in the Sourcing Region are stable or increasing.] Projects must demonstrate that the forest carbon stocks in the Sourcing Region are stable or increasing. Datasets used must include data no older than 12 months prior to the start of the Project sourcing activities. The ecological disturbance exemption present in SC1.2 is not available for use here unless the Project can demonstrate the Project is taking an active role in contributing to the mitigation of such an ecological disturbance such as wildfire mitigation, as defined in Appendix E.2 or the removal of infested or invasive woody species or where the Project can demonstrate that the landscape carbon stock will be improved by the Project intervention. [/R-58ZM-0] | [G-5KX1-0, The Project Proponent must demonstrate that the landscape carbon stocks in the Sourcing Region are stable/increasing or the Project will directly contribute to the reduction in the decline of carbon stocks.] The Project Proponent must provide one of the following:
|
SSC1.3Validation Requirement | [R-RXV9-0, The feedstock must not originate from converted high-value forest land.] The feedstock must not originate from land that held the following status in or after January 2008, whether or not the land continues to hold that status:
| [G-S8RP-0, The Project Proponent must demonstrate that the feedstock is not sourced from converted high-value forest land.] The Project Proponent must provide one of the following:
|
SSC1.4Validation or Verification Requirement | [R-CJPY-0, The feedstock must not be diverted from a productive use, and its sourcing must not interrupt, limit, defer or otherwise interfere with the production of long-lived wood-based products, or reduce or defer any other commodity output from the harvested area.] The feedstock must not be diverted from a productive use. This requires all of the following:
| [G-CXMB-0, The Project Proponent must demonstrate that the feedstock would not have been used productively in the absence of the Project, and that the harvesting activity does not restrict, defer or otherwise interfere with productive use of the harvested area.] The Project Proponent must provide both of the following (A and B). The Project Proponent must provide one of the following:
|
The feedstock is non-woody biomass removed by or for the Project from a standing biomass pool that the Project did not establish, for example invasive herbaceous feedstock, or grassland or wetland biomass removed for restoration. All feedstocks meeting this description must comply with all the requirements under SSC2. SSC2 is similar in scope to PSC1 but omits the criteria that apply only to cultivation, namely water abstraction (PSC1.3), albedo (PSC1.5) and prime agricultural land (PSC1.6), because a Project removing an existing standing stock does not irrigate, convert land to a non-woody crop or occupy agricultural land. Direct land-use change for non-woody Standing Stock Feedstocks is assessed under SDLUC2 (Section 4.3.2).
Table 23 – Standing Stock Sustainability Criteria 2 (Non-Woody)
Criterion ID and Type | Requirement | Documentation Requirements |
SSC2.1Validation Requirement | [R-KWE8-0, The feedstock must not originate from land that held a high-value status in or after January 2008.] The feedstock must not originate from land that held any of the following statuses in or after January 2008, whether or not the land continues to hold that status:
| [G-M7BN-0, The Project Proponent must demonstrate that the land from which the feedstock is harvested has not been converted from a high-value landscape.] The Project Proponent must provide one of the following:
|
SSC2.2Validation Requirement | [R-7H9X-0, The feedstock must not originate from converted high-value land.] The feedstock must not originate from land that held any of the following statuses in January 2008, and no longer holds that status:
| [G-7W7A-0, The Project Proponent must demonstrate that the feedstock does not originate from converted high-value land.] The Project Proponent must provide one of the following:
|
SSC2.3Validation Requirement | [R-V65J-0, The removal of the feedstock must not contribute to the erosion of high erosion-risk areas.] The removal of the feedstock must not contribute to the erosion of high erosion-risk areas. [/R-V65J-0] | [G-VH2Z-0, The Project Proponent must demonstrate that the feedstock harvesting does not contribute to the erosion of high erosion-risk areas.] The Project Proponent must provide one of the following:
|
SSC2.4Validation or Verification Requirement | [R-EV17-0, The removal of the feedstock must not increase the risk of undesired proliferation of the feedstock species or of any pest or pathogen it carries.] The removal of the feedstock must not increase the risk of undesired proliferation of the feedstock species or of any pest or pathogen it carries. [/R-EV17-0] | [G-F5YM-0, The Project Proponent must demonstrate that the feedstock harvesting will not lead to the increased spread of invasive species, pests or pathogens.] The Project Proponent must provide one of the following:
|
SSC2.5Validation and Verification Requirement | [R-2FWW-0, The Project Proponent must ensure the removal of the feedstock does not compromise the local environment or community.] The Project Proponent must ensure the removal of the feedstock does not compromise the local environment or community. [/R-2FWW-0] | [G-2TT9-0, The Project Proponent must demonstrate that the environmental and social risks associated with the feedstock harvest have been appropriately assessed and mitigated.] The Project Proponent must provide evidence demonstrating compliance with all requirements in Appendix E.3. [/G-2TT9-0] |
SSC2.6Validation or Verification Requirement | [R-MK68-0, The feedstock must not be diverted from a productive use, and its sourcing must not interrupt, limit, defer or otherwise interfere with the production of products or any other commodity output from the harvested area.] The feedstock must not be diverted from a productive use. This requires all of the following:
| [G-XYW9-0, The Project Proponent must demonstrate that the feedstock would not have been used productively in the absence of the Project, and that the harvesting activity does not restrict, defer or otherwise interfere with productive use of the harvested area.] The Project Proponent must provide evidence appropriate for the feedstock and counterfactual use. This must include at least one of the following:
|
This section establishes the requirements for quantifying the carbon stock impact of removing biomass from an existing standing stock. Displacement of production that would otherwise have occurred on that land is not quantified: it is prohibited under SSC1.4 and SSC2.6.
This section covers two components which must be assessed for all Standing Stock Feedstocks:
The Project Proponent must establish the counterfactual land use and the carbon stock of the standing stock for each feedstock, known as a Land Use Declaration. Where feedstocks are removed from distinct land with different historical land use, feedstocks must be submitted to Isometric as separate feedstock submissions. The Land Use Declaration must demonstrate the land use and carbon stock trajectory that the parcel would have followed in the absence of the Project.
The default Land Use Declaration is an assumption of current use persistence: in the absence of the Project, the standing stock remains in place and its carbon stock remains at no less than its current level plus any forgone sequestration (i.e., the growth of immature biomass that would have occurred in the absence of the Project).
The default Land Use Declaration may not be departed from. Where the removal of the standing stock, or a change of land use that requires its removal, was already scheduled or legally committed and funded independently of CDR revenue, for example under an existing management plan, statutory obligation or planning consent, the biomass would have been removed regardless of the Project. Such pre-committed removals are not Standing Stock Feedstocks: they are conservation and management residues and must be assessed under SC7 in Section 2.3.7 rather than under this section, even where the Project performs or takes over the removal. A removal that is merely intended, expected or market-driven is not pre-committed, and the default Land Use Declaration applies.
The Land Use Declaration is valid for the Crediting Period. All Standing Stock Feedstocks must comply with the following requirement.
Table 24 – Standing Stock Land Use Declaration Criteria
Criterion ID and Type | Requirement | Documentation Requirements |
SLUD1: All Standing Stock Feedstock submissions must demonstrate what would have happened to the standing stock, and the land from which it is removed, in the absence of the Project. | ||
SLUD1.1Validation Requirement | [R-P4RH-0, The counterfactual land use and carbon stock trajectory of the land in the absence of the Project is documented.] The counterfactual land use and carbon stock trajectory of the land in the absence of the Project is documented. The default trajectory is persistence of the current/historical land use, as set out in Section 4.3.1. Where the removal of the standing stock, or a change of land use that requires its removal, was already scheduled or legally committed and funded independently of CDR revenue (a pre-committed removal), the feedstock is not a Standing Stock Feedstock and must be assessed as a Residue under SC7, as set out in Section 4.3.1. A removal that is merely intended, expected or market-driven is not pre-committed, and the default trajectory applies. [/R-P4RH-0] | [G-PFNY-0, The Project Proponent must demonstrate the most likely use of the land from which the feedstock is harvested in the absence of the Project.] The Project Proponent must provide one of the following:
|
Direct Land-Use Change (dLUC) is the change in carbon stock caused by the Project's removal of biomass from a standing stock, or change in forest management or harvest regime, measured against the baseline established under the Land Use Declaration in Section 4.3.1.
All Standing Stock Feedstocks must demonstrate compliance with one of the following criteria, chosen by removal type. SDLUC1 applies to sustained-yield harvests of woody feedstocks assessed under SSC1, where the stand will continue to be harvested: dLUC is quantified by modeling the regrowth trajectory (Section 4.3.2.1), and the carbon stock removed must be modeled to regenerate to at least 85% within 15 years and 100% within 30 years (the recovery thresholds), tested using Equation 17. SDLUC2 applies to one-off clearance of woody feedstocks assessed under SSC1 and to herbaceous removals of non-woody feedstocks assessed under SSC2: dLUC is quantified using a two-pool comparison of the counterfactual and Project carbon stocks (Section 4.3.2.2), without modeling the regrowth trajectory. SDLUC3 applies to Eligible Wildfire Mitigation activities performed by, or specifically stimulated by, the Project, and sets dLUC to zero; where a feedstock meets SDLUC3, SDLUC3 applies. SDLUC3 applies to woody feedstocks assessed under SSC1 only, so non-woody feedstocks assessed under SSC2 must comply with SDLUC2. A quantification of Direct Land-Use Change may result in 0 dLUC emissions depending on the Project's sourcing practices and the counterfactual land use. These criteria apply to Standing Stock Feedstocks, as a replacement for counterfactual storage which applies to Residue Feedstocks.
Table 25 – Standing Stock Direct Land-Use Change Criteria
Criterion ID and Type | Requirement | Documentation Requirements |
SDLUC1: The production of the feedstock introduces a sustained-yield harvest, or a new or materially intensified harvest regime, on an existing woody stand that will continue to be harvested, such as a stand facing declining commercial demand or an over-coppiced plantation brought back into rotation. [math: CO_2e_{dLUC}] is quantified. Applies to woody feedstocks assessed under SSC1. | ||
SDLUC1.1Validation and Verification Requirement | [R-XEFV-0, The feedstock must have been assessed under SSC1. Where a feedstock is produced from an existing forestry or plantation system subject to a newly introduced or materially intensified harvest regime, such as a stand facing declining commercial demand or an over-coppiced plantation brought back into rotation, the Project Proponent must quantify dLUC in accordance with Section 4.3.2.1 by establishing the carbon stock removed by the harvest, accounting for the forgone growth as a result of that harvest, and demonstrating the stand is modeled to recover at least 85% of the harvested carbon within 15 years and 100% within 30 years.] The feedstock must have been assessed under SSC1. Where a feedstock is produced from an existing forestry or plantation system subject to a newly introduced or materially intensified harvest regime, such as a stand facing declining commercial demand or an over-coppiced plantation brought back into rotation, the Project Proponent must quantify dLUC in accordance with Section 4.3.2.1 by establishing the carbon stock removed by the harvest, accounting for the forgone growth as a result of that harvest, and demonstrating the stand is modeled to recover at least 85% of the harvested carbon within 15 years and 100% within 30 years. The shortfall of the modeled year-15 carbon stock against the counterfactual year-15 carbon stock (Equation 18) must be subtracted from gross removals and cannot be refunded by reconciliation of the carbon stock level by year 30. Where a stand subject to a newly introduced or materially intensified harvest regime does not meet the recovery thresholds, feedstock from that stand is ineligible for generating removals under this Module and must not be harvested. [/R-XEFV-0] | [G-XSD8-0, The Project Proponent must provide an evidenced quantification of the change in carbon stocks and flows induced by the Project.] The Project Proponent must provide all of the following:
|
SDLUC2: The removal of the feedstock is a one-off clearance of a standing biomass pool, such as the removal of invasive, infested or encroaching species under a restoration plan or the clearance of an abandoned plantation or degraded ecosystem, or the removal of herbaceous biomass that regrows from a retained root system. [math: CO_2e_{dLUC}] is quantified using a two-pool carbon stock comparison. Applies to woody feedstocks assessed under SSC1 and non-woody feedstocks assessed under SSC2. | ||
SDLUC2.1Validation and Verification Requirement | [R-9SM6-0, The Project Proponent must quantify dLUC for each treatment area as the difference between the carbon stock of the treatment area under the counterfactual land use established under the Land Use Declaration and its carbon stock in the Project land-use state after removal, both including above- and belowground biomass and soil organic carbon pools, established per hectare consistent with PDLUC1 and in accordance with Section 4.3.2.2. The regrowth trajectory does not need to be modeled.] The Project Proponent must quantify dLUC for each treatment area as the difference between the carbon stock of the treatment area under the counterfactual land use established under the Land Use Declaration and its carbon stock in the Project land-use state after removal, both including above- and belowground biomass and soil organic carbon pools, established per hectare consistent with PDLUC1 and in accordance with Section 4.3.2.2. The regrowth trajectory does not need to be modeled. Where the Project carbon stock equals or exceeds the counterfactual carbon stock, [math: CO_2e_{dLUC}] = 0. Any shortfall must be subtracted from Project removals. Where default values are used, [math: CStock_{CF}] must be taken at the upper bound and [math: CStock_{Proj}] at the lower bound of the published uncertainty range. The Project Proponent must also demonstrate, in accordance with Section 4.3.2.2, that the Project carbon stock is at least 85% of the counterfactual carbon stock (the two-pool eligibility test). Where this test is not met, feedstock from that treatment area is ineligible for generating removals under this Module and must not be removed. [/R-9SM6-0] | [G-A4HK-0, The Project Proponent must demonstrate that dLUC has been accurately assessed and appropriately accounted for.] The Project Proponent must provide all of the following:
|
SDLUC3: The feedstock is produced from Eligible Wildfire Mitigation activities performed by, or specifically stimulated by, the Project. [math: CO_2e_{dLUC}] = 0. Applies to woody feedstocks assessed under SSC1. Where a feedstock meets SDLUC3, SDLUC3 applies. | ||
SDLUC3.1Validation and Verification Requirement | [R-H3BG-0, The feedstock is produced from Eligible Wildfire Mitigation activities performed by, or specifically stimulated by, the Project.] The feedstock is produced from Eligible Wildfire Mitigation activities performed by, or specifically stimulated by, the Project. Wildfire mitigation that was pre-committed independently of CDR revenue is a Residue and must be assessed under SC7 (Section 2.3.7; see Section 4.3.1). [/R-H3BG-0] | [G-HE8X-0, The Project Proponent must provide evidence that the feedstock is sourced from Eligible Wildfire Mitigation activities as defined in Appendix E.2.] The Project Proponent must provide evidence that the feedstock is sourced from Eligible Wildfire Mitigation activities as defined in Appendix E.2. [/G-HE8X-0] |
Where a feedstock submission complies with SDLUC1 or SDLUC2 in Table 25, the Project Proponent must quantify the change in carbon stock using the following quantification framework. The framework in Section 4.3.2.1 must be followed where feedstock submissions demonstrate compliance with SDLUC1. The framework in Section 4.3.2.2 must be followed where feedstock submissions demonstrate compliance with SDLUC2.
SDLUC1 applies to woody feedstocks assessed under SSC1. Where a feedstock complies with SDLUC1, that is, where a Project introduces new or intensified harvest pressure onto an existing forestry or plantation system, such as a stand facing declining commercial demand (e.g., pulp and paper) or one no longer economically merchantable (e.g., an over-coppiced plantation), the following equations must be used to quantify dLUC. This framework allows removed carbon to be treated as a temporary, rather than permanent, reduction in the landscape carbon stocks, provided the Project can demonstrate regrowth consistent with the requirements of this Section.
The Project Proponent must first establish, for each stand, how much carbon the Project's harvest actually removed.
[math: HarvestedStock_i] is the carbon stock removed from the stand [math: i] by the Project's harvest, expressed in tonnes of carbon, where [math: i] is an index of stands.
The Project Proponent must establish [math: HarvestedStock_i] using one of the following two methods:
Under both methods, the Project Proponent must demonstrate that the removed feedstock, measured by weighscales or equivalent, together with targeted residue retention thresholds enforced by the relevant forestry management framework, is reasonably comparable to the [math: HarvestedStock_i] value.
Inventory-based assessments under either method must follow the sampling design, plot-based measurement, and precision requirements set out in Appendix F, Section F.1, applied to the living aboveground biomass. For the stock comparison method, the pre-harvest inventory must be conducted no more than 2 months before harvest, and the post-harvest inventory must be conducted before any regrowth on the harvested footprint could be captured in the assessment of the stand's remaining standing trees.
Increasing harvest intensity or harvesting a stand prior to maturity means the stand cannot accrue the growth it would have gained had it remained standing or been harvested at a lower intensity. This is referred to as forgone sequestration. Projects must model the stand carbon stock in the counterfactual scenario ([math: CStock_{CF,i,t}]) of an unmodified harvest regime. This must be modeled using a growth curve chosen in accordance with Appendix F, Section F.2.
The Project Proponent must model the rate at which the harvested carbon stock is expected to regenerate on the same parcel of land, using a conservative growth model. This must be modeled using a conservative growth assumption – a stated percentile at or below the 20th percentile of observed regional growth-and-yield variability for the relevant species, or an equivalent documented conservative discount where percentile data is unavailable, such that actual regrowth is expected to exceed the modeled trajectory in the majority of cases. Where the Project Proponent can demonstrate that the 20th-percentile default is not representative of the site or data available – for example because of a small underlying sample size, a data source that does not resolve to percentile-level granularity, or variability driven by factors unrelated to genuine site productivity – an alternative conservative adjustment may be agreed with Isometric and the VVB on a case-by-case basis, provided the Project Proponent demonstrates the proposed adjustment remains conservative relative to the specific site and data source used. A Project that can draw from existing parallel practices, such as regional commercial forestry that can show a given growth increment following a harvest event, is considered appropriate for this basis, subject to evidence.
Where conservative parameters show less than 85% recovery in 15 years, or that the stand will not fully recover in 30 years, the feedstock is ineligible under this Module and the stand must not be harvested. Where the Project Proponent cannot evidence the percentile or documented conservative discount required for [math: CStock_{Regrowth,i,t}], or where the VVB is unable to reproduce the modeled trajectory from the stated inputs and data sources, the modeled trajectory is not accepted and the feedstock is ineligible.
[math: RegrowthFraction_{15,i} = \dfrac{CStock_{Regrowth,i,15} - CStock_{Regrowth,i,0}}{HarvestedStock_i},\quad RegrowthFraction_{30,i} = \dfrac{CStock_{Regrowth,i,30} - CStock_{Regrowth,i,0}}{HarvestedStock_i}]
(Equation 17)
Where:
Where conservative models predict [math: RegrowthFraction_{15,i}] < 0.85 the feedstock is ineligible and must not be harvested to produce CDR feedstock.
Where conservative models predict [math: RegrowthFraction_{30,i}] < 1 the feedstock is ineligible and must not be harvested to produce CDR feedstock.
[math: CO_2e_{dLUC,i} = max\left( 0, CStock_{CF,i,15} - CStock_{Regrowth,i,15} \right)\ \cdot \dfrac{44}{12}]
(Equation 18)
Where:
The regrowth model must be conservative and therefore actual field-measured regrowth is expected to exceed it. The Project Proponent may claim a refund, recalculating the debit with the field-measured carbon stock in place of the modeled stock, either at 15 years or at the point where the field-measured carbon stock reaches the modeled counterfactual carbon stock at year 15, whichever comes first. Carbon recovered after 15 years is not refundable. The Project Proponent must still hold a registered Project with Isometric and provide exceptional inventory documentation demonstrating the carbon stock. Where these conditions are not met, the refundable volume is forfeited.
[math: CO_2e_{dLUC,Refund,i,t_v} = max\left( 0, CO_2e_{dLUC,i} - max\left( 0, CStock_{CF,i,15} - CStock_{Actual,i,t_v} \right) \cdot \dfrac{44}{12} \right)]
(Equation 19)
Where:
dLUC under SDLUC1 is quantified as CO2e and is then subtracted from gross removals as a Project emission in the Reporting Period in which the corresponding feedstock is utilized.
SDLUC2 applies to one-off clearance of woody feedstocks assessed under SSC1, such as the removal of invasive or encroaching species under a restoration plan, and to the removal of non-woody (herbaceous) feedstocks assessed under SSC2, such as grassland, reed and rush beds or herbaceous invasive species cut above ground that regrow from the retained root system. SDLUC2 is a two-pool test: it compares the carbon stock of the treatment area under the counterfactual land use with its carbon stock in the land-use state after removal, consistent with PDLUC1 (Section 3.3.2.1), and the regrowth trajectory does not need to be modeled. Where a feedstock complies with SDLUC2, the following equation must be used to quantify dLUC for each treatment area [math: i], where [math: i] is an index of the discrete areas from which the Project removes standing stock under a single restoration prescription or removal regime:
[math: CO_2e_{dLUC,i} = max\left( 0, CStock_{CF,i,15} - CStock_{Proj,i,15} \right)\ \cdot \dfrac{44}{12}]
(Equation 20)
Where:
Both carbon stocks are established per hectare and multiplied by the area of treatment area [math: i] in hectares, using one of the options in PDLUC1.1 (Section 3.3.2, Table 19): Tier 2 country-specific IPCC default values with a demonstration of their applicability to the site; Tier 1 IPCC default values (for example, the grassland soil carbon stock change factors for land use, management and input level) with a confirmation that Tier 2 values were not available; or direct field measurements or directly comparable regional studies, with measurement in accordance with Appendix F, Section F.1 (Section F.1.2 for non-lignified aboveground biomass). Where the target land-use state is not yet established, its carbon stock may be measured at a directly comparable reference site already in that state. Where default values are used, [math: CStock_{CF,i,15}] must be taken at the upper bound and [math: CStock_{Proj,i,15}] at the lower bound of the published uncertainty range.
Where [math: CStock_{Proj,i,15}] is equal to or greater than [math: CStock_{CF,i,15}], [math: CO_2e_{dLUC,i}] = 0. In place of the recovery thresholds and Equation 17, SDLUC2 feedstocks must meet a two-pool eligibility test: [math: CStock_{Proj,i,15}] must be at least 85% of [math: CStock_{CF,i,15}]. Because restoration may deliberately replace one carbon stock with another of different composition, the test is applied to the total carbon stock of the treatment area (above- and belowground biomass and soil organic carbon) rather than to the species removed. This is intended: restoration that converts a higher-carbon stock to a lower-carbon ecosystem, such as removing woody encroachment to restore grassland, heathland or savanna, will not meet the test and is therefore ineligible as a Standing Stock Feedstock, regardless of any dLUC deduction. Biomass from such activities is only eligible where the removal is pre-committed (scheduled or legally committed and funded independently of CDR revenue), in which case it is assessed as a conservation and management residue under SC7. As with any Standing Stock Feedstock, any shortfall of [math: CStock_{Proj,i,15}] against [math: CStock_{CF,i,15}] must be subtracted from Project removals in the Reporting Period in which the feedstock is utilized, and the Project must result in a net atmospheric benefit.
For woody feedstocks, the carbon stock removed from each treatment area, [math: HarvestedStock_i], must be established using one of the two methods set out in Section 4.3.2.1, and the removed feedstock, measured by weighscales or equivalent, must be reasonably comparable to it. For non-woody feedstocks, [math: HarvestedStock_i] is the aboveground carbon stock removed in a removal event, established either from paired pre- and post-removal clip-plot sampling in accordance with Appendix F, Section F.1.2, or as the dry weighscale mass of feedstock removed multiplied by its carbon fraction, assessed according to ISO 16948:2015 or using a conservative literature value.
For recurring herbaceous removals, the treatment area must also regrow to at least [math: HarvestedStock_i] before the next removal event and remain in the same land-cover category. This must be evidenced by a post-regrowth clip-plot survey in accordance with Section F.1.2, or by a remote-sensing biomass time series calibrated against such a survey, in the first Reporting Period after regrowth and at least every five years thereafter. Where the removal regime prevents regrowth to this level, for example where cutting is more frequent than the vegetation can recover from, the feedstock is ineligible and must not be removed to produce CDR feedstock. A change to the removal regime assumed in [math: CStock_{Proj,i,15}] is a material change and requires [math: CO_2e_{dLUC,i}] to be re-quantified.
Where [math: CStock_{Proj,i,15}] was established from default values or a reference site, the Project Proponent may claim a refund once field measurement of the treatment area, in accordance with Appendix F, Section F.1 and on the same basis (including the cutting-cycle average for recurring removals), demonstrates a higher carbon stock. The refund is calculated using Equation 19 in Section 4.3.2.1, with the measured stock in place of [math: CStock_{Actual,i,t_v}], and is capped at the [math: CO_2e_{dLUC,i}] originally debited for that treatment area.
dLUC under SDLUC2 is quantified as CO2e and is then subtracted from gross removals as a Project emission in the Reporting Period in which the corresponding feedstock is utilized.
All emissions associated with the harvesting and removal of Standing Stock Feedstock must be accounted for in the Project's LCA. This includes, but is not limited to, operational emissions such as fuel and energy use in harvesting and extraction, site access and restoration emissions such as road construction, site preparation and replanting, and embodied emissions such as equipment and consumables, consistent with the requirements set out in the GHG Accounting Module. The change in carbon stock caused by the removal of the standing stock is accounted for as a land-use change emission under Section 4.3.2.
Isometric would like to thank the following contributors to this Module:
Matthew Gammans, Ph.D. (North Dakota State University)
Kevin Fingerman, Ph.D. (Cal Poly Humboldt)
Tim Hansen (350 Solutions)
This appendix details how the Project Proponent must monitor, document and report allthe metricsparameters identified within this Module that are used to calculatequantify Project removals, net of counterfactual emissionsstorage, market leakage, direct and indirect land-use change, and feedstock-related deductions. Following this guidance will ensureenable the Project Proponent measures and confirms removals and long-term storage compliance, and will enable quantification of thenet emissionsGHG removal resulting from the Project activityremovals during the Projecteach Reporting Period and support the Verification of counterfactual storage, priormarket toleakage, eachland-use Verificationchange and Sustainable/Baseline Rate compliance.
This methodology utilizes a comprehensive monitoring and documentation framework that captures the GHG impact inof the Project's feedstock sourcing and use at each relevant stage of a Project. Monitoring and detailed accounting practices must be conducted throughout the Crediting Period to ensure the continuous integrity of the removals and CreditingCertification.
The Project Proponent must develop and apply a monitoring plan according to ISO 14064-2 principles of transparency and accuracy that allows the quantification and proof of GHG removals. Where a parameter listed below is not applicable to a given Project's feedstock pathway – for example, because the feedstock qualifies for a zero-emissions removalscriterion under Market Leakage, Direct Land-Use Change or Indirect Land-Use Change – the Project Proponent is not required to monitor that parameter, but must document the basis for its non-applicability.
Table |
|---|
Parameter | Parameter Description | Equation | Parameter Type | Units | Data Source | Monitoring Method | Monitoring Frequency | QA/QC Procedure | Required Evidence | Reference | |||||||||||
[math: CO_2e_{ | |||||||||||||||||||||
The mass of biogenic CO2e | Equation | Measured or conservatively selected from literature. | Tonnes CO2e | Feedstock carbon content | |||||||||||||||||
The Project Proponent must measure the mass of | Each feedstock batch, every Reporting Period. | ISO 16948:2015-compliant analysis; justification documented where a conservative literature value is used in place of direct measurement. | Certificate of analysis (or equivalent lab report) and batch mass records (e.g., weighscale tickets). | Section 2.4.5; Equation 4. | |||||||||||||||||
[math: CO_2e_{FeedstockIn, i}] | The mass of biogenic CO2e contained within delivery [math: i] when entering long-duration storage (>4 weeks), used to assess CH4 emissions from anaerobic storage. | Equations 2 & 3 | Measured or conservatively selected from literature. | Tonnes CO2e | Feedstock carbon content | ISO | The Project Proponent must measure the mass of each feedstock batch and analyze its carbon content, assessed in accordance with ISO 16948:2015. Where the feedstock is not directly measured, a conservative literature-derived value must be used and justified. | At Verification. | ISO 16948:2015-compliant analysis; justification documented where a conservative literature value is used in place of direct measurement. | Certificate of analysis (or equivalent lab report) and batch mass records (e.g., weighscale tickets, receipts of feedstock delivery etc.). | |||||||||||
[math: CO_2e_{BioStorage,RP}] | The methane emissions from anaerobic decay during feedstock storage prior to utilization, deducted from gross removals for feedstock deliveries that do not satisfy FS1, summed over the Reporting Period. | Equation 3 | Calculated | Tonnes CO2e | [math: StorageMonths_i] (delivery storage duration) and [math: CO_2e_{FeedstockIn,i}]. | The Project Proponent must record the date each feedstock delivery enters and exits storage to determine [math: StorageMonths_i], and apply the Equation 3 formula using the applicable [math: GWP_{CH_4}] value from the latest IPCC Assessment Report. | Each feedstock delivery, every Reporting Period unless FS1 is demonstrated. | Storage duration cross-checked against inventory/dispatch logs; the IPCC Assessment Report vintage used for [math: GWP_{CH_4}] confirmed. | Storage/inventory logs showing delivery in/out dates; calculation worksheet. | Section 1.6.1. | |||||||||||
[math: CO_2e_{Counterfactual,RP}] | Total biogenic carbon ineligible to generate removals in the Reporting Period (counterfactual storage), before dynamic tail Certificates are applied. | Equations 4 & 5 | Calculated | Tonnes CO2e | [math: CO_2e_{Feedstock,i}]; [math: CO_2e_{CFEmissions,i,(0,15)}]; [math: CO_2e_{CFStorage,i,50}], from the counterfactual fate and storage assessment. | Calculated per feedstock batch and aggregated across all NB batches used within the Reporting Period. | Each feedstock batch; aggregated every Reporting Period. | Counterfactual storage assessment relies on one of the | Counterfactual fate/storage assessment report, decay-model output, and the Reporting-Period batch register. | Sections 2.4.1–2.4.5. | |||||||||||
[math: CO_2e_{Tail,m}] | The dynamic 'tail' Certificates issued for feedstocks with counterfactual storage extending beyond the near-term horizon, recomputed as the decay-model output evolves over time. | Equations 6 & 7 | Calculated | Tonnes CO2e | Re-evaluation of the batch's counterfactual-storage decay-model output at each subsequent timestep, [math: T_n], following the initial batch assessment. | The Project Proponent must recompute the applicable decay-model output for each batch still accruing tail Certificates, and reconcile against the batch's original [math: CO_2e_{CFStorage,i,50}] assessment. | Every Reporting Period for each batch with outstanding tail Certificates, for the duration those Certificates remain due. | Cumulative tail issuance reconciled against the batch's original counterfactual storage assessment to prevent over-issuance. | Updated decay-model outputs for each Reporting Period; tail-issuance ledger by batch. | Section 2.4.5.1. | |||||||||||
[math: CO_2e_{Leakage,RP}] (residues) | The GHG emissions from the Project's impact, via Residue Feedstock sourcing, on activities outside the Project's system boundary (market leakage), for feedstocks that do not qualify for a zero-leakage criterion (ML2–ML7) and must be quantified under ML1. | Equation 8 | Assessment | Tonnes CO2e | Identification of the feedstock's counterfactual use and replacement product; MassDiv,i, Convr,i, DFr,i, EFr,i and CO2eAdd,i. | The Project Proponent must undertake the assessment set out in Section 2.5.2, dentifying the counterfactual use, replacement product, conversion factor, displacement factor and emission factor (Equation 8). | Each feedstock, every Reporting Period. | Transparency of rationale; all datasets, assumptions and emission factors documented; sensitivity analysis provided for any conservative adjustment applied. | ML1.1 documentation package: referenced quantification, supporting literature, datasets and assumptions, and conservative-adjustment justification. | ||||||||||||
[math: CO_2e_{dLUC}] | The land-use-change emissions from converting land to produce a Purpose-Grown Feedstock (PDLUC1), assessed as the difference in carbon stock between the counterfactual and Project land-use categories. | Equation 9 | Calculated | Tonnes CO2e | [math: CarbonStock_{CF}] and [math: CarbonStock_{Proj}] (Tier 1/2 IPCC default values, or field measurement per Appendix F.1 where defaults are unavailable or unrepresentative), and the converted Area. | One-time determination at the point of land conversion; where defaults are unavailable or shown to be unrepresentative, measured using the sampling design in Appendix F.1 (minimum plot count per Equation 24). | Once, at the point of conversion for each land parcel; deducted in full in the Reporting Period in which feedstock from the parcel is first utilized; revisited only if new evidence of non-representativeness arises. | Quantified measurement uncertainty with a conservative deduction where material; sampling follows Appendix F.1's stratification and minimum-plot-count requirements. | Carbon-stock quantification report, Land Use Declaration, and (where measured) sampling design and laboratory results. | Section 3.3.2.1; Appendix F.1. | |||||||||||
[math: CO_2e_{Leakage,c}] | The induced land-use-change emissions for a Purpose-Grown Feedstock displacing a commodity that is not CORSIA-modeled (or an approved substitute), quantified using the Increased Supply, New Land ([math: IS]-[math: NL]) approach. | Equations 14–16 | Assessment / Calculated | Tonnes CO2e (output); hectares ([math: ha_{LC,c}]); bone-dry tonnes/year ([math: PPP_c]); bone-dry tonnes/ha/year ([math: Y_{NL,c}]); fraction ([math: IS_c], [math: NL_c]) | Regional/national commodity productivity and yield data (e.g., USDA, FAOSTAT); literature-derived supply/demand elasticities and [math: NL] values (Appendix J defaults, or sourced per the Appendix J procedure); IPCC Table 3A.1.4 carbon-stock factors for [math: EF_{CarbonStock}]. | Recomputed for each displaced commodity, following the procedure in Section 3.5.5. | Each displaced commodity at Validation. | Regional-default sourcing hierarchy per Appendix J. | Yield/production datasets, elasticity and [math: NL] source citations, and the [math: EF_{CarbonStock}] derivation. | Section 3.5.5; Appendix J. | |||||||||||
[math: CO_2e_{Leakage}] (Purpose-Grown) | The | Equations 10–13 | Calculated | Tonnes CO2e | [math: PPP_c] (for Case A, the greater of five-year historical output and the regional average; realized [math: PSP]-based shortfall for intermediate crops under Case B) and [math: EF_{ILUC,c}] (Appendix H, pinned version). | Case A: one-time [math: PPP_c] determination at Project start. Case B: [math: PSP] monitored against realized yields and trued up each Reporting Period, subject to the 3% de minimis materiality gate, with a final true-up on field exit. | Case A: once, at Project start. Case B: every Reporting Period. | 3% de minimis materiality gate (Case B); confirmation that the Appendix H version used is pinned and cited. | Historical output/regional-default records (Case A); [math: PSP] yield-monitoring records and shortfall calculation (Case B); Appendix H factor citation. | Sections 3.5.1–3.5.6; Appendix H. | |||||||||||
[math: OE_c] | The oil-equivalent factor used to convert a displaced oilseed or oil-fruit commodity to tonnes of vegetable oil before Equation 10 is applied. | Equation 10 | Measured or conservatively selected from literature. | Fraction (tonnes of oil per tonne of commodity) | Agri-footprint v7, or a published oil extraction rate for the commodity and region. | Selected per Appendix H.3, on the same moisture basis as [math: PPP_c]. | At Validation. | Source and moisture basis checked against [math: PPP_c]; justification required where a published extraction rate is used. | Source of [math: OE_c] and justification. | ||||||||||||
[math: CO_2e_{dLUC,i}] | The land-use-change emissions debited at harvest, based on the modeled year-15 carbon stock, for a stand subject to a newly introduced or intensified harvest regime (SDLUC1), based on the carbon stock the Project's | Equations | Calculated | Tonnes | Pre- and post-harvest stand inventory (or standing-tree census with a stock-based Biomass Conversion and Expansion Factor); counterfactual and regrowth growth curves per Appendix F.2. | Inventory-based | Each stand, at each harvest event; debit determined at each harvest event from the | [math: RegrowthFraction_{15,i}] ≥ 0.85 and [math: RegrowthFraction_{30,i}] ≥ 1 eligibility checks; [math: HarvestedStock_i] cross-checked against weighscale feedstock removal and residue-retention thresholds. | Pre/post-harvest inventory data, growth-curve/model documentation and conservative-percentile justification, and weighscale records. | Section 4.3.2.1; Appendix F.2. | |||||||||||
[math: CO_2e_{dLUC,Refund,i,t_v}] | The refund where the field-measured carbon stock of | Equation 19 | Calculated | Tonnes CO2e | Updated field-inventory data, [math: CStock_{Actual,i,t_v}], against the modeled counterfactual stock [math: CStock_{CF,i,15}]. | Updated stand inventory conducted, per the Appendix F.1 sampling protocol, at the earlier of the stand reaching the year-15 counterfactual stock or 15 years post-harvest. | Once per stand, at the refund validation event ([math: t_v]). | Inventory conducted per Appendix F.1; refund capped at the stand's originally debited [math: CO_2e_{dLUC,i}]. | Updated inventory report and refund calculation. | ||||||||||||
[math: CO_2e_{dLUC,i}] (SDLUC2) | The land-use-change emissions debited for a treatment area under SDLUC2 (one-off clearance or herbaceous removal), assessed as the difference between the counterfactual carbon stock under the Land Use Declaration and the carbon stock of the Project | Equation | Calculated | ||||||||||||||||||
Tonnes | [math: CStock_{CF,i,15}] from the Land Use Declaration (the total carbon stock, including above- and belowground biomass and soil organic carbon, immediately prior to removal, plus any forgone sequestration unless the system is mature); [math: CStock_{Proj,i,15}] as the per-hectare carbon stock of the Project land-use state (cutting-cycle average for recurring removals) from IPCC Tier 2 or Tier 1 defaults, directly comparable regional studies or Appendix F.1 measurement, consistent with PDLUC1; carbon stock removed from pre- and post-removal inventory or standing-tree census (woody) or clip-plot sampling per F.1.2 or dry weighscale mass multiplied by carbon fraction (non-woody). | Per-hectare carbon stocks of the | Each treatment area, at each removal event; debit determined at each removal event from the | Removed feedstock mass reasonably comparable to | Restoration | Section 4.3.2.2; Appendix F.1. | |||||||||||||||
Sustainable Usage Rate (Soil Health) | The rate at which crop residues can be removed from in-field retention without compromising the | N/A – methodological (field-specific erosion/soil-quality modeling) | Assessment | Tonnes/ha/year | Field-specific erosion and soil-quality modeling output (e.g., USDA NRCS's RUSLE2 and the Soil Conditioning Index), or an alternative justified methodology, grouped by field-specific parameters (crop type, rotation, climate, soil type, farming practices, amendments and slope). | Modeling conducted or reviewed by a | Rate | ||||||||||||||
Review by a | Modeling report and reviewer sign-off/credentials. | ||||||||||||||||||||
Sustainable Usage Rate (Competing Demand) ([math: Manure_{SUR}]) | The annual quantity of | Equations | Calculated | Tonnes/year | Livestock | Supplier herd records and published per-animal manure output; deployment-area cropland statistics and agronomic nutrient requirements. | Rate reviewed at Validation. Contracted volume checked against [math: Manure_{SUR}] every Reporting Period. | Inputs cross-checked against herd records and agronomic references; contracted volume must | SUR | ||||||||||||
Baseline Feedstock Generation Rate | The rate at which a feedstock | N/A – narrative | Measured | Tonnes/year | Facility/farm/operation-level | The Project Proponent | Each feedstock supplier at Validation. Feedstocks checked at each Verification where rates are reported unless established by contractual or equivalent obligations. | Isometric/VVB case-by-case review of | Production/disposal records, or output-to-residue ratio documentation where used. | ||||||||||||
Baseline Feedstock Consumption Rate | The rate at which an underlying facility, unrelated to the CDR Project, consumes a feedstock | ||||||||||||||||||||
N/A – narrative | Measured | Tonnes/year | Facility-level consumption data, purchase agreements or customer receipts (five-year history), or a feedstock-to-output ratio where direct data is unavailable. | Recalculated annually using a rolling average; a statistical test (e.g., statistical process control) applied to distinguish normal deviation from an induced change in consumption. | Continuously assessed at each Verification event to check feedstock rate | Statistical test for perceived change in consumption; an upward baseline revision is | Operational data, purchase agreements/receipts, and statistical test documentation. | ||||||||||||||
Parasitic Load | The portion of | N/A | Assessment | Typically expressed in | Design | Depends | |||||||||||||||
Demonstrated | |||||||||||||||||||||
Depends on | Depends on Project |
Isometric Counterfactual Storage Calculator – This tool has been prepared by Isometric to quickly evaluate the counterfactual storage associated with Project feedstock sourcing.1 FertilizerThe Replacement
Foroutputs replacementmay be submitted as part of fertilizerthe functioncounterfactual storage quantification under CS1. Note that the tool is lightweight and applicable to many different feedstocks and therefore may miss nuance associated with regulatory or market shifts. All model submissions of counterfactual storage, including the outputs of this tool, are subject to a review from Isometric and the VVB and evidence must be provided to support the inputs used.
Isometric Feedstock Sourcing Region Mapper – This tool has been developed by Isometric for Projects to simply and effectively demonstrate that their feedstock Sourcing Region does not infringe on the requirements for demonstrating that high-value land has not been converted to feedstock producing land. Depending on the feedstock, the massrelevant oflayers fertilizerare accounted for in emission calculations must account for the equivalent amount of service that the feedstock provided. See Section 8.2 for a worked example using manure.
The total fertilizer capacity previously provided by the feedstock must be calculated based on the feedstock's NPK content. Feedstock NPK content must be determined by sampling of the feedstock for each production batch x, or from available scientific literature.
The amount of fertilizer replacement in the counterfactual scenario must account for replacing the same amount of NPK as in the feedstock, using the most limiting factor (either N, P, K) to determine the mass of fertilizer requireddifferent. This is likelybuilt to be a very conservative estimate, since not all nutrition will be able to be utilized. As better data & evidence is built, a lower estimate can be used when well evidenced with scientific literature.
This section outlines how to calculate the GHG emissions associated with the replacement of manure as a fertilizer, [math: CO_2e_{Replacement}],Directive for ahigh-value specificland quantity of sourced manure from a single location. The actual emissions associated with the replacement material depend on various variables related to the nutrient composition of the sourced manureconversion and theapply nutrientthem requirementsglobally, of the cropland surrounding the manure source location.
If the quantity of manure procured does not exceed the Sustainable Usage Rate then [math: CO_2e_{Replacement},\ x\ =\ 0]. Guidance on calculating the Sustainable Usage Rate can be found in Appendix 4.
The following equationwhich can be used to calculatedemonstrate [math:compliance CO_2e_{Replacement,\with x}].
[math:aCO_2e_{Replacement,\givenx}\ \ =\ \ max(0,\ Rr\ -\ SUR) \cdot (CO_2e_{EmbodiedReplacement}\ +\ CO_2e_{EnergyReplacement}\ +\ CO_2e_{TransportationReplacement})]
(Equation 6)
Where:
Isometric SUR]
Isometric SustainableBiomass UsageFeedstock RateGuidance Documents – This document set provides enablement materials and further guidance that is not in-scope of the residue,Module expressedtext. This includes: explaining the concepts of market leakage and counterfactual storage more thoroughly; providing a repository for biomass-feedstock based frequently asked questions; setting out Isometric's essential forest sustainability criteria for Projects wishing to demonstrate the equivalence of frameworks not included in tonnesTable overC.1; the sourcing region.
UnsustainableThe forest management is a major concern within the BiCRS industry as ratesintegrity of deforestation continue to exceed regeneration in many areas. While carbon stocksCertificates areproduced anfrom importantwoody considerationbiomass for the validity of removal Credits, additional factors must be considered to protect global forests. This is why, in addition to our requirements for carbon stock and primary forest considerations, we have the additional requirement that feedstock sourcing adhere with the principles laid out by leading forest sustainability organizations.
Relyingdepends on the principles and expertisesustainability of thesethe programsfeedstock allowsharvesting. usWhere tofeedstock beis confidentdrawn thatfrom feedstocksforests, sourcedplantations foror removalsdownstream creditedwood-processing byfacilities, Isometricpoor aresustainability vettedcan againsterode or reverse the highestintended standardsclimate tobenefit provide– ecosystem,through cultural andcompromised forest sustainability.regeneration, This includes the maintenanceloss of habitats, the preservation of biodiversity and ecosystem services, asconversion wellof high-value land, soil carbon degradation or the displacement of biomass as respectingan economic or environmentally beneficial resource. Unsustainable sourcing can also have unacceptable knock-on effects on local communities, High Conservation Values and workforces.
Pre-approved forestry certification/management programs are listed in Table 6. Feedstocks sourced from these programs are satisfy the requirementsavailability of forest and associated resources (e.g., water, food etc.). SC1.1 and SC2.1, for useis in any BioCCS or BiCRS project, including retrofit projects, subjectplace to theaddress otherthese criteria outlined in this Module.
For retrofit Projectsconcerns, feedstockto sourcing has a broader range of eligible certification/management programs for the feedstock sourced at or under the Baseline Feedstock Consumption Rate (See Appendix 4 for details). The establishment of baseline feedstock sourcing and quantity provides confidenceensure that the feedstock wouldunderpinning a Project is genuinely sustainable, so that the carbon certified as removed is not offset by harm elsewhere in the supply chain.
Table C.1 contains all currently recognized sustainability assurance frameworks that can be used to demonstrate compliance with SC1.1. The other criteria under SC1 must be complied with and evidenced separately. The frameworks listed in Table C.1 vary in the level of sustainability assurance they provide, and therefore the applicability of each framework to a given feedstock type is constrained. The highest bar, Tier 1, includes accredited forestry management certification programs suitable for demonstrating compliance with SC1.1 under the residue accounting framework and SSC1.1 under the Standing Stock Feedstock accounting framework. Tier 2 frameworks, such as the recognized chain-of-custody and risk-based schemes, are only suitable for sourcing residues. Tier 3 frameworks are restricted to feedstocks that are being sourced and utilized regardless of the BiCRSProject projectintervention, such as those already consumed at a bioenergy facility, where the Project adds capture infrastructure to a previously vented CO2 stream. Tier 3 carries the lowest acceptable bar of sustainability assurance. While the Project's additionality is not contingent on the upstream sourcing behavior, Isometric has deemed it necessary to carry a minimum sustainability assurance framework to ensure unacceptable harvesting practices are not associated with the carbon Certificates produced by an Isometric-registered Project.
Table C.1 – Pre-approved Forestry Sustainability Frameworks
Sustainability Assurance Framework | Applicable Feedstocks | Additional Requirements | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tier 1 (preferred): Accredited forestry management certification, government-mandated or administered frameworks and targeted risk assessments. Applicable to all feedstocks. These
10.0 Appendix |
Criterion ID and Type | Requirement | Documentation Requirements |
OH1: The underlying facility has an established operating history. Feedstock submissions must demonstrate compliance with OH1.1 and OH1.2 to be considered an Eligible Retrofit or Integration Project under the operating-history pathway. | ||
OH1.1Validation Requirement | The Project Proponent must demonstrate that the | The Project Proponent must provide one of the following:
|
OH1.2Validation Requirement | The Project Proponent must demonstrate the underlying facility is not at risk of imminent decline or closure, in line with the requirements in Appendix E.1.3. | Where the underlying facility is considered at risk of being part of a declining industry where the CDR may be extending the life of the facility, as demonstrated by the tests in E.1.3, the Project Proponent must provide all documentation as required by Appendix E.1.3. |
Where the underlying facility does not have an established pre-CDR operating history, applicable to Integration Projects at newly or recently constructed facilities, facility expansions or the conversion of defunct facilities (e.g., coal to BECCS), or in cases where the established pre-CDR operating history does not meet the above requirement for OH1, the Project Proponent must provide all of the following:
Table E.2 – Financial-Model Criteria
Criterion ID and Type | Requirement | Documentation Requirements |
FM1: The underlying facility does not have an established operating history (or its operating history does not satisfy OH1) and its economic viability independent of CDR revenue is demonstrated through a financial model. Feedstock submissions must demonstrate compliance with FM1.1 and FM1.2 and FM1.3 and FM1.4 to be considered an Eligible Retrofit or Integration Project under the financial-model pathway. | ||
FM1.1Validation Requirement | The underlying facility must be financially viable without Carbon Finance. | The Project Proponent must provide one of the following:
|
FM1.2Validation Requirement | The underlying facility would have been constructed in the absence of the Project. | The Project Proponent must provide one of the following:
|
FM1.3Validation Requirement | The removal would not have occurred in the counterfactual. | The Project Proponent must provide a demonstration that, in addition to financial additionality as defined in the Isometric Standard, any tax credit or other financial support mechanisms available to the facility are insufficient on their own to incentivize carbon removal in the counterfactual. By default, where a facility could receive such financial support, the Project must be assessed as receiving it to ensure the CDR is additional. Where the facility is ineligible for such mechanisms, the Project Proponent must provide documentation demonstrating why. |
FM1.4Validation Requirement | The Project Proponent must demonstrate the underlying facility is not at risk of imminent decline or closure, in line with the requirements in Appendix E.1.3. | Where the underlying facility is considered at risk of being part of a declining industry where the CDR may be extending the life of the facility, as demonstrated by the tests in E.1.3, the Project Proponent must provide all documentation as required by Appendix E.1.3. |
Additional safeguards on leakage may be necessary in cases where the feedstock is produced as part of a production process embedded in a declining industry. This section provides the definition of Declining Industry used in Appendix E.1 and provides guidance on when a Project using a feedstock originating from a Declining Industry may or may not be eligible.
A Declining Industry assessment is presumed applicable only in cases where all of the following hold:
A facility is in a Declining Industry if the industry scores High Risk on either a structural decline test or policy-driven decline test, or if an industry scores Moderate Risk on both the structural decline test and policy-driven decline test. Each test is defined below:
Structural decline test.
Structural decline is a sustained, market-driven decrease in industry output that is expected to continue independent of climate policy. It is assessed using a rolling five-year compound annual growth rate (CAGR) of the sum of domestic production and imports for the underlying facility's industry, calculated as [math: CAGR\ = \ \left( \dfrac{End\ Value}{Start\ Value} \right)^{\dfrac{1}{n}} - 1], where [math: n] is the number of years in the measurement period (default 5). Physical production volume is the preferred metric; where unavailable, imputed production (nominal value deflated by an industry-specific price index) may be used, followed by inflation-adjusted nominal value. Imports may be ignored where they constitute less than 10% of the sum of imports and domestic production in the most recent data year. Project Proponents must document the metric tier and data sources used. A five-year CAGR of less than −3% indicates High Risk; a CAGR of −3% or greater but below −1% indicates Moderate Risk; a CAGR of −1% or greater indicates Low Risk. If data for the most recent five-year period are unavailable, the most recent available five-year window may be used, provided its end date is no more than three years prior to assessment; longer periods may be used with justification for industries with long-run cyclical dynamics. Where a facility operates in evaluatinga distinct sub-market or produces a specialized product, supplementary evidence of low structural decline risk may be submitted and will be considered alongside the BaselineCAGR Feedstockmeasure.
Policy-driven Generationdecline Ratetest.
Policy-driven Bydecline linkingrisk eligibilityis High if the underlying facility's Primary Product is identified for phaseout, reduction, or replacement in at least two of the following; Moderate if exactly one; and Low if none:
Feedstocks originating from an underlying facility in a Declining Industry are eligible only if the Project Proponent implements one of the following:
To support the mitigation of climate change, this delayModule permits the utilization of wildfire mitigation residues and feedstocks cleared from high-hazard zones by providing a dedicated route through certain requirements that eases the administrative burden. Globally, escalating temperatures and severe droughts driven by climate change are intensifying wildland fires, which release between 7 and 16 billion tonnes of CO2 equivalent each year. In response, the United States Forest Service (USFS), along with tribal, federal, state, and local entities, is accelerating proactive hazardous fuel treatments through increased ecological thinning. These management efforts are conservatively projected to produce more than 1.2 billion bone-dry tonnes (BDt) of low-value waste residues by 2032, representing over 2 billion tonnes of CO2e that should be cleared from the landscape. Because these materials are typically located in remote areas, viable commercial markets remain scarce. Consequently, non-merchantable thinned biomass is usually piled and burned on-site, a practice that generates substantial greenhouse gas emissions and air pollutants while incurring costs exceeding US[math: 1,800 per hectare (or more than US]50 per BDt).9 For a Wildfire Mitigation activity to be considered eligible to use the given paths through the Module, the Project Proponent must demonstrate compliance with one of the criteria sets outlined in Table E.3.
Table E.3 – Wildfire Mitigation Criteria
Criterion ID and Type | Requirement | Documentation Requirements |
WF1: The activity is mandated, funded or formally endorsed by a competent public authority, or by a body with statutory, regulated or similarly conferred responsibility for wildfire risk. Feedstock submissions must demonstrate compliance with WF1.1 to be considered an Eligible Wildfire Mitigation activity under this criterion. | ||
WF1.1Validation and Verification Requirement | The activity is mandated, funded, or formally endorsed by a competent public authority, or by a body carrying statutory, regulated, or similarly conferred responsibility for wildfire risk – including fire and land management agencies, utilities operating under an approved vegetation management plan, and reputable conservation organizations acting under a plan approved by a competent authority – and the prescription's stated objective is reduction of hazardous fuel load, fuel continuity or predicted fire behavior. | The Project Proponent must provide all of the following:
|
WF2: The wildfire objectives are confirmed as high priority and subject to the oversight of a competent independent professional. Feedstock submissions must demonstrate compliance with WF2.1 and WF2.2 and WF2.3 to be considered an Eligible Wildfire Mitigation activity under this criterion. | ||
WF2.1Validation Requirement | The treatment area is considered a high priority (or equivalent) for treatment to manage wildfire risk and intensity. | The Project Proponent must provide one of the following:
|
WF2.2Validation Requirement | The treatment area, objectives and plan are subject to the oversight of a qualified independent Certified Professional. An individual is considered a Certified Professional when they hold one of the following:
| The Project Proponent must provide all of the following:
|
WF2.3Validation Requirement | The Certified Professional confirms that all management activities to be undertaken by the Project are necessary to reduce the fire risk in the relevant fire regime and that all management activities are consistent with the recognized standards of ecological and social sustainability, addressing at minimum:
| The Project Proponent must provide all of the following:
|
Table E.4 – Environmental Assessment Criteria
Criterion ID and Type | Requirement | Documentation Requirements |
EA1: The production of feedstock is covered by an environmental assessment or suitable oversight demonstrating the production of the feedstock does not compromise the environment. | ||
EA1.1Validation and Verification Requirement | The Project Proponent must ensure the feedstock production or removal does not compromise the local environment or community. The review relied on must address the core considerations below and, where relevant to the activity, the additional considerations. The themes addressed by the additional considerations are covered under the Isometric Standard so may only be relevant where the Project contracts a third party to conduct feedstock harvesting or cultivation. A consideration may be scoped out where the review or assessor documents why the activity cannot reasonably affect it. Core considerations:
Additional considerations (where relevant to the activity):
| The Project Proponent must provide one of the following:
|
EA1.2Validation and Verification Requirement | The production of the feedstock does not result in chemical pollution. This includes at minimum:
| The Project Proponent must provide one of
|
Above- and belowground biomass quantified by direct measurement must be derived using directly comparable methods so that the change in measured pools reflects the actual change in stock, rather than a measurement artifact. Where the counterfactual land-use state cannot be measured, [math: CarbonStock_{CF}] must be derived from a regiondirectly withoutcomparable compromisingreference the region’s ability to meet a specific economicsite, or ecologicalregional need. In the casestudy, of manuredemonstrably equivalent land-use category, forclimate instance,and themanagement Sustainable Usage Rate would represent the highest annual quantity that can be exported while still leaving enough for farmers who rely on it to meet their fertilization requirementshistory.
The followingProject calculationProponent ismust an example of how to calculateprovide the Sustainablefull Usagemeasurement/study Ratemethodology forincluding manuresampling whendesign, therelaboratory ismethods noand observableapplicable counterfactualaccreditation. OtherAll calculations may be appropriatedatasets, particularly for other feedstocks,assumptions and emission/removal factors must be evidencedreported whenfor submittingindependent recalculation. A quantified assessment of measurement uncertainty, with a conservative deduction applied where uncertainty is material, must also be provided, together with a justification for departing from the Tier 1 or Tier 2 IPCC default values.
All sampling must be stratified by land cover/vegetation type, soil type and topography across the land parcel, and the counterfactual/reference and post-conversion sampling must use identical methods and depths and be assessed in the same season.
For each measured pool (PDDAGB., SOC and, where measured directly, BGB) and stratum, the minimum number of sampling locations must be determined using the following equation:
[math:Manure_n_{SURloc}\= max\left(Manure_5, \left( \dfrac{Grosst_{crit} \cdot-CV}{E} \right)^2Manure_{Demand}\right)]
(Equation 824)
Where:
Where either the counterfactual or post-conversion state contains lignified biomass such as forest, woodland, shrubland or perennial woody feedstock (e.g., short-rotation woody crops (SRWC), orchards):
The Project Proponent must report the source of the equation, its validated range and confirm measured stems fall in that range. Where a lower tier of equations is used, the Project Proponent must provide an adequate justification for why higher tiers were unavailable.
Where either the counterfactual or post-conversion state contains herbaceous/non-lignified vegetation, the aboveground biomass must be quantified by destructive harvest. All biomass within a 15quadrat mileis radiusclipped at ground level, oven-dried to constant mass and weighed, with the result scaled to a per-hectare basis. Quadrat placement must follow the stratified sampling design as detailed above.
Belowground biomass may either be derived from the measured aboveground biomass using an applicable root-to-shoot ratio, or measured directly, for example by soil coring or root excavation within the sampling plots, with roots washed, oven-dried to constant mass and weighed. Where derived, root-to-shoot ratios should be regionally validated where available, otherwise an IPCC Tier 1 default consistent with the vegetation type and climate domain must be used with demonstrable justification of application suitability. Where measured, the stratified sampling design and Equation 24 apply, and the counterfactual/reference and post-conversion states must use the same method.
Soil must be sampled to a minimum reference depth of 30 cm or deeper where the Project Proponent, Isometric or the VVB has evidence that the land-use change materially affects carbon below that depth. Land conversion can change soil bulk density, therefore an equivalent soil mass correction must be applied so that the calculation difference reflects an actual change in carbon, rather than an artifact of compaction between the two states.
Bulk density must be measured using the core method at each sampling location and depth increment to convert measured concentration into a stock and support the equivalent soil mass correction.
Total carbon must be determined by dry combustion or a method with equivalent, demonstrable accuracy. Where soils contain inorganic carbon, the inorganic fraction must be separately quantified and subtracted from the total carbon content. Analysis must be conducted by an accredited laboratory under ISO/IEC 17025 or equivalent.
A Purpose-Grown Feedstock Project converts 40 hectares of non-biodiverse grassland under long-term, nominal grazing management to a switchgrass (Panicum virgatum) field grown specifically to produce feedstock for BiCRS. No Tier 2 regional values are available for the land parcel, so the Project Proponent uses Tier 1 default values for the applicable climate and ecological zone to assess both the counterfactual and Project land-use categories. In line with PDLUC1.1, the counterfactual carbon stock is taken at the upper bound and the Project carbon stock at the lower bound of the published uncertainty range. For this illustration, the ranges are assumed to be ±20% for the biomass defaults and ±5% for each soil carbon stock change factor; the soil organic carbon reference stock is common to both land uses and is applied at the same value to both.
The counterfactual grassland has an aboveground biomass default of 4.0 tC/ha, taken at its upper bound of 4.8 tC/ha, and a belowground biomass of 7.7 tC/ha, using the default root-to-shoot ratio of 1.6. The soil organic carbon default for the climate and soil type is 45.0 tC/ha, applied with land-use, management and input factors of 1.0, consistent with grassland under long-term, nominal grazing management (the reference condition, so no bound is applied).
[math:Manure_CarbonStock_{GrossCF} = 4.8 + 7.7 + 45.0 = 57.5]
The switchgrass carries a lower standing biomass than the grassland it replaces, with an aboveground biomass default of 3.0 tC/ha, taken at its lower bound of 2.4 tC/ha, and a belowground biomass of 3.8 tC/ha using the same root-to-shoot ratio. The system is continuously cropped with no tillage and receives regular fertilizer application, so the soil organic carbon default of 45.0 tC/ha is applied with a management factor of 1.1 and an input factor of 1.11, taken at their lower bounds of 1.045 and 1.055, giving 49.6 tC/ha.
[math: CarbonStock_{Proj} = 2.4 + 3.8 + 49.6 = 55.8]
[math: CO_2e_{dLUC} = max(0, 57.5 - 55.8) \cdot 40 \cdot \dfrac{44}{12} = 249.3]
A deduction of 249.3 tCO2e applies to the feedstock. At central default values, the gain in soil organic carbon from converting a grazed pasture to a continuously cropped, fertilized, no-till perennial system would outweigh the reduction in standing biomass and no deduction would apply. Applying the conservative bounds required by PDLUC1.1 reverses this, because the expected soil carbon gain is small relative to the uncertainty in the default values.
A Purpose-Grown Feedstock Project converts 25 hectares of degraded shrubland, previously used for unmanaged goat grazing, to a short-rotation willow (Salix spp.) coppice plantation grown to produce feedstock for BiCRS. The land parcel shows documented soil degradation from decades of uncontrolled grazing, which Isometric and the VVB agree makes the regional Tier 1 defaults unrepresentative of the counterfactual condition. The Project Proponent therefore directly measures the carbon stock of both land-use categories in accordance with Appendix F.1.
The counterfactual shrubland is sampled using the stratified plot design set out in Appendix F.1.1, with aboveground biomass estimated from measured stem diameters using a regionally validated allometric equation for the mixed dryland shrub species present. This gives an aboveground biomass of 12.4 tC/ha. Belowground biomass is derived from the measured aboveground biomass using a regionally validated root-to-shoot ratio of 0.40, giving 5.0 tC/ha. Soil is sampled to 30 cm with an equivalent soil mass correction and analyzed by dry combustion, giving a soil organic carbon stock of 38.2 tC/ha.
[math: CarbonStock_{CF} = 12.4 + 5.0 + 38.2 = 55.6]
Because the coppice stand takes several rotations to reach steady state, the Project Proponent first applies a conservative upfront deduction from a modeled estimate, as required by PDLUC1, and trues it up once steady state is agreed with Isometric and the VVB. The values below are the stand's rotation-average carbon stock measured at that point. Measurement uncertainty is assumed immaterial for this illustration, so no further uncertainty deduction applies. Aboveground biomass, measured using the same allometric approach applied to the planted species, is 9.1 tC/ha, with a belowground biomass of 2.2 tC/ha using a regionally validated root-to-shoot ratio of 0.24. Soil organic carbon, measured using the same protocol as the counterfactual assessment, is 34.5 tC/ha.
[math: CarbonStock_{Proj} = 9.1 + 2.2 + 34.5 = 45.8]
[math: CO_2e_{dLUC} = max(0,55.6 - 45.8) \cdot 25 \cdot \dfrac{44}{12} = 898.3]
The total deduction from net removals for the feedstock is 898.3 tCO2e.
This appendix sets out the required methods and data sources for modeling the forest growth trajectories required under Sections 4.3.2.1 and 4.3.2.2. This includes the counterfactual growth trajectory, [math: CStock_{CF,i,t}], for informing forgone sequestration and the post-harvest regrowth trajectory, [math: CStock_{Regrowth,i,t}], to model recovery of the carbon stock following the Project's harvest. For SDLUC2, which uses a two-pool test rather than a regrowth trajectory, these methods are used only where a growth curve is needed to establish forgone sequestration in [math: CStock_{CF,i,15}].
[math: CStock_{CF,i,t}] models the continued growth of the undisturbed, established biomass. This is the trajectory that the harvested biomass would have followed had the management remained unchanged. This must be derived from growth curves for established stands of the relevant species, age and site class.
[math: CStock_{Regrowth,i,t}] models growth from the post-harvest starting condition following the Project's harvest event, such as bare ground, a coppiced stump, a replanted or naturally regenerated site, or a pruned stand. This follows a different trajectory, typically with a slower establishment phase, and must be derived from data describing regrowth specifically, not general stand growth curves. The Project Proponent must specify the regeneration method used, as this determines which regrowth parameters are applicable.
For both trajectories outlined above, the Project Proponent must use one of the following, in order of preference. As the Project Proponent moves to the lower evidence tiers in the following hierarchy, a justification for their selection must be included.
Where a chronosequence approach is used, the Project Proponent must survey a minimum of 3 comparable stands per age class represented in the curve, each matched to the harvested stand on species, site quality/productivity, and climate. For regrowth curves, regeneration method, disturbance type and time since disturbance must also be representative. Sampling and biomass estimation at each surveyed stand must follow the same methodology as Appendix F.1.1 for AGB.
Consistent with the requirements laid out in Section 4.3.2.1, regrowth modeling must reflect a stated percentile at or below the 20th percentile of observed regional variability. This must be operationalized as follows for each data source type:
The Project Proponent must provide all of the following:
A BiCRS Project sources feedstock from an existing poplar (Populus spp.) short-rotation plantation in the US Pacific Northwest. The stand was planted to feed a bioenergy market that shrank several years ago, leaving the poplar well past its usual cutting cycle. This is now an over-coppiced system that needs restoration to be productive.
Based on an adjacent, mature stand, the stand's carrying capacity is estimated at ~650 tC. Direct inventory immediately prior to harvest records a standing aboveground carbon stock of 585 tC, 90% of the site's ceiling. A post-harvest inventory, conducted prior to any regrowth, records 15 tC remaining, made up of residual stumps and a minimal retained buffer consistent with high-utilization standards.
[math: HarvestedStock_i = 585 - 15 = 570]
Forgone sequestration, the counterfactual growth trajectory, is modeled from the pre-harvest stock of 585 tC toward the site ceiling of ~650 tC. At year 15, the counterfactual stock is 620 tC.
Regrowth is modeled using a two-phase curve reflecting published guidance (Forest Research, UK) that poplar coppice regrowth is slower in the first year after cutback and does not achieve full canopy coverage until years 2–3. Growth in year 1 is therefore set at 40% of the established conservative rate, with 70% in year 2. Years 3 and onwards follow the full conservative rate of 36.7 tC/yr.
Year 1 = 15 + 14.7 = 29.7
Year 2 = 29.7 + 25.7 = 55.4
Year 3 = 55.4 + 36.7 = 92.1
Year 15 = 92.1 + (36.7 × 12) = 532.5
[math: CStock_{Regrowth,i,15} = 532.5]
[math: RegrowthFraction_{15,i} = \dfrac{532.5 - 15}{570} = 0.908]
The amount of regrowth at 15 years compared to the harvested stock is 90.8%, clearing the 85% eligibility threshold. Continuing at 36.7 tC/yr, the modeled stock reaches the site ceiling of ~650 tC around year 18 and is held at the ceiling thereafter, so [math: CStock_{Regrowth,i,30}] = 650 tC and [math: RegrowthFraction_{30,i}] = (650 − 15)/570 = 1.114, clearing the 30-year threshold.
[math: CO_2e_{dLUC,i} = max\left( 0,(620 - 532.5) \right) \cdot \dfrac{44}{12} = 320.8]
The total deduction from net removals for the feedstock is 320.8 tCO2e.
Field-monitored actual growth is measured. At year 11, the field-verified carbon stock reaches 620 tC, which is the modeled counterfactual carbon stock at year 15 (the pre-intervention stock of 585 tC plus the forgone sequestration of 35 tC). Reaching this level triggers an early true-up. Recalculating the debit with the field-measured stock leaves no remaining shortfall, so the full 320.8 tCO2e originally deducted is refunded.
[math: CO_2e_{dLUC,Refund,i,11} = max\left( 0, 320.8 - max(0, 620 - 620) \cdot \dfrac{44}{12} \right) = 320.8]
The net deduction after refund for the Project feedstock is 0 tCO2e, as the full deduction of 320.8 tCO2e is refunded.
A loblolly pine stand in Chile, originally managed for pulp & paper wood production, now stands abandoned due to declining demand. The Project reintroduces harvesting under a selective regime to produce feedstock for BiCRS. Seed trees and large buffers are retained, with the harvested footprint artificially planted.
Direct field inventory measurement immediately prior to harvest records a standing aboveground carbon stock of 1,400 tC. A second, independent inventory immediately after harvest (the stock comparison method in Section 4.3.2.1) records 350 tC remaining, and the weighscale mass of feedstock removed is reasonably comparable to the difference. Therefore [math: HarvestedStock_i = 1400 - 350 = 1050], approximately 75% of the pre-harvest standing stock.
As loblolly pine does not coppice, the counterfactual represents continued growth of the same stand without harvesting. The modeled ceiling of the stock is 2,000 tC using a growth curve. Using modeled growth, the stand would reach 95% of this ceiling in the next 40 years and reach 1,750 tC by year 15 in the counterfactual.
Regrowth is modeled using a sigmoidal growth curve accounting for establishment lag, as well as the senescent phase. At year 15, the stand has regained 955.8 tC, on top of the 350 tC retained at harvest, therefore [math: CStock_{Regrowth,i,15}] = 1,305.8 tC. [math: RegrowthFraction_{15,i} = \dfrac{1305.8 - 350}{1050} = 0.910], therefore the stock is modeled to recover by 91.0% by year 15, passing the 85% eligibility threshold. By year 30, the stand has regained 1,256 tC, so [math: CStock_{Regrowth,i,30}] = 1,606 tC and [math: RegrowthFraction_{30,i} = \dfrac{1606 - 350}{1050} = 1.196], therefore the regrowth is modeled to exceed the amount harvested before year 30.
[math: CO_2e_{dLUC,i} = max(0,1750 - 1305.8) \cdot \dfrac{44}{12} = 1628.7]
The total deduction from net removals for the feedstock is 1,628.7 tCO2e.
Field-monitored actual growth reaches 1,484.2 tC by year 15. The stock therefore did not recover more than the counterfactual scenario, but it did regrow more than the ex ante projection of regrowth. Therefore, a partial refund is given to the Project.
[math: CO_2e_{dLUC,Refund,i,15} = max\left( 0, 1628.7 - max(0, 1750 - 1484.2) \cdot \dfrac{44}{12} \right) = 654.1]
The net deduction for this stand is 1,628.7 - 654.1 = 974.6 tCO2e.
The examples below apply Equation 4 to four counterfactual fates, from a feedstock whose carbon is fully released in the counterfactual to one that would have remained durably stored for decades. Each example uses the same batch – 1,000 tCO2e of biogenic carbon (~273 tC) – so that the effect of the counterfactual fate can be read directly from the result.
Recall Equation 4:
[math: CO_2e_{Counterfactual,i} = CO_2e_{Feedstock,i} - min\left( CO_2e_{CFEmissions,i,(0,15)},CO_2e_{Feedstock,i} - CO_2e_{CFStorage,i,50} \right)]
Every example therefore requires only three quantities: the biogenic carbon in the batch, the [math: GWP_{100}]-weighted emissions that would have occurred in the counterfactual within 15 years, and the carbon that would still have been stored at year 50. The min() selects whichever of the two limits binds: the near-term release, or the 50-year storage ceiling.
The decay rates, stabilized fractions and landfill parameters used below are illustrative. A Project Proponent must derive its own from the sources and models permitted in Section 2.4.6, parameterized conservatively – which, because a higher value of [math: CO_2e_{CFEmissions,i,(0,15)}] produces a smaller deduction, means selecting the lowest defensible counterfactual emission estimate.
Each example is a single batch [math: i]. Under Equation 5 the deduction applied in a Reporting Period is the sum of [math: CO_2e_{Counterfactual,i}] across every batch used in that period.
Almond shells purchased from a huller that, in the absence of the Project, would have sold them to a biomass power station with no carbon capture. Combustion releases the carbon in the year of utilization.
Table G.1 – Example 1 Inputs
Term | Value |
[math: CO_2e_{Feedstock,i}] | 1,000 tCO2e |
[math: CO_2e_{CFEmissions,i,(0,15)}] | 1,000 tCO2e |
[math: CO_2e_{CFStorage,i,50}] | 0 tCO2e |
Calculation (Equation 4):
[math: CO_2e_{Counterfactual,i} = 1000 - min(1000,1000 - 0) = 0\, tCO_2e]
No counterfactual storage. The full 1,000 tCO2e is eligible under the counterfactual storage test. Because the shells are diverted from a third-party power station, market leakage must also be assessed under Section 2.5 (see Section 2.5.2.1), and any resulting [math: CO_2e_{Leakage, i}] is deducted separately.
This shows two things. First, combustion also releases small quantities of CH4 and N2O (ignored in Table G.1 for simplicity), so a [math: GWP_{100}]-weighted [math: CO_2e_{CFEmissions,i,(0,15)}] can exceed the feedstock's own carbon content; the second limb of the min() caps the eligible volume at the carbon actually contained in the batch, so no Certificate can be created from the potency of the counterfactual emissions. Second, this feedstock satisfies CS2.1 – "combusted for bioenergy with no carbon capture in the counterfactual" – so in practice the Project Proponent would demonstrate CS2 and no quantification would be required. The arithmetic is shown only to confirm that the two routes agree.
Fine woody forestry residue (tops and branches) chipped at roadside. In the absence of the Project it would have been spread on the forest floor of a warm temperate site and left to decay.
The Project uses the C-BREC model framework. 0.8% of the feedstock carbon stabilizes into soil organic carbon and is still present at year 50; the remainder decays at k = 0.25 yr-1 (half-life 2.8 years).
Table G.2 – Example 2 Inputs
Term | Value |
[math: CO_2e_{Feedstock,i}] | 1,000 tCO2e |
[math: CO_2e_{CFEmissions,i,(0,15)}] | 968.7 tCO2e |
[math: CO_2e_{CFStorage,i,50}] | 8.0 tCO2e |
(released between years 15 and 50) | 23.3 tCO2e |
Calculation (Equation 4):
[math: CO_2e_{Counterfactual,i} = 1000 - min(968.7,1000 - 8.0) = 1000 - 968.7 = 31.3\, tCO_2e]
A deduction of 31.3 tCO2e, or 3.1% of the batch. 968.7 tCO2e is eligible.
The near-term release binds, as it does for most rapidly decaying residues. Also note how close this feedstock sits to needing no quantification at all: CS3.1 admits a feedstock whose most recalcitrant component decays at k ≥ 0.353 yr-1 (a half-life of 1.96 years or less), and at k = 0.25 yr-1 this one misses that route. Because the deduction exceeds 1% of the batch, the de minimis provision in Section 2.4.5 does not apply and the 31.3 tCO2e must be deducted. The dynamic option in Section 2.4.5.1 is available here too – [math: CO_2e_{Counterfactual,i}] (31.3) > [math: CO_2e_{CFStorage,i,50}] (8.0) so 23.3 tCO2e could be accrued as tail issuance.
Construction and demolition timber. In the absence of the Project it would have been landfilled in a temperate wet region, at a site with no landfill gas collection system.
The Project uses the IPCC First Order Decay model. The fraction of the wood carbon that is degradable under landfill conditions is DOCf = 0.1, and the remaining 90% is not degradable and remains indefinitely. The degradable fraction decays at k = 0.03 yr-1. Landfill gas is 50% CH4 by volume, with a cover-soil oxidation factor of 0.1 and CH4 at [math: GWP_{100}] = 27.
Table G.3 – Example 3 Inputs
Term | Value |
[math: CO_2e_{Feedstock,i}] | 1,000 tCO2e |
[math: CO_2e_{CFEmissions,i,(0,15)}] | 180.0 tCO2e ([math: GWP_{100}]-weighted) |
[math: CO_2e_{CFStorage,i,50}] | 922.3 tCO2e |
Calculation (Equation 4):
[math: CO_2e_{Counterfactual,i} = 1000 - min(180.0,1000 - 922.3) = 1000 - 77.7 = 922.3\, tCO_2e]
A deduction of 922.3 tCO2e, or 92.2% of the batch. Only 77.7 tCO2e is eligible – the carbon that would have left the landfill by year 50.
This is the high-[math: GWP] horizon of Section 2.4.4 in operation. Only 9.9 tC would have decayed within 15 years, but roughly half of it would have left as methane, and at [math: GWP_{100}] = 27 that gives a 15-year counterfactual emission of 180.0 tCO2e – more than the feedstock's own carbon content net of what remains stored at year 50. The second limb of the min() therefore binds, and the eligible volume is set by the 50-year storage ceiling rather than by the 15-year release. Note that the result is insensitive to the methane parameters precisely because that limb binds: the answer is governed by how much wood is still in the landfill at year 50, not by how potent the gas was. The Project would make a good Superpollutant Project, but would generate limited removals.
Because [math: CO_2e_{Counterfactual,i}] (922.3) = [math: CO_2e_{CFStorage,i,50}] (922.3), no residual carbon remains and no tail issuance is available under Section 2.4.5.1. Almost all of this batch's carbon would still have been in the ground at year 50, and carbon stored beyond year 50 in the counterfactual is never eligible.
Large-diameter forestry slash from a boreal harvest. In the absence of the Project it would have been left at the harvest site to decay.
The Project uses CBM-CFS3. 8% of the feedstock carbon stabilizes into dead organic matter and soil pools and is still present at year 50; the remainder decays at k = 0.10 yr-1 (half-life 6.9 years).
Table G.4 – Example 4 Inputs
Term | Value |
[math: CO_2e_{Feedstock,i}] | 1,000 tCO2e |
[math: CO_2e_{CFEmissions,i,(0,15)}] | 714.7 tCO2e |
[math: CO_2e_{CFStorage,i,50}] | 86.2 tCO2e |
(released between years 15 and 50) | 199.1 tCO2e |
Step 1: upfront issuance (Equation 4):
[math: CO_2e_{Counterfactual, i}\ = \ Livestock_1000\ - \ min(714.7, 1000 - 86.2)\ = \ 1000\ - \ 714.7\ = \ 285.3] tCO2e
714.7 tCO2e is eligible on utilization. Because [math: CO_2e_{OutputCounterfactual,i}] (285.3) > [math: CO_2e_{CFStorage,i,50}] (86.2), the feedstock acted as a counterfactual carbon sink and the Project Proponent may elect to issue the difference dynamically.
Step 2: the residual available as tail issuance:
[math: CO_2e_{Counterfactual,i}\ - \ CO_2e_{CFStorage, i, 50}\ = \ 285.3\ - 86.2\ = \ 199.1]
This is the carbon that would have been released between year 15 and year 50 in the counterfactual. It is the cap in Equation 6: the tail can never accrue more than this, and the 86.2 tCO2e that would still have been stored at year 50 is never eligible.
Step 3: tail issuance by Reporting Period (Equation 6):
With annual Reporting Periods, [math: \Delta t = 1] and [math: T_n = min(15 + n, 50)]. No tail accrues at [math: n = 0]. Each subsequent period issues the counterfactual emissions that would have occurred between [math: T_{n - 1}] and [math: T_n]:
Table G.5 – Example 4 Tail Issuance by Reporting Period (Selected Reporting Periods Shown)
n | [math: T_n] | Cumulative[math: CO_2e_{CFEmissions,i,\left( 15,T_n \right)}] | [math: CO_2e_{Tail,i,n}] |
0 | 15 | 0 | |
1 | 16 | 19.5 | 19.5 |
2 | 17 | 37.2 | 17.7 |
3 | 18 | 53.2 | 16.0 |
4 | 19 | 67.7 | 14.5 |
5 | 20 | 80.8 | 13.1 |
10 | 25 | 129.8 | 7.9 |
15 | 30 | 159.5 | 4.8 |
35 | 50 | 199.1 | 0.7 |
714.7 tCO2e upfront, then a declining annual tail summing to 199.1 tCO2e, of which 159.5 tCO2e (80%) is issued within the first 15 Reporting Periods and the remaining 39.6 tCO2e in progressively smaller slices up to Reporting Period 35, for a lifetime total of 913.8 tCO2e – 91.4% of the batch. The remaining 86.2 tCO2e is never issued.
The tail tracks the counterfactual decay curve: one Reporting Period after utilization the Project accrues the slice the counterfactual would have released between years 15 and 16, and the slices shrink as the counterfactual curve flattens. With a half-life of 6.9 years, about 80% of the tail (159.5 of 199.1 tCO2e) is issued within the first 15 Reporting Periods; the slices after year 30 are small but are still issued under Equation 6 until the 50-year horizon. Under Equation 7 the issuance in any Reporting Period is the sum of the tail slices due on every batch used in an earlier period, so a Project utilizing this feedstock continuously accumulates overlapping tails.
These factors are used to quantify ILUC emissions for a displaced commodity that CORSIA models directly, or for a CORSIA-modeled substitute listed in Appendix I. For any other displaced commodity, use the [math: IS - NL] approach in Section 3.5.5 with the defaults in Appendix J.
These are to be used under PILUC1 (Section 3.5.3) and applied in Equation 10 (Section 3.5.1).
[math: EF_{ILUC,c}] is expressed in tCO2e per dry tonne of commodity (Equations 25 and 26). The units of each source column are given in its column heading.
Appendix H lists the CORSIA default indirect land-use-change (ILUC) factors used to quantify [math: CO_2e_{Leakage}] for CORSIA-modeled displaced commodities. The values are taken directly from Table 129 of the CORSIA Supporting Document – CORSIA Eligible Fuels – Life Cycle Assessment Methodology, Version 810, which reports ILUC per tonne of feedstock (kgCO2e/t). Two adjustments are made: (i) the values are rescaled from CORSIA's 25-year amortization to Isometric's 15-year basis by × 25/15; and (ii) for oilseed pathways, which CORSIA reports per tonne of vegetable oil, the factor is applied on an oil-equivalent basis (Appendix H.3). The factors are applied to the displaced pre-project commodity tonnage established under Pre-Project Productivity (Section 3.5.2).
The conversion is applied in the following manner:
[math: EF_{fuel-attributed}\ \cdotleft( tCO_2e/dry\Livestock_ntonne \right) = ILUC_c\ \left( kgCO_2e/tonne\ feedstock \right) \cdot \dfrac{25}{15}\ \div 1000]
(Equation 925)
Where:
The initial, pre-converted values presented in the ILUC, CORSIA 25-year basis (kgCO2e/t feedstock) column are directly from Table 129 of the manureCORSIA sourceSupporting Document – CORSIA Eligible Fuels – Life Cycle Assessment Methodology, Version 810.
Table H.1 – CORSIA ILUC Values in Feedstock-Tonnage Terms (CORSIA 25-Year and Isometric 15-Year Amortization Basis)
Commodity | Region | Pathway | ILUC, CORSIA 25-year basis (kgCO2e/t feedstock) | Fuel-attributed (15-yr) (tCO2e/t feedstock) | Whole-crop, economic (15-yr) (tCO2e/t feedstock) |
Corn grain | USA | ATJ (ethanol) | 163.4 | 0.27 | 0.37 |
Corn grain | Global | ATJ (ethanol) | 227.2 | 0.38 | 0.52 |
Sugarcane | Brazil | ATJ (ethanol) | 14.9 | 0.02 | 0.03 |
Sugarcane | Global | ATJ (ethanol) | 14.5 | 0.02 | 0.03 |
Sugar beet | EU | SIP | 46.8 | 0.08 | 0.09 |
Sugar beet | Global | SIP | 26.1 | 0.04 | 0.05 |
Soybean oil | USA | HEFA | 925.6 | 1.54 | 4.60 |
Soybean oil | Brazil | HEFA | 1,020.0 | 1.70 | 5.07 |
Soybean oil | Global | HEFA | 974.7 | 1.62 | 4.84 |
Rapeseed / canola oil | EU | HEFA | 917.9 | 1.53 | 2.10 |
Rapeseed / canola oil | Global | HEFA | 990.3 | 1.65 | 2.26 |
Palm oil (CPO) | Malaysia/Indonesia | HEFA | 1,477.1 | 2.46 | 2.76 |
Crop-level ILUC per tonne of crop is not published, so the co-product gross-up below is how the whole-crop value is approximated. CORSIA values are net of the co-product credit the consequential models embed (the portion used for the fuel is only part of the crop). To represent diverting a whole crop, the fuel-attributed value is grossed up to a whole-crop basis. The adopted basis is economic allocation (gross up by 1 ÷ fuel's economic value share).
We acknowledge that grossing up the values based on allocation is imperfect, and mixes two fundamentally different accounting approaches – a consequential approach and a co-product allocation-based approach used for attributional analysis. There are also several other allocation approaches that could technically be used in place of economic (also known as market) allocation. Mass allocation, based on the relative mass shares of products, is another possible approach; however, this approach is distortionary, notably for vegetable oil feedstocks in which the higher-value oil component used for fuel is a small share of the mass of the overall feedstock (19% for soybeans). Grossing up based on mass allocation would lead to a substantial inflation of the modeled impacts. Energy allocation is another approach, in which impacts are allocated across products based on relative energy contents. However, this is only appropriate in cases where all products are energy products, so it is not advisable here.
Several sources have been used to derive the economic allocation shares to adjust the CORSIA values. We prioritize sources that provide a single allocation value for a specific pathway, as well as sources that provide values across many pathways, when available. Although we acknowledge that in any specific location or facility, the economic share of oil relative to other co-products may vary considerably, these values are intended to capture a broad global aggregate value, which is most analogous to the value fractions that underlie the CORSIA method. For corn grain, we use values generated by the Center for Agriculture and Rural Development at Iowa State University. For sugarcane, we rely on Macedo, Seabra & Silva (2008). Economic value shares for oilseed crushing are taken from Agri-footprint (v7), a widely used agri-food life cycle inventory database maintained by Blonk Sustainability. In cases where both EU and non-EU values are reported in the Agri-footprint report, we rely on the non-EU values. Sugar beet values come from the Klenk et al. (2012) report cited within the Agri-footprint report.
[math:Manure_EF_{Demandwhole - crop} = \dfrac{EF_{fuel - attributed}}{fuel\=product's\Crop_{Area}economic\\cdotvalue\Crop_{Reqshare}]
(Equation 1026)
Where:
In Table H.2, GU is the co-product gross-up factor applied to each commodity, equal to 1 ÷ the fuel product's economic value share (Equation 26). The whole-crop column is the resulting [math: EF_{ILUC,c}], equal to the fuel-attributed value in Table H.1 multiplied by GU.
Table H.2 – Co-Product Gross-Up Factors
Commodity | Region | Gross-up factor (GU), economic allocation | Whole-crop, economic (15-yr) (tCO2e/t feedstock) |
Corn grain | USA | × 1.37 | 0.37 |
Corn grain | Global | × 1.37 | 0.52 |
Sugarcane | Brazil | × 1.08 | 0.03 |
Sugarcane | Global | × 1.08 | 0.03 |
Sugar beet | EU | × 1.20 | 0.09 |
Sugar beet | Global | × 1.20 | 0.05 |
Soybean oil | USA | × 2.98 | 4.60 |
Soybean oil | Brazil | × 2.98 | 5.07 |
Soybean oil | Global | × 2.98 | 4.84 |
Rapeseed / canola oil | EU | × 1.37 | 2.10 |
Rapeseed / canola oil | Global | × 1.37 | 2.26 |
Palm oil (CPO) | Malaysia/Indonesia | × 1.12 | 2.76 |
For the oilseed rows of anTable acreH.1 (soybean oil, rapeseed/canola oil and palm oil (CPO)), [math: EF_{ILUC, c}] is expressed per tonne of croplandvegetable oil. ThisWhere limitingthe nutrientdisplaced couldcommodity is recorded as the whole oilseed or fruit (e.g., soybeans, rapeseed or oil palm fresh fruit bunches), [math: PPP_c] must be nitrogenconverted to oil-equivalent tonnes before Equation 10 is applied, phosphorusby multiplying [math: PPP_c] by the oil-equivalent factor [math: OE_c] (tonnes of oil per tonne of commodity, on the same moisture basis as [math: PPP_c]). [math: OE_c] must be taken from the same source as the economic value shares in H.2 (Agri-footprint v7), or potassiumfrom a published oil extraction rate for the commodity and region with justification. AsWhere nutrientthe requirementsdisplaced varycommodity acrossis cropsrecorded as oil, [math: OE_c = 1]. The same conversion applies to the oilseed substitutes in Appendix I.
This list must be used where a displaced crop is not modeled by CORSIA but shares the product class, market and co-product structure of a CORSIA-modeled crop. The analog's Appendix H value is used, with the whole-crop gross-up still applied (Section 3.5.3). Use the Table H.1 row for the matching region where listed; otherwise use the Global row.
This section is for use under PILUC1 (Section 3.5.3) and applied in Equation 10 (Section 3.5.1).
The matching basis column states the unit conversion from the displaced commodity to its analog, for example dry tonne 1:1.
Table I.1 – CORSIA Modeled-Crop Substitutes
Displaced commodity (not modeled) | CORSIA analog | Basis for the match | Matching basis |
Wheat | Corn grain | Temperate cereal; shares the feed/food and starch-ethanol markets | Dry tonne, 1:1 |
Barley | Corn grain | Temperate feed grain | Dry tonne, 1:1 |
Grain sorghum | Corn grain | Feed and ethanol grain; near-direct substitute for corn | Dry tonne, 1:1 |
Oats, rye, triticale | Corn grain | Minor temperate feed grains | Dry tonne, 1:1 |
Sweet sorghum | Sugarcane | Sugar / ethanol feedstock | Dry tonne, 1:1 |
Sunflower seed | Rapeseed / canola oil | Temperate oilseed; oil-plus-meal co-product structure | Oil-equivalent (Appendix H.3) |
Safflower, camelina | Rapeseed / canola oil | Temperate oilseeds | Oil-equivalent (Appendix H.3) |
Cottonseed | Soybean oil | Oilseed with a meal-dominant value split | Oil-equivalent (Appendix H.3) |
Groundnut (peanut) | Rapeseed / canola oil | Oilseed with high oil content and oil-dominant value split | Oil-equivalent (Appendix H.3) |
Coconut, declared as copra | Palm oil (CPO) | Tropical perennial oil crop; tropical-oil market | Oil-equivalent (Appendix H.3), OE = 0.63 |
Coconut, declared as coconut oil | Palm oil (CPO) | Tropical perennial oil crop; tropical-oil market | Oil-equivalent (Appendix H.3), OE = 1 |
Other tropical vegetable oils (declared as oil; e.g., palm kernel oil, babassu) | Palm oil (CPO) | Tropical vegetable-oil market; near-fungible at the refined level, with palm the marginal supplier | Oil-equivalent (Appendix H.3), OE = 1 |
These defaults must be used for IS and NL where the displaced commodity is neither CORSIA-modeled nor a listed substitute in Table I.1 and the Project Proponentsfalls must either computein a acreage-weightedregion averagestudied here. Alternative values require Isometric approval.
This section is for use under PILUC1 through the [math: Crop_{Req}IS]-[math: NL] valueapproach (Section 3.5.5). [math: IS] is calculated in Equation 16, and [math: IS] and [math: NL] are used in Equation 15.
Elasticities are dimensionless; [math: IS] and [math: NL] are proportions. All are tabulated as decimals.
Isometric carried out a literature review of [math: \varepsilon_s] and [math: \varepsilon_d] values to inform [math: IS], as well as values for [math: NL] for certain regions. This is because understanding which values to use from literature is challenging, as academic papers are typically not written with this purpose or audience in mind. Isometric has completed this work for certain regions to lessen this complexity and provide consistency across allprojects. majorThese cropsdefault values also serve as an example of appropriate values to select, though the quality of research differs across regions.
The regions considered in the regionliterature orreview usewere Brazil, Panama, Mexico, and the valueUnited relevantStates, selected following a review of projected project demand. Isometric will update this analysis with additional regions iteratively based on demand; values for theother the Primary Crop in the region. The Primary Crop is defined as the crop with the highest average annual devoted acreage within the 15-mile radius circle.
If a Project Proponent can demonstrate that all produced manure can be accounted for using a manure management plan or a signed affidavit from the feedstock supplier, the equation can be simplified to:
[math: Manure_{SUR}\ =\ Manure_{Gross}\ -\ Observed_{Counterfactual}]
(Equation 11)
Where:
The following list is to be used as guidance for which industry residues are considered by Isometric to have a sufficiently low risk of market leakage to be eligible to use the Sustainability Criteria outlined in SC5. This list, while not exhaustive, is aimed to highlight appropriate industry residues that are likely to be deemed eligible within this Module. Additional feedstocksregions will be consideredreviewed on a case-by-case basis.
[math: | |||||
|---|---|---|---|---|---|
The following procedure must be followed:
|
Geography | Crop | [math: | [math: \varepsilon_{s | [math: IS] | Key citation |
Global | Calories | −0.05 | 0.12 | 0.71 | Roberts and Schlenker (2013) |
Global | Coffee | −0.305 | 0.285 | 0.48 | Akiyama |
Global | Cocoa | −0.075 | 0.075 | 0.50 | Askari |
South | Livestock | −0.40 | 0.40 | 0.50 | Fragoso |
North America | Livestock | −0.40 | 1.60 | 0.80 | Mintert |
Ideally etcthere would be estimates of the specific types of land use converted and their locations, but this data is not available. Instead the Project Proponent should focus on the most important elements of potential land-use change from a carbon-emissions perspective. The [math: NL] values proposed aim to capture the net effect of a one-unit removal of crop area on forestland conversion and they are smaller in magnitude than [math: NL] values that would incorporate conversion of grazing land or of lower-value crops to higher-value crops. Focusing on forests is more tractable and likely provides a large share of the relevant land-use-change emissions, since forest conversion is relatively permanent in a way that livestock-to-cropland conversion is not. In general the [math: NL] values are more speculative than the [math: IS] values and often rely on assumptions about the yield-price elasticity that have not been empirically confirmed.
There are two methods.
[math: NL = \dfrac{{Gross\ new\ production}_x}{{Gross\ new\ production}_x + \ \delta\,Yield_x\ \cdot \ Area_{Total}}]
(Equation 27)
Where:
which reformulates as:
[math: NL = \dfrac{\Delta\,Area_x}{\Delta\,Area_x + \Delta\,Yield_x}]
(Equation 28)
Where:
The following defaults were gathered using Method B.
Table J.2 – NL Default Values
Geography | Crop | [math: NL] | Key citation |
Brazil | Cropland | 0.61 | Pendrill et al. (2019) |
US | Cropland | 0.28 | Lark et al. (2022) |
Mexico | Cropland | N/A | Can use Brazil value |
Panama | Cropland | N/A | Can use Brazil value |
Brazil | Livestock | 0.83 | Bowman (2012) |
US | Livestock | 0.20 | Wu (2000) |
Mexico | Livestock | N/A | Can use Brazil value |
Panama | Livestock | N/A | Can use Brazil value |
Global | Coffee | 0.60 | Report: "60% of land suitable for coffee is forested" |
Global | Other specialty crops | N/A | See: global coffee value |
This appendix is an index for navigation. It does not add requirements. Where an entry differs from the text of the relevant section, the section applies. Equation and table numbers are fixed in the text and must be checked if equations or tables are added or removed.
Table K.1 Example– Equation Index
Equation | Section | Purpose | Applies to |
1 |
| Minimum number of suppliers to assess under a sampling approach | Feedstocks evidenced by sampling |
2 | 1.6.1 | Biogenic carbon in a feedstock delivery entering storage | Feedstocks not compliant with FS1 |
3 | 1.6.1 | Storage methane emissions deducted from gross removals | Feedstocks not compliant with FS1 |
4 | 2.4.5 | Counterfactual storage for a feedstock batch | Residues under CS1 |
5 | 2.4.5 | Counterfactual storage aggregated over a Reporting Period | Residues under CS1 |
6 | 2.4.5.1 | Residual tail issuance for a feedstock batch at a timestep | Residues electing dynamic issuance |
7 | 2.4.5.1 | Total tail issuance in a Reporting Period | Residues electing dynamic issuance |
8 | 2.5.2 | Market leakage emissions per feedstock batch, and aggregated across feedstock batches | Residues under ML1 |
9 | 3.3.2.1 | Direct land-use change emissions | Purpose-Grown Feedstocks under PDLUC1 |
10 | 3.5.1 | Total ILUC emissions from displaced commodities | PILUC1 |
11 | 3.5.2.2 | Project-scenario | Purpose-Grown Feedstocks, Case B |
12 | 3.5.2.2 | Productivity shortfall against the pre-project baseline | Purpose-Grown Feedstocks, Case B |
13 | 3.5.2.2 | Shortfall as a share of expected production (de minimis test) | Purpose-Grown Feedstocks, Case B |
14 | 3.5.5 | ILUC emissions from induced land conversion (IS-NL approach) | Displaced commodities not modeled by CORSIA |
15 | 3.5.5 | Induced land conversion to bring new land into production | Displaced commodities not modeled by CORSIA |
16 | 3.5.5 | Increased Supply (proportion of forgone production replaced elsewhere) | Displaced commodities not modeled by CORSIA |
17 | 4.3.2.1 | Regrowth fractions at 15 and 30 years | Standing stock under SDLUC1 |
18 | 4.3.2.1 | Land-use change emissions for a harvested stand | Standing stock under SDLUC1 |
19 | 4.3.2.1 | Refund of land-use change emissions for outperforming regrowth | Standing stock under SDLUC1 and SDLUC2 |
20 | 4.3.2.2 | Land-use change emissions for an | Standing stock under SDLUC2 |
21 | D.1.2 | Sustainable Usage Rate of | Manure |
22 | D.1.2 | Gross manure production of a supplier | Manure under competing-demand SUR |
23 | D.1.2 | Manure demand for crop nutrient replenishment | Manure under competing-demand SUR |
24 | F.1 | Minimum number of carbon stock sampling locations | PDLUC1 and SDLUC measurement |
25 | H.1 | Fuel-attributed ILUC factor per bone-dry tonne of commodity, rescaled from CORSIA values | CORSIA-modeled displaced commodities |
26 | H.2 | Whole-crop gross-up of the fuel-attributed ILUC value | CORSIA-modeled displaced commodities |
27 | J | New Land (NL) from gross new production, Method B | IS-NL approach |
28 | J | New Land (NL) from changes in area and yield, Method B | IS-NL approach |
Table K.2 – Symbol Index
Symbol | Definition | Unit | Equations |
| Number of suppliers or lots that must be assessed | Number | 1 |
[math: i] | Index of feedstock delivery (Equations 2–3), feedstock batch (Equations 4–8) or stand/treatment area (Equations 17–20) | Index | 2–8, 17–20 |
[math: N_S] | Total number of suppliers or lots of the feedstock | Number | 1 |
[math: D] | Detection threshold multiplied by NS (set at 10%, so D = 0.1 | Number | 1 |
[math: | Confidence | Unitless | 1 |
[math: | Biogenic | tCO2e | 2, 3 |
[math: FeedstockMass_i] | Mass of feedstock delivery i | Bone-dry tonnes | 2 |
[math: CarbonFraction_i] | Carbon in the feedstock as a mass fraction (ISO 16948:2015 or conservative value) | Fraction | 2 |
[math: CO_2e_{BioStorage,RP}] | Storage emissions deducted from gross removals in the Reporting Period | tCO2e | 3 |
[math: GWP_{CH_4}] | Global warming potential of biogenic | Unitless | 3 |
[math: StorageMonths_i] | Time delivery i was stored, rounded up | Months | 3 |
[math: N_D] | Number of
| Number | 3 |
[math: CO_2e_{Feedstock,i} | Total |
| 4 |
[math: CO_2e_{ | GHG | tCO2e | 4 |
[math: CO_2e_{ | Biogenic | tCO2e | 4, |
| Initially |
| 4, |
| Biogenic | tCO2e | 5 |
[math: | Number | Number | 5, 8 |
| Residual |
| 6, 7 |
[math: CO_2e_{ | Total | tCO2e | 7 |
[math: | Reporting
| Unitless | 6, |
| Reporting Period in which feedstock batch i was utilized | Unitless | 6, 7 |
[math: \Delta t] | Reporting Period timestep size | Years | 6 |
[math: T_n] | Residual tail assessment endpoint, [math: T_n = min(15 + n\,\Delta | Years | 6 |
[math: | Number of Reporting Periods since feedstock batch i was utilized ([math: n = |
| 6 |
[math: CO_2e_{ | GHG | tCO2e
| 6 |
| Total |
| 10 |
[math: CO_2e_{ | Market | tCO2e | 8 |
[math: CO_2e_{ | Total |
| 8 |
[math: CO_2e_{ | Emissions | tCO2e | 9 |
[math: CarbonStock_{CF}] | Carbon stock per hectare of the counterfactual land-use category | tC/ha | 9 |
[math: CarbonStock_{Proj}] | Carbon stock per hectare of the Project land-use category | tC/ha | 9 |
[math: Area] | Area converted from the historical to the Project land use | ha | 9 |
[math: CO_2e_{ | ILUC emissions for displaced commodity c (IS-NL approach) | tCO2e | 10, 14 |
[math: ha_{LC,c}] | Induced land conversion to bring new land into production | ha | 14, 15 |
[math: EF_{CarbonStock}] | Carbon stock factor for forested lands | tCO2e/ha | 14 |
[math: PPP_c] | Pre-Project Productivity of displaced commodity c (oil-equivalent tonnes for oilseeds) | Bone-dry tonnes/year | 10, 15 |
[math: C_{CORSIA}] | Set of displaced commodities assessed under the CORSIA-based approach | Set | 10 |
[math: C_{IS-NL}] | Set of displaced commodities assessed under the IS-NL approach | Set | 10 |
[math: IS_c] | Increased Supply: share of forgone production replaced by increased supply elsewhere | Fraction | 15, 16 |
[math: NL_c] | New Land: share of increased supply that brings new land into production | Fraction | 15, 27, 28 |
[math: Y_{NL,c}] | Yield on new land brought into production for commodity c | Bone-dry tonnes/ha/year | 15 |
[math: \varepsilon_{s,c}] | Elasticity of supply of commodity c | Unitless | 16 |
[math: \varepsilon_{d,c}] | Elasticity of demand of commodity c | Unitless | 16 |
[math: c] | Each commodity displaced on the feedstock land, as established in the Land Use Declaration | Index | 10–16 |
[math: EF_{ILUC,c}] | Indirect land-use-change factor for commodity c (Appendix H) | tCO2e/dry tonne | 10, 26 |
[math: PSP_{c,f,RP}] | Project-scenario productivity of the primary commodity in the Reporting Period | Bone-dry tonnes/ha/year | 11, 12 |
[math: {\underline{Y}}_{Regional,c}] | Mean regional yield of commodity c over the baseline period used to determine [math: PPP_{c,f}] | Bone-dry tonnes/ha/year | 11 |
[math: Y_{f,c,s}] | Realized yield of commodity c on field f in year s | Bone-dry tonnes/ha/year | 11 |
[math: Y_{Regional,c,s}] | Mean regional yield of commodity c in year s | Bone-dry tonnes/ha/year | 11 |
[math: s] | Each year, or harvest season, within the Reporting Period | Index | 11 |
[math: f] | Field in the feedstock submission growing primary commodity c under the intermediate-crop system | Index | 11–13 |
[math: \Delta P_{c,f,RP}] | Productivity shortfall of commodity c on field f | Bone-dry tonnes/ha/year | 12, 13 |
[math: PPP_{c,f}] | Regionally indexed Pre-Project Productivity of commodity c on field f | Bone-dry tonnes/ha/year | 11–13 |
[math: EP_{c,RP}] | Expected production of commodity c in the Reporting Period | Bone-dry tonnes/year | 13 |
[math: SR_{c,RP}] | Shortfall ratio: productivity shortfall of commodity c as a proportion of its expected production | Fraction | 13 |
[math: A_{c,f,RP}] | Area of field f under the intermediate-crop system on which commodity c is grown in the Reporting Period | ha | 13 |
[math: {\Delta P}_{c,RP}] | Total productivity shortfall of commodity c across all fields in the Reporting Period | Bone-dry tonnes/year | 13 |
[math: CStock_{CF,i,t}] | Counterfactual carbon stock of treatment area or stand i at year t | tC | 18, 19, 20 |
[math: CStock_{Proj,i,15}] | Carbon stock of an SDLUC2 treatment area in the Project land-use state (two-pool test) | tC | 20 |
[math: CStock_{Regrowth,i,t}] | Modeled carbon stock of stand i at year t after harvest | tC | 17, 18 |
[math: HarvestedStock_i] | Carbon stock removed from treatment area or stand i | tC | 17 |
[math: RegrowthFraction_{15,i}] | Modeled fraction of the harvested stock regenerated by year 15 | Fraction | 17 |
[math: RegrowthFraction_{30,i}] | Modeled fraction of the harvested stock regenerated by year 30 | Fraction | 17 |
[math: CO_2e_{ | Land-use change emissions debited for treatment area or stand i | tCO2e | 18, 19, 20 |
[math: CO_2e_{dLUC,Refund,i,t_v}] | Refund for stand or treatment area i at validation year [math: t_v], capped at the original debit | tCO2e | 19 |
[math: CStock_{Actual,i,t_v}] | Field-measured carbon stock of stand i at year [math: t_v] | tC | 19 |
[math: t] | Years since harvest (t = 0 immediately after harvest) | Years | 17–20 |
[math: t_v] | Year after harvest at which actual regrowth is validated against the modeled trajectory for a refund | Years | 19 |
[math: Manure_{SUR}] | Sustainable Usage Rate of manure obtainable from a supplier | Tonnes/year | 21 |
[math: Manure_{Gross}] | Average annual manure mass produced by the supplier | Tonnes/year | 21, 22 |
[math: Manure_{Demand}] | Maximum annual manure mass required for nutrient replenishment of the cropland within the manure deployment area | Tonnes/year | 21, 23 |
[math: Livestock_{Output}] | Average manure mass generated by an animal per year | Tonnes/year | 22 |
[math: Livestock_n] | Livestock headcount at the manure source | Number | 22 |
[math: Crop_{Area}] | Total cropland area within the manure deployment area | ha | 23 |
[math: Crop_{Req}] | Maximum annual manure mass required to replenish the limiting nutrient of a hectare of cropland | Tonnes/ha/year | 23 |
[math: n_{loc}] | Minimum number of sampling locations per pool and stratum | Number | 24 |
[math: t_{crit}] | t-statistic for a 90% confidence level | Unitless | 24 |
[math: CV] | Coefficient of variation of the measured variable within the stratum | Unitless | 24 |
[math: E] | Target margin of error (10% of the stratum mean unless tighter precision is justified) | Fraction | 24 |
[math: EF_{whole - crop}] | Whole-crop ILUC factor after gross-up for co-product economic value share | tCO2e/dry tonne | 10, 26 |
[math: ILUC_c] | CORSIA default ILUC value for commodity c, region and pathway on a 25-year basis | kgCO2e/t feedstock | 25 |
[math: GU] | Co-product gross-up factor, equal to 1 ÷ the fuel product's economic value share | Unitless | 26 |
[math: EF_{fuel - attributed}] | Fuel-attributed ILUC factor on the 15-year basis, converted from CORSIA values | tCO2e/dry tonne | 25, 26 |
[math: fuel\ | Share of the crop's total economic value attributable to the product used for fuel | Fraction | 26 |
[math: OE_c] | Oil-equivalent factor: tonnes of oil per tonne of displaced oilseed or oil-fruit commodity | Fraction | 10 |
[math: {Gross\ new\ production}_x] | Production from newly converted agricultural land only, resulting from x | Tonnes | 27 |
[math: {\delta Yield}_x] | Absolute change in average yield resulting from x | Tonnes/ha | 27 |
[math: Area_{Total}] | Total agricultural land area before the change | ha | 27 |
[math: x] | A 1-tonne reduction in supply, or a 1-unit price increase | Index | 27, 28 |
[math: {\Delta Area}_x] | Proportional change in agricultural land area resulting from x | Fraction | 28 |
[math: {\Delta Yield}_x] | Proportional change in average yield resulting from x | Fraction | 28 |
MassDiv | Mass of feedstock batch i diverted from a counterfactual use (or sourced above SUR, BFGR or BFCR) | Bone-dry tonnes | 8 |
r | Index of replacement product | Index | 8 |
Convr | Conversion factor: quantity of replacement product r delivering the function of one bone-dry tonne of diverted feedstock | Units of r per bone-dry tonne | 8 |
DFr, | Displacement factor: share of the forgone function backfilled by replacement product r | Fraction | 8 |
EFr,i | Emission factor for production and supply of replacement product r | tCO2e per unit of r | 8 |
CO2eAdd,i | Additional emissions from using the replacement product not covered by EFr, | tCO2e | 8 |
Table K.3 – Table Index
Table | Title | Section |
1 | Feedstock Pathway Summary | Section 1.3 |
2 | Feedstock Characterization Criteria | Section 1.5 |
3 | Feedstock Storage Criteria | Section 1.6 |
4 | Cascading Use Criteria | Section 2.2 |
5 | Residue Sustainability Criteria by Feedstock Type | Section 2.3 |
6 | Forestry & Plantation Wood Residue Sustainability Criteria (SC1) | Section 2.3.1 |
7 | Crop Residue Sustainability Criteria (SC2) | Section 2.3.2 |
8 | Manure Sustainability Criteria (SC3) | Section 2.3.3 |
9 | Controlled Waste Sustainability Criteria (SC4) | Section 2.3.4 |
10 | Industrial & Commercial Residue Sustainability Criteria (SC5) | Section 2.3.5 |
11 | Biofuel CO2 Byproduct Stream Sustainability Criteria (SC6) | Section 2.3.6 |
12 | Conservation and Management Residue Sustainability Criteria (SC7) | Section 2.3.7 |
13 | Counterfactual Fate Criteria | Section 2.4.1 |
14 | Counterfactual Storage Criteria | Section 2.4.2 |
15 | Recommended Model Frameworks | Section 2.4.6 |
16 | Market Leakage Criteria | Section 2.5.1 |
17 | Purpose-Grown Sustainability Criteria | Section 3.2.1 |
18 | Purpose-Grown Land Use Declaration Criteria | Section 3.3.1 |
19 | Purpose-Grown Direct Land-Use Change Criteria | Section 3.3.2 |
20 | Purpose-Grown Indirect Land-Use Change Criteria | Section 3.5 |
21 | ILUC Quantification Requirements Summary | Section 3.5.6 |
22 | Standing Stock Sustainability Criteria 1 (Woody) | Section 4.2.1 |
23 | Standing Stock Sustainability Criteria 2 (Non-Woody) | Section 4.2.2 |
24 | Standing Stock Land Use Declaration Criteria | Section 4.3.1 |
25 | Standing Stock Direct Land-Use Change Criteria | Section 4.3.2 |
A.1 | Monitoring Requirements | |
C.1 | Pre-approved Forestry Sustainability Frameworks | |
E.1 | Operating-History Criteria | |
E.2 | Financial-Model | |
E.3 | Wildfire Mitigation Criteria | |
E.4 | Environmental Assessment Criteria | |
G.1 | Example 1 Inputs | |
G.2 | Example 2 Inputs | |
G.3 | Example 3 Inputs | |
G.4 | Example 4 Inputs | |
G.5 | Example 4 Tail Issuance by Reporting Period (Selected Reporting Periods Shown) | |
H.1 | CORSIA ILUC Values in Feedstock- | |
H.2 | Co-Product Gross-Up Factors | |
I.1 | CORSIA Modeled-Crop Substitutes | |
J.1 | IS Default Values | |
J.2 | NL Default Values | |
K.1 | Equation Index | |
K.2 | Symbol Index |
Such0.0013 as slash material, defined in 40 CFR 80.1401 as "A residue, including treetops, branches and bark, left onis the groundconservative afterfactor loggingfor ormonthly accumulatingfractional as a resultloss of abiomass stormcarbon from storage, fireestablished by Commission Delegated Regulation (EU) 2026/285 of 3 February 2026, delimbingsupplementing orRegulation other(EU) similar disturbance"2024/3012. ↩
DownstreamA woodrelated processingparty is defineda asperson woodor processingentity that convertsis rawrelated woodto materialthe intoProject productsProponent because one or more of the following applies: The entity directly or indirectly controls, is controlled by, or is under common control with the Project Proponent. Control is the power to direct the management and policies of an entity, whether through ownership, by contract or otherwise; the entity holds 20% or more of the equity or voting rights in the Project Proponent, or the Project Proponent holds 20% or more of the equity or voting rights in the entity, or either is otherwise able to exercise significant influence over the other; the entity has a director or other member of key management personnel in common with the Project Proponent, where that person has authority over the supply or purchase of the feedstock. Key management personnel are persons with authority and responsibility for planning, directing and controlling the activities of the entity; or, the person is a close family member of an individual who controls, has significant influence over, or is key management personnel of the Project Proponent, or the entity is controlled by such an individual or family member. Note that this definition is informed by IAS 24 and ASC 850 but is not intended to replicate either. ↩↩2↩3↩4
An invasive species is typically a non-native organism that harms an ecosystem. However, a native species can also become "invasive" or act invasively when natural controls – such as sawn timberpredators, plywooddisease, furniture or otherspatial goodsbarriers – disappear, allowing it to overpopulate and damage its own native habitat or a new regional ecosystem. ↩
UNFCCC Article 6.4 Supervisory Body, Standard: Requirements for activities involving removals under the Article 6.4 mechanism, A6.4-STAN-METH-002, version 01.0, adopted 9 October 2024, Section 4.4, paragraph 30(a). Paragraph 30(c) defines net removals as the net change in greenhouse gas storage less the net change in emissions, leakage and any crediting deficit. ↩
The sourcingaridity regionindex is definedcalculated as aaverage regionannual ofprecipitation similar ecological characteristics, such as biodiversity, as defineddivided by relevantaverage regionalannual authoritiespotential (Carbonevapotranspiration. DirectSuitable 2025)sources for deriving sourcing area aridity index include the CGIAR-CSI Global Aridity Index and Potential Evapotranspiration Database v3 or named equivalent, or local reputable climate datasets. ↩
AGNI primaryper forestcapita, asPPP defined(current international $): a measure of average income per person in a country, adjusted for differences in local cost of living so that it can be fairly compared across countries – published annually by the UNWorld FAOBank for nearly every country. Using this figure, rather than a fixed currency amount, ensures the threshold represents a comparable real-world amount of money regardless of where the supplier is a naturally regenerated forest of native tree species, where there are no clearly visible indication of human activities and the ecological processes are not significantly disturbedbased. For more information visit:https://openknowledge.fao.org/server/api/core/bitstreams/531a9e1b-596d-4b07-b9fd-3103fb4d0e72/content.Resources to demonstrate the sourcing region is not a primary forest:
SuchPrime agricultural land is defined as MSW,agricultural wasteland waterwhich treatmentsupports sludge,production expiredat food50% waste,or hospital/commercialmore waste, biogas fromof the digestionaverage production capacity of wastethe treatmentsurrounding sludgeagricultural andland. municipalProjects woodyusing wastefeedstocks that are grown on agricultural land must provide exceptional evidence demonstrating that the land is considered non-prime agricultural land under this definition. ↩
Recovery,Non-prime transportationagricultural andland replacementis costsagricultural includeland butthat aredoes not limited tomeet the following:
AnClayton, economicL. purposeK., isWyckoff, oneA. providingS., market& recognizedCrotty, economicS. valueM. through(2026). revenueNear-term, generationgeospatial or cost reductionsopportunity for anbiomass operation.carbon Thisstorage couldto includeaddress the salewildfire ofand good(s)climate forcrises. economicScience profitAdvances, or12(35), the use of the feedstock for an environmental service such as soil nutrient enhancement that would otherwise require a costly interventioneaee6185. https://doi.org/10.1126/sciadv.aee6185↩
TheICAO use(2025), CORSIA Supporting Document – CORSIA Eligible Fuels – Life Cycle Assessment Methodology, Version 8, November 2025. ILUC values per tonne of marginal emissions rates would be the most conceptually aligned approach with a consequential emissions accounting framework, however currently available data and methodologies for their calculationfeedstock are notfrom sufficientTable to permit confident real-world usage.129: https://www.icao.int/sites/default/files/environmental-protection/CORSIA/Documents/CORSIA%20Eligible%20Fuels/CORSIA_Supporting_Document_CORSIA-Eligible-Fuels_LCA_Methodology_V8.pdf↩↩2