This Protocol (A document that describes how to quantitatively assess the net amount of CO₂ removed by a process. To Isometric, a Protocol is specific to a Project Proponent's process and comprised of Modules representing the Carbon Fluxes involved in the CDR process. A Protocol measures the full carbon impact of a process against the Baseline of it not occurring.) provides the requirements and procedures for the calculation of net carbon dioxide equivalent (CO2e (The amount of CO₂ emissions that would cause the same integrated radiative forcing or temperature change, over a given time horizon, as an emitted amount of GHG or a mixture of GHGs. One common metric of CO₂e is the 100-year Global Warming Potential.)) removal (The term used to represent the CO₂ taken out of the atmosphere as a result of a CDR process.) from the atmosphere via improvements to soil organic carbon (SOC (Soil Organic Carbon)) stocks. In the context of this Protocol, we define SOC enhancement as the intentional adoption or intensification of land management practices that increase the accumulation of organic carbon within the soil profile, providing additional net carbon storage (Describes the addition of carbon dioxide removed from the atmosphere to a reservoir, which serves as its ultimate destination. This is also referred to as “sequestration”.) against a counterfactual (An assessment of what would have happened in the absence of a particular intervention – i.e., assuming the Baseline scenario.)baseline (A set of data describing pre-intervention or control conditions to be used as a reference scenario for comparison.).
Soils represent the largest terrestrial carbon pool on Earth, storing an estimated 3,000 Pg of organic carbon1. The potential for agricultural soils alone to contribute to climate mitigation is substantial: recent estimates suggest that improved cropland and grassland management could sequester between 0.28 and 0.43 Gt C yr⁻¹ (roughly 1.0 to 1.6 Gt CO2₂e yr⁻¹) globally2, placing SOC enhancement among the most scalable nature-based climate solutions available. In addition to climate mitigation, improvements to SOC can provide a wide range of environmental and social co-benefits, including enhanced soil water retention and drought resilience, improved crop yields and long-term agricultural productivity, reduced fertilizer dependency, support for above- and below-ground biodiversity (The diversity of life across taxonomic and spatial scales. Biodiversity can be measured within species (i.e. genetic diversity and variations in allele frequencies across populations), between species (i.e. the total number and abundance of species within and across defined regions), within ecosystems (i.e. the variation in functional diversity, such as guilds, life-history traits, and food-webs), and between ecosystems (variation in the services of abiotic and biotic communities across large, landscape-level scales) that support ecoregions and biomes.), and mitigation of erosion and nutrient runoff into waterways3,4. Despite these potential benefits, adoption of SOC-enhancing practices is frequently constrained by upfront implementation costs, limited access to agronomic expertise, and the absence of reliable financial incentives for farmers5,6. Carbon finance (Resources provided to projects that are generating, or are expected to generate, greenhouse gas (GHG) Emission Reductions or Removals.) presents a meaningful opportunity to address these barriers, enabling the climate mitigation potential of improved soil management to be realized alongside tangible co-benefits for land managers and local communities.
This Protocol applies to a wide range of land management practices capable of demonstrably increasing SOC stocks within agricultural and grassland systems and other landscapes. This Protocol is process-agnostic, focusing on verified outcomes rather than prescribed methods. Eligible Project (An activity or process or group of activities or processes that alter the condition of a Baseline and leads to Removals or Reductions.)activities (The steps of a Project Proponent’s Removal or Reduction process that result in carbon fluxes. The carbon flux associated with an activity is a component of the Project Proponent’s Protocol.) encompass any practice that results in a net, sustained increase in SOC stocks against a counterfactual baseline.
This Protocol and its eligibility requirements are designed to ensure that all Project activities support the goal of durable climate mitigation and associated co-benefits, while excluding practices that may produce short-term apparent SOC gains without genuine long-term carbon storage.
This Protocol accounts for the quantification of the gross amount of CO2 removed via net increases in SOC stocks, as well as all cradle-to-grave (Considering impacts at each stage of a product's life cycle, from the time natural resources are extracted from the ground and processed through each subsequent stage of manufacturing, transportation, product use, and ultimately, disposal.) life-cycle Greenhouse Gas (GHG (Those gaseous constituents of the atmosphere, both natural and anthropogenic (human-caused), that absorb and emit radiation at specific wavelengths within the spectrum of terrestrial radiation emitted by the Earth’s surface, by the atmosphere itself, and by clouds. This property causes the greenhouse effect, whereby heat is trapped in Earth’s atmosphere (CDR Primer, 2022).)) emissions (The term used to describe greenhouse gas emissions to the atmosphere as a result of Project activities.) associated with project activities (excluding continuation of pre-project activity emissions - see Section 8.1). This Protocol is developed to adhere to the requirements of ISO (A worldwide federation (NGO) of national standards bodies from more than 160 countries, one from each member country.) 14064-2: 2019 – Greenhouse Gases – Part 2: Specification with guidance at the project level for quantification, monitoring, and reporting of greenhouse gas emission reductions or removal enhancements.
The Protocol ensures:
This Protocol and all standardized approaches therein, including but not limited to the baseline, removal quantification, and the treatment of non-permanence risk, are informed by the best available scientific knowledge and have undergone external review by subject matter experts (Someone with extensive knowledge and/or skills in a particular domain as demonstrated by education, training, certifications, and/or experience carrying out closely related work.) and relevant stakeholders (Any person or entity who can potentially affect or be affected by Isometric or an individual Project activity.). All comments received during consultation are publicly addressed, with revisions incorporated as appropriate, to ensure the certified version of the Protocol will yield high-quality Carbon Credits via rigorous, conservative (Purposefully erring on the side of caution under conditions of Uncertainty by choosing input parameter values that will result in a lower net CO₂ Removal or GHG Reduction than if using the median input values. This is done to increase the likelihood that a given Removal or Reduction calculation is an underestimation rather than an overestimation.), and appropriate methodologies.
Throughout this Protocol, the use of "must" indicates a requirement, whereas "should" indicates a recommendation.
This Protocol relies on and is intended to be compliant with the following standards and protocols:
Additional reference standards that inform the requirements and overall practices incorporated in this Protocol include:
Additional principles that were considered in the development of this Protocol and aligned with, where feasible, include:
Protocols and Methodologies that were assessed as part of a literature review during the development of this Protocol include:
This Protocol was developed based on the current state of the art, publicly available science regarding soil organic carbon improvement activities and MRV of improved soil management projects. This Protocol aims to be scientifically stringent and robust. We recognize that some requirements may exceed the status quo in the market and that there are numerous opportunities to improve the rigor of this Protocol. Key future improvements to the Protocol are outlined in Appendix A.
Additionally, this Protocol will be reviewed when there is an update to published scientific literature, government policies, or legal requirements which would affect net CO2e removal quantification or the monitoring guidelines outlined in this Protocol, or at a minimum of every 2 years.
This Protocol aims to guide Projects that enhance soil organic carbon stocks through improved management activities in ways that support sustainable production, ecosystem services, and local livelihoods while remaining resilient to future climate scenarios. Projects must maintain or enhance ecological integrity (The ability of an ecosystem to support and maintain ecological processes and a diverse community of organisms. It is measured as the degree to which a diverse community of native organisms is maintained, and is used as a proxy for ecological resilience, intended as the capacity of an ecosystem to adapt in the face of stressors, while maintaining the functions of interest.). Where project interventions are implemented within working lands, The Project must support sustainable production within the landscape.
[/R-Z8ZD-0]This Protocol aims to guide Projects that enhance soil organic carbon stocks through improved management activities in ways that support sustainable production, ecosystem services, and local livelihoods while remaining resilient to future climate scenarios. Projects must maintain or enhance ecological integrity (The ability of an ecosystem to support and maintain ecological processes and a diverse community of organisms. It is measured as the degree to which a diverse community of native organisms is maintained, and is used as a proxy for ecological resilience, intended as the capacity of an ecosystem to adapt in the face of stressors, while maintaining the functions of interest.). Where project interventions are implemented within working lands, The Project must support sustainable production within the landscape.
[/G-G36D-0]Project Proponents (The organization that develops and/or has overall legal ownership or control of a Removal or Reduction Project.) must provide a comprehensive description of all project activities and interventions to be implemented within the project boundary, and demonstrate, with reference to peer-reviewed scientific literature, the causal mechanism by which each intervention is expected to result in a net increase in soil organic carbon stocks.
[/R-JXV2-0]This Protocol sets forth universal requirements for all Improved Soil Management Projects. All Projects are also subject to additional requirements tailored to the implementation practice(s) and setting of the Project Proponent’s soil management activities,
Project Proponents must select one or more of the following improved soil management intervention Modules (Independent components of Isometric Certified Protocols which are transferable between and applicable to different Protocols.), and must demonstrate their reasoning for and capability to carry out the selected implementation practice(s) in the Project Design Document (PDD). (The document that clearly outlines how a Project will generate rigorously quantifiable Additional high-quality Removals or Reductions.)
[/G-X5AW-0]The Cropland Management Module covers projects which enhance soil organic carbon through the improved management of cropland systems.
Project activities must not involve the conversion of native ecosystems, wetlands, or other high-conservation-value land to other uses. Project interventions also must not generate short-term apparent SOC gains at the expense of long-term soil health or biodiversity.
[/R-6JPQ-0]Any inputs used within the project area, including biostimulants, biological inoculants, compost, or other amendments, must be applied in compliance with local regulation and disclosed to Isometric. Their associated life-cycle GHG emissions must be accounted for within the project boundary.
[/R-T7JC-0]The geographic Project Boundary must encompass all areas where the Project Proponent is implementing SOC-enhancing management activities for crediting purposes. The Project Boundary may consist of a single area or a collection of discrete units (ie a grouped project - See Section 4.2). Individual units may be grouped into the same project provided they are all eligible, are subject to the same project interventions, and are located within the same country. Sampling strata and monitoring units must be defined within the Project Boundary in accordance with the requirements set out in Section 8.0, and must be of sufficient resolution to capture meaningful spatial variation in SOC stocks across soil types, land use histories, and management zones.
[/R-DWE1-0]Where land directly adjacent to the Project Boundary is under the management of the Project Proponent or an enrolled land owner, and is subject to management activities with a plausible potential to influence SOC stocks within the Project Boundary (including tillage, application of organic inputs, or changes in vegetation cover at or near the boundary), those activities must be disclosed with justification and evidence that they do not pose a risk of Leakage or Reversal with respect to the enrolled area. This requirement is limited to land directly adjacent to the Project Boundary and does not extend to unenrolled units elsewhere within a land owner's operation.
[/G-GT6H-0]This Protocol applies across the full temporal (see Section 5.0) and spatial scope of the Project. The Project Boundary is set at the time of project initiation and may be modified during the Crediting Period in the following circumstances:
All boundary modifications must be documented and verified at the next Verification event.
[/G-4F26-0]The Project must not harm biodiversity or existing ecological function, and should aim to improve ecosystem function (The natural processes and interactions that occur within an ecosystem, including the flow of energy and materials through biotic and abiotic components, encompassing activities like nutrient cycling, primary production, and habitat provision, which collectively maintain the balance and stability of the ecosystem.) and biodiversity where possible.
The Project must not harm Indigenous Peoples and local, underserved, or marginalized communities, in compliance with the Social Impacts Section of the Isometric Standard and Section 6 of this Protocol. Where project activities occur on land owned, occupied, or customarily used by Indigenous Peoples, or where project activities have the potential to directly or indirectly affect the territories, resources, or livelihoods of Indigenous Peoples, Project Proponents must enact a Stakeholder Engagement Plan consistent with the principles of Free, Prior, and Informed Consent (FPIC) as outlined by the United Nations Declaration on the Rights of Indigenous Peoples. Project Proponents must document the impact assessment underlying their determination. Geographic proximity alone, in the absence of a plausible impact pathway, does not trigger this requirement.
The unit of enrollment, eligibility assessment, baseline determination, and quantification under this Protocol is defined as a contiguous area under a single management regime. Project Proponents may enroll individual units within a landowner's or operator's holdings without requiring enrollment of all units under common ownership, lease, or operational control. Across different settings and intervention Modules, further details may be provided to more explicitly define this. References to "farm," "property," or "landowner" elsewhere in this Protocol should be interpreted at the unit level unless the context expressly requires otherwise (for example, where legal tenure or contractual obligations are inherently held at the entity or parcel level).
A unit's Enrollment Date precedes or coincides with its Project Initiation. Project Establishment activities undertaken after the Enrollment Date but before SOC-enhancing operations begin (e.g., capital deployment into infrastructure during a ramp-up phase), form part of the Project and do not constitute prior adoption.
Additionally, projects under this Protocol must meet all of the following project conditions:
Projects that were started within 5 years prior to the certification of this Protocol (V1.0, certified July 2026) may be eligible for crediting under this Protocol on a case-by-case basis. Project Proponents seeking Credits for pre-existing deployments must justify the approach taken in these Projects in the PDD, with special attention paid to:
[/R-1H9P-0]Projects started prior to the publication of this Protocol are subject to the same uncertainty and statistical significance requirements throughout this Protocol. Where a deviation from this Protocol precludes a robust determination of net CO₂e removal, that Project is not applicable under this clause. At a minimum, all Projects must:
Crediting under this clause remains subject to the additionality and Prior Adoption requirements of Section 7.4, and to the Crediting Period Start Date limit in corresponding section of the Isometric Standard; removals occurring before the Crediting Period Start Date are not eligible for crediting.
Projects that are credited under this clause may be subject to additional tests and checks that are not explicitly required in this Protocol, as these Projects often use methods and techniques that differ from those given within this Protocol. The purpose of these checks is to evaluate the validity of such methods and ensure that there is sufficient confidence for credit issuance (Certificates are issued to the Certificate Account of a Project Proponent with whom Isometric has a Validated Protocol after an Order for Verification and Certificate Issuance services from a Buyer and once a Verified Removal or Reduction has taken place.). The specific checks required will depend on the Project and the deviations from this Protocol.
Projects transferring from another carbon crediting program may be eligible under this Protocol on a case-by-case basis, provided they are not concurrently listed or credited elsewhere for the same removals; double issuance, double use, and double claiming are prohibited in accordance with the Isometric Standard. Project Proponents seeking Credits for a transitioning Project must justify the transition in the PDD, with special attention paid to:
[/R-N65B-0]Baselines, additionality determinations, and quantification accepted under another program are not automatically valid under this Protocol and will be assessed by Isometric on a case-by-case basis. The Crediting Period start date under this Protocol must not predate the end of the last period for which Credits issued by another program remain live.
As with pre-existing deployments, Projects credited following a transition may be subject to additional tests and checks that are not explicitly required in this Protocol, to evaluate the validity of methods used under the previous program and ensure sufficient confidence for credit issuance.
The Project Commitment Period consists of the Crediting Period and any Ongoing Monitoring Period which is required by the Module under which The Project is crediting.
The Crediting Period is the interval between project initiation (e.g., first implementation of the project intervention) and the end of the last Reporting Period. The Crediting Period is made up of successive Reporting Periods.
The Ongoing Monitoring period encompasses a period following the Crediting Period during which carbon stocks are monitored for potential reversals. Requirements for inclusion of an Ongoing Monitoring Period as part of the Project Commitment Period, as well as monitoring requirements, are covered at the Module level.
The Project Enrollment Date is the date a field is formally added to The Project, evidenced by the landowner's or operator's signatory consent and documented land tenure recorded in the PDD. This is an administrative milestone only: it does not start the Crediting Period and does not, by itself, authorize any project-activity grazing-management change.
The Enablement Window is an optional, time-bound interval beginning on the Enrollment Date and ending at Project Initiation, during which the Project Proponent may carry out preparatory and enabling activities; installation of project infrastructure (e.g., virtual fencing, water points and reticulation, fencing and laneways), the baseline soil-carbon campaign (t₀), and completion of stakeholder engagement and FPIC, without commencing the Crediting Period and without claiming Credits. Maximum duration of the enablement window is 12 months from the Enrollment Date. FPIC consultation must be complete before any enabling activity that physically affects stakeholders or their land-use rights, and the t₀ baseline campaign must be completed before, or coincident with, the end of the window and before any management change.
[/The Project Initiation / Project Start Date is the date the first project-activity grazing-management change is implemented. This date triggers the start of the Crediting Period and is the anchor for the additionality prior-adoption lookback. The installation of infrastructure and the conduct of baseline measurement during the Enablement Window do not, of themselves, constitute Project Initiation.
The Project Commitment Period is a project-level obligation held by the Project Proponent. Individual contracts between the Project Proponent and enrolled landowners or operators are not required to run for the full Project Commitment Period. Where individual contracts are shorter than the Project Commitment Period, the Project Proponent must demonstrate how monitoring and reversal liability for the affected enrolled land will be sustained for the remainder of the Project Commitment Period, including through the Ongoing Monitoring Period. An additional buffer pool (A common and recognized insurance mechanism among Registries allowing Credits to be set aside (in this case by Isometric) to compensate for Reversals which may occur in the future.) contribution applies for Reporting Periods in which contracts are not in place for the full Project Commitment Period, in accordance with Section 10.4.1. For grouped projects where new units are added to The Project over time, the project timeline may be staggered across enrolled units to reflect different initiation times of project activities.
[/G-SAQ6-0]Credit issuances occur throughout the Crediting Period and are issued upon verification of a Reporting Period. Under the cumulative accounting framework, Credits issued at each verification event represent the cumulative net CO₂e removal from project initiation to the end of the current Reporting Period, less all Credits previously issued under the Project and other discounts (e.g., leakage discount), in accordance with Section 9.0.
Abandonment of The Project or failure to perform the land management activities required to maintain SOC stocks at any point during the Crediting Period may result in project failure. In the event of project failure, all Credits issued under The Project may be canceled.
The duration of the Crediting Period, Reporting Period and Ongoing Monitoring Period, and Durability are defined at the Module level.
To ensure the Project Proponent has proper authorization from the true property ownership, this Protocol explicitly prohibits lessees or concessionaires from enrolling land for Credits without the landowner's signatory consent, which must be provided in the PDD.
[/G-BRSG-0]For each enrolled area, the landowner or operator with rights of use over that area must have legal, documented land tenure for the duration of the Crediting Period applicable to that area. Where the Project Proponent is itself the landowner or operator, this obligation falls on the Project Proponent. Where the Project Proponent is contracting on land owned or operated by another party, this obligation falls on that landowner or operator, and the Project Proponent must document the underlying tenure as part of its enrollment evidence.
[/R-WFWN-0]Tenure and contractual arrangements with individual landowners or operators are not required to extend to the full Project Commitment Period. Where they do not, the Project Proponent's project-level monitoring and reversal-compensation obligations continue to apply across the full Project Commitment Period as set out in Section 5.1 and Section 10, and an additional buffer pool contribution applies in accordance with Section 10.4.1.
Project Proponents are liable for the maintenance of the project system carbon stocks throughout the Project Commitment Period in accordance with the requirements of this Protocol and applicable Modules. Where the Project Proponent is contracting on land owned or operated by another party, including smallholder land, the landowner or operator must be contractually obligated to maintain the project system carbon stocks in accordance with the requirements of this Protocol and applicable Modules for the duration of their contractual participation in The Project.
[/G-CZJV-0]The consent and documentation pathway depends on the ownership structure of the enrolled land. Project Proponents must satisfy the applicable pathway below:
[/G-ZDN5-0]The Project Proponent must monitor for Reversals throughout the Project Commitment Period. Loss of land access through unenrollment or other means does not extinguish the Project Proponent's monitoring obligation; where direct measurement is not possible for a given enrolled area, the Project Proponent must either secure equivalent remote and modeled monitoring sufficient to characterize reversal risk for that area, or treat the area as having experienced a full Reversal. For example remote sensing (The use of satellite, aircraft and terrestrial deployed sensors to detect and measure characteristics of the Earth's surface, as well as the spectral, spatial and temporal analysis of this data to estimate biomass and biomass change.) as a screening layer to detect surface-visible reversal triggers (including land use change, tillage events, fire, and major erosion), ideally coupled with sampling or modelling.
[/G-M9A5-0]Credit issuances may decrease over time, and continued financial payments may be needed to incentivize maintenance of carbon stocks. To evidence the continued financial viability of The Project over the full Project Commitment Period, Project Proponents must provide a financial model and cash flow statement demonstrating a clear payment structure for the duration of the Project Commitment Period. Methods to maintain continued financial incentives may include, but are not limited to:
[/G-7Y5T-0]If operational, legal, or regulatory constraints preclude the development of a financial model or negate its efficacy for supporting long-term maintenance, the Project Proponent must provide justification for the absence of a financially-based plan for long-term maintenance, as well as details of what alternative mechanisms will be in place to support maintenance of the project carbon stocks over the full Project Commitment Period. Such mechanisms may include, but are not limited to, conservation easements, governmental protections, or land trusts.
[/G-VK1F-0]Following the Isometric Standard, Credits issued under this Protocol are contingent on the implementation, transparent reporting, and independent Verification of comprehensive safeguards. These safeguards encompass a wide range of considerations, including environmental protection, social equity, community engagement, and respect for cultural values. The process mandates that safeguard plans be incorporated into all major project phases, with detailed reports made accessible to stakeholders. Adherence to and verification of environmental and social safeguards is a condition for all Crediting Projects.
An environmental and social risk assessment, in compliance with the Environmental and Social Impacts Section of the Isometric Standard, must be completed to identify potential risks, followed by the development of tailored mitigation plans. These plans must encompass specific actions to avoid, minimize or rectify identified impacts. Effective implementation of these measures must also be accompanied by a robust monitoring plan (Contained within an Isometric PDD and GHG Statement, where Project Proponents obtain, record, compile, analyse and document monitoring data, including assumptions, references, activity data and calculation factors in a transparent manner that enables the checking of performance achieved during various activity stages.) to detect adverse effects and pause project activities if necessary, using the principles of adaptive management described below.
Environmental and social risk identification, assessment, avoidance, and mitigation planning will be unique to the technical, environmental, and social contexts of The Project. To accommodate this variation, the requirements outlined in this section serve as minimum safeguards to which the Project Proponent and Isometric can add to on a case by case basis, to be included in the PDD, if applicable.
Project Proponents must comply with all national and local laws, regulations and policies, and receive any necessary permits for project activities, if applicable. Where relevant, projects must comply with international conventions and standards governing human rights and uses of the environment.
Project Proponents must document activities that trigger environmental permitting requirements.
[/R-BSC5-0]Where Projects aim to apply new or novel technologies such as biostimulants, Project Proponents must, at a minimum:
[/R-3SKZ-0]Adaptive management incorporates learnings and takeaways from project monitoring into project development7. Regular data collection and sharing is necessary to implement adaptive management. Results from data collection at the end of each Reporting Period must be shared with local stakeholders, as described in Section 6.6.1, and be used to inform future iterations of project management and development.
[/G-K2GT-0]Project Proponents must predict and plan for potential unintended but foreseeable outcomes of project activities and construct mitigation plans for such instances. Foreseeable risks identified during the preparation of the environmental and social risk assessment must be included in the PDD and the following must be detailed for each potential risk:
[/R-QEFM-0]The Project should not hinder the ability of the community or local ecosystem to adapt to climate change as a result of the CDR (Activities that remove carbon dioxide (CO₂) from the atmosphere and store it in products or geological, terrestrial, and oceanic Reservoirs. CDR includes the enhancement of biological or geochemical sinks and direct air capture (DAC) and storage, but excludes natural CO₂ uptake not directly caused by human intervention.) activity.
Projects must maintain and should enhance the biodiversity of existing ecosystems while optimizing carbon storage outcomes, regardless of whether the project interventions involve a change in land use. Some projects under this Protocol may be established in working landscapes where existing species assemblages, soil communities, and ecological processes are already present. The primary biodiversity objective for these projects is to ensure that land management practice changes designed to enhance soil carbon sequestration and storage do not compromise the ecological integrity of these established land uses, and where possible, enhance biodiversity through improved soil health, vegetation diversity, and habitat complexity.
SOC-enhancing practices can provide significant opportunities to enhance biodiversity by improving soil biological diversity, increasing vegetation cover, supporting pollinator habitat, and reducing agrochemical inputs. However, these same practices must be carefully designed to avoid unintended consequences such as introduction of invasive species (A species whose introduction, spread, and/or growth threatens biological diversity.), disruption of existing soil communities, or habitat degradation arising from changes in water management or agrochemical use.
Project Proponents must not implement land management practices that result in net degradation of soil biological diversity, and must demonstrate adherence to this requirement in the Project Design Document. For all project interventions, the Project Proponent must provide evidence (peer-reviewed literature, project data, or equivalent) demonstrating that the implemented practice does not pose a threat of net degradation to soil biological diversity. If no such evidence exists, Project Proponents must provide additional details on how the system health will be monitored over the course of The Project.
[/R-B3B9-0]Project Proponents must not implement land management practices that result in net degradation of soil biological diversity, and must demonstrate adherence to this requirement in the Project Design Document. For all project interventions, the Project Proponent must provide evidence (peer-reviewed literature, project data, or equivalent) demonstrating that the implemented practice does not pose a threat of net degradation to soil biological diversity. If no such evidence exists, Project Proponents must provide additional details on how the system health will be monitored over the course of The Project.
[/G-YPN1-0]Additionally, Project Proponents must demonstrate that proposed management practice changes will maintain existing biodiversity and, where possible, contribute to measurable improvements in ecosystem function and resilience as further described in the requirements below.
[/G-W92B-0]Project Proponents must list all plant species introduced as part of project activities in the Project Design Document. Introduced species should be native, naturalized, or non-native range-expanding species appropriate to the project area. Project Proponents must not introduce or maintain species invasive to the region or similar climates, geographies, or ecosystems of the project area.
[/R-YR6Y-0]Project Proponents must list all plant species introduced as part of project activities in the Project Design Document. Introduced species should be native, naturalized, or non-native range-expanding species appropriate to the project area. Project Proponents must not introduce or maintain species invasive to the region or similar climates, geographies, or ecosystems of the project area.
[/G-JBGP-0]Where non-native species are introduced as part of project activities (e.g., non-native cover crop species), Project Proponents must demonstrate that:
[/G-6QCF-0]The definition of 'invasive species' in this Protocol is consistent with the Convention on Biological Diversity's definition of Invasive Alien Species, being a "species whose introduction and/or spread threatens biological diversity”8.
Project Proponents must provide due diligence to avoid harm to rare, threatened, and endangered species in the project area, as well as preventing against new species added to this list as a result of project activities. A review of rare, threatened, and endangered species must be included and referenced in the Project Design Document.
[/R-JD2K-0]The list must be developed using the following sources in order of priority:
For each rare, threatened, or endangered species identified, the Project Proponent must document in the Project Design Document:
[/G-TC84-0]Project Proponents must handle data and information related to rare, threatened, and endangered species with discretion, particularly in regions with histories of poaching, over-harvesting, or other elevated threats.
[/G-E13S-0]Project Proponents must comply with best management practices (BMPs) and with all applicable local, state/provincial, and national laws and regulations governing the use of chemical amendments.
[/R-61Y8-0]Project Proponents must disclose to Isometric all synthetic herbicides, fertilizers, and pesticides used within the Project Area at enrollment, whether or not their use increases relative to the baseline, so that adverse-effect and permitting obligations under Section 6.2 can be assessed.
[/G-AWGZ-0]Where the use of synthetic pesticides forms part of project interventions, or increases relative to the baseline, Project Proponents must ensure such use is targeted and limited in scope to the intended pest(s).
[/G-1NZE-0]Reporting of chemical amendment use is required as follows:
The emissions associated with any induced increase in the use of synthetic herbicides, fertilizers, and pesticides must be accounted for in line with the emissions accounting requirements of Section 9.6.
In accordance with the Stakeholder Input Process Section of the Isometric Standard, Project Proponents must demonstrate active stakeholder engagement throughout project planning and operation, ensuring that all risk mitigation strategies contribute to sustainable project outcomes. Local stakeholders may contribute an in-depth understanding of the project area and operations, and provide invaluable insights and recommendations on potential risks, necessary safeguards, and specific monitoring needs. Engaging local stakeholders creates community buy-in, providing long-term commitment and investment in the success of nature-based projects9,107. Furthermore, lack of community support, stakeholder engagement, and perceived community benefits has been identified as a primary source of project failure in previous nature-based projects1110.
The Project Proponent must develop a Stakeholder Engagement Plan in accordance with the requirements outlined in the Stakeholder Input Process Section of the Isometric Standard. The plan and supporting documentation, including evidence of meetings or other forms of engagement, must be submitted in the PDD.
[/R-SPSX-0]Prior to the commencement of project activities, Project Proponents must assess whether Indigenous Peoples will be impacted by project activities. Impacts may include, but are not limited to:
[/G-8ZPR-0]This assessment must incorporate analysis of reputable, independent data by a subject matter expert, who may be a third party. The results of this assessment must be included in the PDD. If the assessment identifies potential impacts to Indigenous Peoples, the additional requirements in Section 6.6.2 apply.
Where the assessment does not identify potential impacts on Indigenous Peoples, Project Proponents are encouraged, but not required, to complete a Stakeholder Engagement Plan consistent with FPIC principles for other relevant stakeholders who rely on land or resources located within the project area. This encouragement is without prejudice to Section 6.6.3: where FPIC is required for enrolled Operators or Subsistence smallholders under that Section, it applies regardless of any finding on Indigenous impact.
The following information from the stakeholder engagement process must be made publicly available, with personal information anonymized or redacted to protect stakeholders, project personnel, and project outcomes:
[/G-WMJD-0]Absolute revenue figures, individual transaction values, and buyer-specific pricing are not required to be made publicly available under this Protocol. Where the Isometric Standard or this Protocol requires Project Proponents to report financial information to Isometric for verification or oversight purposes, that information may be submitted in confidence and is not subject to public disclosure unless expressly required elsewhere in this Protocol.
Where the impact assessment in Section 6.6.1 identifies potential impacts on Indigenous Peoples, the Project Proponent must enact a Stakeholder Engagement Plan consistent with the principles of Free, Prior, and Informed Consent (FPIC) as outlined by the United Nations Declaration on the Rights of Indigenous Peoples in 20071210 and expanded upon by the Food and Agriculture Organization of the United Nations in 20161311.
FPIC is a governance mechanism, not an informational disclosure process. The requirements of this Section are intended to ensure that affected Indigenous Peoples have a substantive role in shaping project design and the genuine ability to grant, condition, or withhold consent — not merely to receive information about decisions already made.
The FPIC principles are as follows:
Informed: Information is presented in a manner that is accessible to all stakeholder groups. Accessible content may differ across stakeholder groups. The Project Proponent must consider the language and medium of communication in the information-sharing process. For example, if information is presented electronically, stakeholders must have access to and familiarity with the necessary technology to review it; if information is presented during in-person meetings, the meetings must be held at a time and in a location conducive to stakeholder attendance. Information presented to stakeholders must be objective and present trade-offs fairly and accurately, and must be provided on an ongoing basis. The following due diligence is strongly recommended to ensure stakeholder groups are well informed of project development and outcomes:
Where a stakeholder is also an enrolled party under Section 6.6.3, the disclosures in Section 6.6.3.5 are mandatory rather than recommended, and govern to the extent of any overlap.
The Project Proponent is encouraged to prepare alternatives for the withdrawal or denial of consent to project activities by stakeholder groups.
The following may serve as burdens of proof that the Stakeholder Input Process conforms with the principles of FPIC. The Project Proponent must indicate how these steps were or will be carried out during the project lifetime. Multiple rounds of stakeholder engagement may take place during a project lifetime, as needed. The Project Proponent may identify other burdens of proof demonstrating that the principles of FPIC have been observed and submit them in the PDD, in addition to or instead of those below, in consultation with Isometric.
The VVB (Third-party auditing organizations that are experts in their sector and used to determine if a project conforms to the rules, regulations, and standards set out by a governing body. A VVB must be approved by Isometric prior to conducting validation and verification.) may conduct random surveys or interviews with stakeholder groups, and/or witness some or all of the processes described above.
Additional requirements apply to any Project which operates via partnerships with enrolled parties via a collection of separate agreements held directly with those who hold rights to, operate, or work the enrolled land. There is no standard definition of the term "smallholder," and the land area, asset value, livelihood dependence, and bargaining power of enrolled parties vary considerably across the globe and across Project types. Treating all such parties as a single class risks both under-protecting those with limited bargaining power and applying protections designed for vulnerable parties to sophisticated commercial counterparties for whom they are not appropriate.
This Section sets out the safeguarding objectives that every such Project must meet, together with a set of categories to help Project Proponents identify which objectives apply to which parties. It is intended to be applied in a Project-specific context: the categories and mechanisms described below are a framework and a set of worked examples, not a rigid or exhaustive checklist. A Project Proponent may adopt classifications, instruments, and engagement approaches suited to the legal, cultural, and operational context of its Project, provided the underlying safeguarding objective of each applicable category is met and the approach is documented and justified in the PDD.
Regardless of how a Project characterizes its enrolled parties, and in addition to any obligations arising under Sections 6.6.1 and 6.6.2, a Project operating via such agreements must, for all enrolled parties:
[/R-10H7-0]These are the minimum obligations. The categories in Section 6.6.3.2 add further, more protective requirements where relevant; FPIC, consultation, informed approval, and the revenue-share floor attach through those categories rather than through this baseline.
The categories below are additive rather than exclusive: an enrolled party may fall into more than one, and the requirements that apply to a party are the union of the objectives triggered by every category it occupies. A Project Proponent should identify the categories that apply to each enrolled party, and may recognize further relevant characteristics not listed here where doing so better reflects the project context.
[/G-QK5C-0]Landowner. A party that holds property rights to enrolled land, for example a government entity, corporation, investment vehicle, or private individual or family. Objective: the landowner gives informed approval to The Project, and receives the minimum revenue-share floor of Section 6.6.3.6. The appropriate approval mechanism will depend on the landowner's relationship to the land, for example, a Land Use Agreement (LUA) may be suitable for an absentee or institutional landowner, and a collaboration agreement for a hands-on landowner but a Project Proponent may use whatever instrument achieves genuine informed approval in its context.
Operator. A party that holds the right to operate the enrolled land, whether or not it also holds property rights to it. Objective: engagement is conducted consistent with the principles of FPIC set out in Section 6.6.2.
Worker. A party involved in the day-to-day operations on the enrolled land, whether or not it holds any property or operating rights. Objective: meaningful consultation appropriate to its involvement.
Subsistence smallholder. A rights holder to a small land area under legal or customary rights who depends on that land primarily for their own subsistence and who plays a primary role in the management activities occurring on the land. Because these parties are the most exposed, this category carries the full set of protections: engagement consistent with the principles of FPIC (Section 6.6.2), the complete disclosure obligations of Section 6.6.3.5, the minimum revenue-share floor of Section 6.6.3.6, and the landowner-privacy data restrictions of Section 7.6. A Project Proponent retains flexibility in how these protections are implemented but may not waive or dilute them for a party that meets this description.
Because the categories are additive, a Project Proponent builds the safeguarding approach for each enrolled party out of the applicable objectives. For example:
Where a Project's circumstances are not well captured by these examples, the Project Proponent should apply the categories purposively asking which safeguarding objectives the party's actual position calls for and document the reasoning in the PDD.
A Project that operates via separate agreements with any party in the Subsistence smallholder category is considered to be operating via a smallholder arrangement and is subject to the requirements of this Section in full. The means by which a Project meets those requirements may be tailored to context, but the protections owed to subsistence smallholders represent a floor rather than a starting point for negotiation.
The disclosures in this Section apply in two tiers. Where a party is also covered by the recommended "Informed" due diligence in Section 6.6.2, these obligations are mandatory and govern to the extent of any overlap.
Monitoring and public data-sharing disclosures (all enrolled parties). Project Proponents must disclose the following to every enrolled party and ensure that party understands:
[/G-B811-0]Complete disclosure obligations (parties holding property or operating rights; mandatory in full for Subsistence smallholders). In addition to the above, Project Proponents must disclose the following and ensure the party understands:
[/G-YWWP-0]The minimum revenue-share floor applies to enrolled parties holding property or customary rights to enrolled land (the Landowner and Subsistence smallholder categories; together, "enrolled landowners" for the purposes of this Section). Project Proponents must disburse a minimum of 20% of the revenues, or equivalent revenue or net profit share, generated from all Credits issued under The Project to enrolled landowners over the lifetime of The Project, unless a different threshold is defined by the intervention Module.
[/R-MNCW-0]Eligible forms of revenue sharing include:
All of these must be provided to enrolled landowners at an individual level, and any non-monetary, in-kind component must involve a transfer of ownership to the landowner. If any component is contingent upon the landowner meeting particular requirements (e.g., maintenance of the system), those requirements must be clearly communicated at the time of the initial agreement and disclosed in the PDD. At PDD submission, Project Proponents must provide details of the systems that will be used for benefit distribution and the documentation that will be produced for tracking distribution (e.g., digital payment records, or other documentation in the absence of formal financial systems). These systems must also include a mechanism for landowners to report grievances or disputes related to revenue sharing, and for tracking the response and resolution of those issues.
[/G-JHRB-0]Project Proponents must provide an anticipated timeline of how revenue sharing will be distributed over the duration of tThe Project in the PDD. At every verification, Project Proponents must provide evidence demonstrating progress against the revenue-sharing plan, including proof of payments and benefit distribution, and must report any grievances raised by landowners via the reporting system together with the subsequent responses and resolution. Projects that fail to provide sufficient evidence and/or reporting may be required to undergo an audit by an independent certified financial auditor. If at any verification the cumulative revenue sharing is less than 80% of the level projected for that point in the initial plan at PDD submission, the Project Proponent must submit an updated revenue-sharing plan and timeline demonstrating how the Project will meet the revenue sharing required by this Protocol and by its agreements with landowners. This revised plan will be used as the benchmark for subsequent verifications.
[/G-66M0-0]Revenue-sharing percentages must be made public, including the percentage of revenue or Credits allocated to each documented party (e.g., Project Proponent, enrolled landowner(s), insurance provider(s), and other documented parties listed in the PDD). This requirement applies to the structure and proportions of benefit sharing; consistent with Section 6.6.1.1, absolute revenue figures, individual transaction values, and Buyer-specific pricing are not required to be made publicly available.
[/G-SVFN-0]Project Proponents must also disclose within the PDD what training and/or assistance will be provided to enrolled landowners to support proper management of the project system and implementation of project interventions. These plans should be informed by engagement with the enrolled landowners and should address any needs or risks identified through that process.
[/G-DGBA-0]The Project Proponent must identify and develop processes for the protection and promotion of community well-being in the PDD, as follows:
As previously mentioned, community buy-in is critical to the success of improved soil management projects. Community buy-in may be established when stakeholders are properly informed about the benefits they can expect from The Project. Equally important in maintaining buy-in is for the positive impacts resulting from The Project to match the (perception of) potential benefits presented to community stakeholders at the project onset. A mismatch in benefits expected and benefits realized may similarly hinder project success.
While this Protocol will not prescribe requirements for community impacts, the Project Proponent is strongly encouraged to consider establishing the following programs and activities:
Positive impacts should be felt by all stakeholder groups identified in Section 6.6.1. Project Proponents should consider which groups may face the brunt of negative community impacts, and how positive community benefits may be shared equitably with these and other marginalized groups.
It is recommended that the Project Proponent provide support to the local communities and ecosystems to establish locally-relevant mitigation strategies to adapt to changing climates.
The following topics are covered briefly in this Protocol due to their inclusion in the Isometric Standard, which governs all Isometric Protocols. See in-text references to the Isometric Standard for further guidance.
For each specific Project to be evaluated under this Protocol, the Project Proponent must document project characteristics in a Project Design Document (PDD) as outlined in the Documentation Section of the Isometric Standard. The PDD will form the basis for project validation and evaluation in accordance with this Protocol.
Projects must be validated (A systematic and independent process for evaluating the reasonableness of the assumptions, limitations and methods that support a Project and assessing whether the Project conforms to the criteria set forth in the Isometric Standard and the Protocol by which the Project is governed. Validation must be completed by an Isometric approved third-party (VVB).) and net CO2e removals verified (A process for evaluating and confirming the net Removals and Reductions for a Project, using data and information collected from the Project and assessing conformity with the criteria set forth in the Isometric Standard and the Protocol by which it is governed. Verification must be completed by an Isometric approved third-party (VVB).) by an independent third party, consistent with the requirements described in this Protocol and the Module(s) under which The Project is crediting, as well as in the Validation and Verification Requirements Section of the Isometric Standard.
The Validation and Verification Body (VVB) must consider the following requisite components:
As part of this evaluation, the VVB must also review the characterization and quantification of all individual uncertainty sources within the listed components that contribute to the calculation of net CO2e removal.
The threshold for Materiality (An acceptable difference between reported Removals/emissions or Reductions/emissions and what an auditor determines is the actual Removal/emissions or Reduction/emissions.), considering the totality of all omissions, errors and misstatements, is 5%, in accordance with the Materiality Threshold Section of the Isometric Standard.
Verifiers should also verify the documentation of uncertainty of the GHG Statement as required by the Uncertainty in Removals and Reductions Section of the Isometric Standard. Qualitative Materiality issues may also be identified and documented, such as:
Project Validation and Verification must incorporate site visits to Project facilities, namely in situ field plots, in accordance with the requirements of ISO 14064-3, 6.1.4.2. This is to include, at a minimum, site visits during the first Validation or Verification of a Project, to the project site(s). Validators should, whenever possible, observe project operation to ensure full documentation of process inputs and outputs through visual observation and validation of instrumentation, measurements, and required data quality measures.
A site visit must occur at least once during each Project Validation. Additional site visits may be required if there are substantial changes to operations over the course of a Project's Validation period, or if deemed necessary by Isometric or the VVB. Site visit plans are to be determined according to the VVB's internal assessment, in consultation with Isometric.
Verifiers and Validators must comply with the requirements defined in the Validation and Verification Requirements Section of the Isometric Standard. In addition, verification teams must maintain and demonstrate expertise associated with land management practices and soil science, including both field measurements processing and analysis and model-based analysis. Verification teams must also demonstrate competence in assessing stakeholder engagement processes.
CDR via soil sequestration is a result of a multi-step process (e.g., site preparation, land management activities, system maintenance, monitoring), with activities in each step potentially managed by a different operator, company, or owner. Further, improved soil management projects can also often involve a coalition of smallholder landowners. A single Project Proponent must be specified contractually as the sole owner of the Credits when there are multiple parties involved in the process, and to avoid Double Counting (Improperly allocating the same Removal or Reduction from a Project Proponent more than once to multiple Buyers.) of net CO2e removals. Contracts must comply with all requirements defined in the Ownership Section of the Isometric Standard.
The Project Proponent must be able to demonstrate additionality through compliance with the Additionality Section of the Isometric Standard. The Baseline scenario and Counterfactual utilized to assess additionality must be project-specific and comply with Section 9.4.
Projects must not occur in regions where significant rates of the project interventions are driven by market demand, local and/or national incentives, or policies that would lead to similar land management practices without Carbon Finance.
For projects where the Project Proponent is not the land owner, the landowners, land managers, or authorized (with documentation) representative thereof must provide signed attestations confirming that implementation of the relevant project activities was contingent upon participation in The Project.
[/R-8A8H-0]Government subsidies or civil contractual obligations for specific land management practices, such as organization bylaws, inhibit additionality and fall under the Regulatory criteria in the Additionality section of the Isometric Standard. Additionality is assessed each Reporting Period using the counterfactual assessment described in Section 9.4.
All projects must demonstrate the necessity of Carbon Finance for project viability following the Additionality Section of the Isometric Standard. If any revenue will be produced from commodity production within the project area or sources other than Removals, additional requirements for demonstrating financial additionality (An evaluation of the likelihood that an intervention that causes a climate benefit above and beyond what would have happened in a no-intervention Baseline scenario was the result of revenues from carbon finance.) are described in Financial Additionality Considerations Section of the Isometric Standard.
The Project must document that the specific project interventions have not been implemented on an enrolled unit prior to its Enrollment Date. In this context, the project interventions are considered to be inclusive of all activities implemented by The Project which materially increase soil carbon storage. The Project must complete a prior-adoption lookback:
[/R-VZ46-0]A single year of adoption within the lookback is permissible if the Project Proponent demonstrates continuous non-adoption across an extended 7–10 year window. Two or more years of adoption (consecutive or not) within the extended window disqualifies the unit.
[/G-156Z-0]Where documented arm's-length management change has occurred within the 5-year window (new owner, new tenant), the lookback is reduced to 3 consecutive years of non-adoption under the new management, provided the new manager has not previously practised the intervention on the enrolled unit.
[/G-8EY9-0]Demonstration of financial additionality for each enrolled project participant (e.g., grower) is impractical for purposes of successfully implementing this program and given the complexity of farming operations and diffuse costs. Alternatively, evaluating financial additionality for the Project Proponent whose enterprise may be entirely or mostly focused on revenue from the voluntary carbon market is not appropriate as it does not speak to the additionality or lack of of a given project enrollee.
We apply financial additionality based on a more streamlined approach evaluating one, the receipt of alternative payments for the practice, and if that is over the threshold, then the evaluation of the net present value (NPV) of incentives and costs.
[/R-FKZV-0]Projects must meet either one of the criteria in Table 1.
Table 1. Documentation requirements for financial additionality
Criteria | Documentation Required |
The practice does not generate any practice-linked incentive payments above $5/acre/year outside of The Project. | Affidavit, potentially supplemented with farm records documenting any payments on other fields or operations, if relevant. |
The total NPV of the sum of practice-linked incentive payments and reduced input costs over a 5-year time horizon is not larger than 50% of the NPV of the sum of all installation and ongoing costs associated with the practice over a 5-year time horizon. | NPV analysis developed by the Project Proponent for each practice, cropping system, and region based on best estimates of typical expected costs and payments. Cost and payment data from individual growers is optional but not required. |
For purposes of demonstrating financial additionality, incentive payments include practice-linked payments meaning any payment, cost-share, rental payment, easement payment, or in-kind support from a public authority that is conditional upon the adoption, maintenance, or outcome of a specific land-management practice or set of practices.
This does not include any public payment in respect of the Project Area that is not conditional upon the adoption of a specific land-management practice, including without limitation price-support payments, revenue-insurance indemnities, premium subsidies, ad hoc disaster relief, and area-based income support.
For Project Areas measured in hectares or other units, the threshold must be converted to the equivalent value per local unit of area at the prevailing exchange rate at the start of the relevant Reporting Period.
Where a private practice-linked incentive or carbon-intensity-linked premium is paid on a per-bushel or other per unit of production basis, the Project Proponent must convert the payment to a per-acre basis using the field-specific yield history, applying a rolling average of the most recent three (3) verified harvest years for the relevant field and crop. Where field-specific yield history is unavailable, the Project Proponent must apply the county-level (or equivalent sub-national administrative unit) average yield published by the relevant agricultural statistics agency, with documented justification.
[/G-W3SY-0]Where a private practice-linked Incentive takes the form of preferential financing (including preferential interest rates, fee waivers, or extended terms), the Project Proponent must calculate the grant-equivalent value as the difference between (i) the contractual cost of the financing and (ii) the counterfactual cost of equivalent financing at prevailing market interest rates for agricultural loans of comparable type, term, and risk. For US Project Areas, the Project Proponent must use the agricultural-finance interest-rate data published by the Federal Reserve Bank of Kansas City (Center for Agriculture and the Economy) as the counterfactual benchmark, or such successor benchmark as identified by Isometric. For Project Areas in other jurisdictions, the Project Proponent must use a comparable, publicly available agricultural-loan interest-rate benchmark issued by the relevant central bank, agricultural statistics agency, or recognized agricultural-finance authority, with documented justification. The grant-equivalent value must be annualized and expressed on a per-acre basis.
[/G-FRNK-0]The Per-Acre Materiality Threshold is set at USD $5.00 per acre per year, derived from the United States case study and set near the low end of incentive levels historically offered under formal practice-adoption programs in the United States. While empirical evidence on the inducement effect of payments at this level is mixed, retaining the nominal value of USD $5.00 (without inflation indexation) is conservative for the purposes of this Section.
For Project Areas outside the United States, or where local conditions materially differ, the Project Proponent must apply the threshold at the equivalent value per local unit of area, converted at the prevailing exchange rate at the start of the relevant Reporting Period.
[/G-3DH8-0]Methodology of calculation of NPV of incentives and costs in instances when the sum of incentive payments exceed Materiality threshold.
[/G-Q2CX-0]Table 2. Conventions for NPV parameters
Parameter | Convention |
Time horizon (n) | 5 years |
Timing | Fixed / start-up costs at t = 0; recurring costs and benefits at the end of years 1 to n. |
Discount rate (r) | Registry default real rate of 7%. |
For the net cost calculation, cash flows fall into two cost buckets and one benefit bucket:
All cost and benefit cash flows are converted to present-value units. The net present value of the practice cost is the sum, across every year of the horizon, of cost minus benefit, each discounted to the present:
[math: NPV_{cost} = \sum\frac{C_t - B_t}{(1+r)^t}]
(Equation 1)
Where:
Non-carbon incentives, for example NRCS EQIP or CSP payments, state cost-share, or buyer premiums, are converted to present value in exactly the same way. Each incentive payment is placed in the year it is received and discounted at the same rate over the same horizon:
[math: NPV_{incentives} = \sum\frac{I_t}{(1+r)^t}]
(Equation 2)
Financial Additionality must be reconsidered at Crediting Period renewal, in accordance with the requirements in this section. Projects must select one of the following options to meet ongoing Financial Additionality:
If a review indicates The Project has become non-additional, The Project will be ineligible for future Credits. Current or past Crediting Periods will not be affected.
Where a Project’s existing Financial Additionality demonstration was conducted over a defined investment horizon, the existing Financial Additionality determination remains valid up to the end of that investment horizon, provided The Project can demonstrate that key economic and operational assumptions used in the original demonstration remain materially unchanged. Projects which continue under an existing Financial Additionality determination in this way may only do so until the end of the investment horizon considered in the original determination, and must reassess Financial Additionality at the first verification event following the end of the existing investment horizon period.
Reassessment of Financial Additionality is required if any of the following conditions apply:
Where reassessment is required in accordance with the above requirements, the Project Proponent must demonstrate that continued Carbon Finance remains necessary to continue project crediting activities, by conducting a full Financial Additionality assessment against the updated Project and baseline scenarios.
The following steps must be taken to demonstrate that without Carbon Finance the project activity is not Common Practice, in accordance with the requirements defined in the Common Practice Analysis Section of the Isometric Standard.
[/R-38VG-0]a) Survey-based approach:
b) Data from existing literature: Statistics on land management activities derived from data collected within five years of the project start date may be used for this demonstration, provided they are relevant to the project area, do not distinguish between activities incentivized by and not incentivized by Carbon Finance (thus are conservative), and are publicly available as:
In regions where there is established government data on practice adoption rates (e.g., the United States) the official data must be used for assessing market penetration rates (e.g., USDA (United States Department of Agriculture) Census of Agriculture).
For proprietary technologies, land management activities may be derived from first-party data collected from customer data to establish rates of practice adoption.
In accordance with the Common Practice Analysis Section of the Isometric Standard, the proposed Project activity must demonstrate Common Practice additionality.
Common Practice additionality must be demonstrated through one of the following tests, selected according to the measured adoption rate and its trend. The applicable test and its documentation are set out in Table 3.
[/G-AQ8J-0]Table 3. Common Practice criteria and documentation
Criteria | Documentation Required |
The practice must be adopted on less than 20% of the area of similar agricultural fields not receiving Carbon Finance for practice adoption (i.e., similar cropping systems, land characteristics, etc.) in the location where The Project is being implemented. | Citation of public administrative data on adoption rates of the relevant practice and location. |
The practice must be adopted on greater than 20% but less than 35% of the area of similar agricultural fields not receiving Carbon Finance for practice adoption (i.e., similar cropping systems, land characteristics, etc.) in the location where The Project is being implemented if adoption rates in the area have been not increased over previous 5 years. | Citation of public administrative data on adoption rates of the relevant practice and location. |
The practice must be adopted on greater than 35% but less than 50% of the area of similar agricultural fields not receiving Carbon Finance for practice adoption (i.e., similar cropping systems, land characteristics, etc.) in the location where The Project is being implemented if adoption rates in the area have decreased by 10 or greater percentage points over the previous 10 years. | Citation of public administrative data on adoption rates of the relevant practice and location. |
These rates must be reflective of overall adoption rates across agricultural systems in the project’s geographic area by default (e.g., “Cropland planted to a cover crop (excluding CRP)” in USDA Census of Agriculture), however more granular data for adoption rates for specific farm practices that match project conditions (e.g., similar cropping rotations and irrigation infrastructures) as available may be used for purposes of identifying market penetration rates subject to Isometric review.
Projects aiming to implement multiple practices within each geographical area, must demonstrate the penetration rate of each practice individually is less than the appropriate adoption rate according to the criteria outlined above.
[/G-YC47-0]The adoption rate for a practice should control for adoption funded or motivated by other incentives or programs. The following acre categories should be subtracted from adoption rate in the geographic area according to procedures above to yield the net adoption rate:
For example, if in a geographic area where there has been modest growth in cover crop planting (Test 1 above) and the gross adoption rate is 35%, but 20% of that adoption is due to enrollment in alternative carbon credit programs, and a USDA conservation program, the net adoption rate is 15% and The Project is deemed additional from a common practice standpoint, all else equal.
The uncertainty in the overall estimate of the net CO2e removal and reductions as a result of The Project must be accounted for. The total net increase in CO2e removed for a specific Reporting Period, CO2eRemoval,RP, and the total net decrease in CO2e reduced for a specific Reporting Period, CO2eReduction,RP , must be conservatively determined in accordance with the requirements outlined in the Uncertainty in Removals and Reductions Section of the Isometric Standard.
Projects must report a list of all key variables used in the net CO2e removal and reduction calculation and their individual uncertainties, as well as a description of the uncertainty analysis approach, including:
For each variable that contributes to the uncertainty of the net CO₂e removal estimate, the Project Proponent must report the variable's central estimate, its assumed probability distribution, and the parameters defining that distribution (for example, minimum and maximum values for a uniform distribution, or mean and standard deviation for a normal distribution), together with a brief justification of the chosen distribution and its parameters. Where project-specific data are not available, published literature values, peer-reviewed default distributions, or values from established databases may be used, provided the source is cited and its applicability to the project context is justified. More detailed uncertainty characterization should be provided where available, as outlined in the corresponding section of the Isometric Standard. Variables that are demonstrably non-material to total uncertainty may be omitted in accordance with the sensitivity analysis (An analysis of how much different components in a Model contribute to the overall Uncertainty.) outcomes below.
A sensitivity analysis that demonstrates the impact of each input parameter’s uncertainty on the final net CO2e uncertainty must be provided. Variables may be omitted from the sensitivity analysis if they are already being included in the uncertainty analysis. Details of the sensitivity analysis method must be provided such that a third party can reproduce the results. Input variables may be omitted from an uncertainty analysis if they contribute to a < 1% change in the net CO2e removal. For all other parameters, information about uncertainty must be specified.
In accordance with the Isometric Standard, all evidence and data related to the underlying quantification of CO2e removal and environmental and social safeguards monitoring will be available to the public through the Isometric platform. That includes:
The Project Proponent can request certain information to be restricted (only available to authorized Buyers, the Registry, and VVB) where it is subject to confidentiality. This includes emission factors, specific data, and/or proprietary models from licensed databases. Restrictions can also be requested when working with smallholder landowners when it is necessary for protecting landowner privacy. However, all other numerical data produced or used as part of the quantification of net CO2e removal will be made available.
The scope of this Protocol includes GHG sources, sinks and reservoirs (A location where carbon is stored. This can be via physical barriers (such as geological formations) or through partitioning based on chemical or biological processes (such as mineralization or photosynthesis).) (SSRs (Sources, Sinks and Reservoirs)) associated with an improved soil management project.
A cradle-to-grave GHG Statement must be prepared encompassing the GHG emissions and removals relating to the activities outlined within the system boundary.
GHG emissions and removals associated with the Project may be direct emissions from a process, or indirect emissions from combustion of fuels, electricity generation, or other sources. Emissions must include all GHG SSRs within the system boundary, from the establishment of amended land management practices and associated inputs, through to the end of the Project Commitment Period. This includes embodied emissions (Life cycle GHG emissions associated with production of materials, transportation, and construction or other processes for goods or buildings.) of all equipment, amendments, and consumables used in the project. The Project Proponent must identify all sources of emissions directly or indirectly related to project activities.
Any emissions from sub-processes or process changes that would not have taken place without the CDR Project must be fully considered in the system boundary. Any activity that ultimately leads to the issuance of Credits must be included in the system boundary.
Where projects are implemented on land under active production prior to the project start date, emissions associated with continuation of pre-project productivity are excluded from the calculation (see Section 9.6).
The system boundary must include all relevant GHG SSRs controlled and related to The Project, including but not limited to the SSRs set out in Table 4. Values for all SSRs outlined in Table 4 must be strictly positive. Any emissions reductions will not count to offset positive emissions for purposes of calculating CO2eRemovals. See Section 8.2.1.1 for further details.
If any GHG SSRs within Table 4 are deemed not appropriate to include in the system boundary, they may be excluded provided that robust justification and appropriate evidence is provided in the PDD. Furthermore, if any SSR is expected to be negligible, they may be excluded in line with Section 5 of the GHG Accounting Module.
Table 4. Scope of activities and GHG SSRs to be included in the system boundary.
Activity | GHG Source, Sink or Reservoir | GHG | Scope | Timescale of Emissions & Accounting Allocation |
|---|---|---|---|---|
Project Establishment | Equipment and materials | All GHGs | Embodied emissions associated with additional equipment and materials manufacture related to project establishment (lifecycle modules A1–3). This must include product manufacture emissions for: Additional equipment (e.g., vehicles, machinery, tillage equipment); New infrastructure (e.g., additional access roads, new irrigation systems); New temporary structures (e.g., fencing, monitoring stations). | Before project operations start. Must be accounted for in the first Reporting Period or amortised in line with allocation rules (see Section 9.5.1). |
Equipment and materials transport to site | All GHGs | Transport emissions associated with transporting additional equipment, amendments (e.g., compost, biochar, cover crop seed) and monitoring materials to the project site(s) for execution of the project (lifecycle module A4). | ||
Site preparation | All GHGs | Emissions related to changes in land management practice at the outset of The Project (lifecycle module A5). This must include, as appropriate: Energy use for tillage operations or soil preparation; Biomass removal or incorporation; Land use change emissions, including any disturbance of existing soil carbon pools; Irrigation system installation. | ||
Misc. | All GHGs | Any SSRs not captured by categories above (e.g., staff travel to site during establishment). | ||
Operations | Soil amendment application | All GHGs | Embodied emissions associated with the manufacture and application of additional soil amendments. This must include, as appropriate: Compost or manure (the upstream processing and transport emissions); Cover crop seed and any associated inputs; Lime and other mineral amendments; Microbial inoculants or bio-stimulants. | Over each Reporting Period. Must be accounted for in the relevant Reporting Period (see Section 9.5.2). |
Nitrogen fertilizer use | N₂O | Direct N₂O emissions from the application of additional synthetic or organic nitrogen-based fertilisers. Must include any fertilisation associated with cover crops, companion crops, or soil amendment programmes. Indirect N₂O from leaching and volatilisation must also be considered where material. | ||
Nitrogen-fixing species | N₂O | Direct and indirect N₂O emissions arising from biological nitrogen fixation by leguminous or other nitrogen-fixing species introduced through project activities (e.g., leguminous cover crops, agroforestry species). Emissions must be estimated based on the quantity of nitrogen fixed and standard emission factors. | ||
Fuel combustion | All GHGs | GHG emissions from the combustion of fossil fuels in vehicles and equipment used for land management, amendment application, monitoring, and other project operations. Including but not limited to emissions associated with equipment use for planting, harvesting, and processing crops/biomass, and any other field management activities. Must be assessed against baseline fuel use to determine whether there are increases. | ||
Liming | CO₂ | CO₂ emissions from the dissolution of limestone (CaCO₃) or dolomite (CaMg(CO₃)₂) applied to soils to adjust pH. Must be assessed where liming rates in the project scenario differ from the baseline. | ||
Biomass burning | CH₄, N₂O | CH₄ and N₂O emissions arising from the burning of crop residues, cover crop biomass, or other vegetation as part of land management activities. CO₂ is excluded from quantification as it is considered carbon-cycle neutral for biomass of biogenic origin. | ||
Monitoring, Reporting and Verification (MRV) | All GHGs | Emissions related to MRV activities (e.g., soil sampling campaigns, laboratory analysis, drone or satellite data acquisition). | ||
CO₂ stored | CO₂ | The gross amount of CO₂ removed and durably stored as soil organic carbon (see Section 9.3). Quantification must be based on measured changes in SOC stocks within the system boundary, accounting for bulk density and soil sampling depth. | ||
Misc. | All GHGs | Any SSRs not captured by categories above (e.g., staff travel during operations for measurement). | ||
End-of-Life | Ongoing monitoring | All GHGs | Emissions relating to monitoring activities over the Project Commitment Period, including periodic soil sampling and laboratory analysis required to verify persistence of stored carbon. | After Crediting Period. Must be estimated and accounted for in the first Reporting Period or amortised in line with allocation rules (see Section 9.5.3). |
Ongoing management | All GHGs | Emissions relating to ongoing management activities required to maintain the SOC enhancement over the Project Commitment Period. | ||
Misc. | All GHGs | Any SSRs not captured by categories above (e.g., ongoing staff travel for monitoring). |
Emissions associated with The Project's impact on activities that fall outside of the system boundary of The Project must also be considered. This is covered under Leakage in Section 9.5.4.
Miscellaneous GHG emissions are those that cannot be categorized by the GHG SSR categories provided in Table 4. The Project Proponent must identify all sources of emissions directly or indirectly related to project activities and must report any outside of the SSR categories identified as miscellaneous emissions.
In line with the GHG Accounting Module v1.1, The Project must:
The Baseline scenario for improved soil management assumes that the activities associated with The Project do not take place and that any infrastructure associated with The Project is not built.
The Counterfactual is the CO2 stored that would have occurred under business as usual management practices over the Crediting Period in the absence of The Project. This is detailed in Section 9.4.
Improved soil management interventions may involve reductions in activities that result in emissions. A limited set of emissions reductions - specifically reduced CO2, N2O, and CH4 from diesel use in tractors corresponding to fewer passes in no- and reduced-tilling intervention and avoided N2O emissions from less fertilizer inputs into soils - are scoped in the Agricultural Practices Reduction Module. The Agricultural Practices Reduction Module scopes the eligibility criteria for evaluating these sources, as well as the accounting approach.
The Agricultural Practices Reductions Module addresses the eligibility and accounting of select emissions reductions.
In order for a Project to claim emissions reductions Credits, The Project must engage in interventions to increase SOC; A Project cannot generate stand-alone emissions reductions Credits.
The permissible emissions reductions scoped in the Agricultural Practices Reductions Module are not expected to have any positive emissions associated with them that are not also related to the intervention to generate removals. All emissions with The Project must be assigned to the term CO2eEmissions,RP for purposes of estimating CO2eRemovals, RP as outlined in Section 9. Any leakage emissions corresponding to yield reductions associated with The Project must be allocated CO2eRemovals, RP .
Additionally, emissions reductions do not inflate removals by counting against CO2eEmissions,RP and are credited separately in the Agricultural Practices Reductions Module.
If Reductions are generated, they must be submitted together with Removals as part of a GHG Entry for every Reporting Period:
[math: GHG_{Entry} = CO₂e_{Removals} + CO₂e_{Reductions}]
(Equation 3)
Where:
See the specific Agricultural Practices Reductions Module for specific details on emissions reductions eligible under this Protocol.
The Reporting Period for improved soil management projects represents the interval of time over which removals are calculated and reported for Verification. The minimum duration of a Reporting Period is one year and the maximum duration is five years, unless otherwise specified within the selected intervention Module.
The increase in total net CO₂e removal is calculated for at Reporting Period and is referred to hereafter as CO₂eRemoval,RP. The net CO₂e removal must be conservatively determined, such that there is high confidence that, at a minimum, the credited quantity of CO₂e was removed and stored in the assessed pools.
GHG emission calculations must include all emissions associated with project activities occurring within the Reporting Period. This includes:
Changes in carbon stocks within eligible pools must be estimated following the requirements within the intervention Module under which The Project is crediting.
In line with the Isometric Standard, this Protocol requires that Removal Credits are issued ex-post. Credits may only be issued once an increase in the relevant carbon pools has been documented and verified within the project boundary, and after accounting for all associated emissions and uncertainty discounts.
This Protocol adopts a cumulative accounting approach. At each Verification, the net CO₂e removal to which The Project is entitled is assessed on a cumulative basis, as the total net removal achieved from project initiation (t=0) to the end of the current Reporting Period. Uncertainty and conservativeness discounts are applied to this cumulative quantity. The quantity issued for the current Reporting Period is then the discounted cumulative net removal to date, less all Credits already issued in prior Reporting Periods. Because uncertainty is assessed against the cumulative quantity, which is anchored to the measured stock at the current time point and at t=0, rather than against each Reporting Period's increment in isolation, measurement uncertainty is not propagated or accumulated across successive Reporting Periods.
Net CO₂e removal is assessed on a cumulative basis. The cumulative net CO₂e removal achieved by The Project from initiation ([math: t=0]) to the end of the most recent Reporting Period ([math: RP_n]) is calculated as:
[math: CO_2e_{Removal,cum,n} = CO_2e_{Stored,cum,n} - CO_2e_{Counterfactual,cum,n} - CO_2e_{Emissions,cum,n}]
(Equation 4)
Where:
The cumulative net removal must be adjusted for uncertainty in accordance with the uncertainty and conservativeness requirements of this Protocol and the applicable intervention Module. The uncertainty assessment must be performed on the cumulative net removal quantity, [math: CO_2e_{Removal,cum,n}], not on individual Reporting Period increments. The resulting uncertainty-adjusted cumulative quantity is denoted [math: CO_2e_{Removal,cum,n}^{*}].
The net CO₂e removal for the current Reporting Period is the uncertainty-adjusted cumulative net removal to date, less all net removal already credited in prior Reporting Periods:
[math: CO_2e_{Removal,RP_n} = CO_2e_{Removal,cum,n}^{*} - \sum_{i=1}^{n-1}CO_2e_{Removal,RP_i}]
(Equation 5)
Where:
The cumulative increase in the amount of CO2e stored for an improved soil management project from project initiation to the end of the most recent Reporting Period ([math: RP\_n]) is calculated directly from the point-in-time stock defined in Equation 7:
[math: CO_2e_{Stored,cum,n} = CO_2e_{Stored,t=n} - CO_2e_{Stored,t=0}]
(Equation 6)
Where:
Uncertainty in stored carbon must be characterised on this cumulative change, [math: CO_2e_{Stored,cum,n}], and carried through to the uncertainty assessment on the cumulative net removal in Section 9.2.
At any given time point, the carbon storage within the Project Area is calculated as:
[math: CO_2e_{Stored,t} = CO_2e_{SOC,t} + CO_2e_{AGB,t} + CO_2e_{BGB,t}]
(Equation 7)
Where:
Calculation of [math: CO_2e_{Stored,t}] , including the which pools are included, must follow the requirements within the relevant intervention Module. The mandatory carbon pool under this Protocol is soil organic carbon ([math: CO_2e_{SOC,t}]), since it represents the primary storage reservoir for all project types within scope. The eligibility of inclusion of aboveground and belowground woody biomass pools is subject to requirements within the intervention Module under which The Project is crediting. All quantification of storage pools must follow the methodological and reporting requirements within the intervention Module under which The Project is crediting.
Deadwood, litter, and non-woody herbaceous biomass carbon pools are excluded from the calculation of [math: CO_2e_{Stored,RP}] under this Protocol as these pools are considered transient.
The value of [math: CO_2e_{Counterfactual}] represents the storage of carbon that would have happened in absence of the project interventions and act as a reference from which to assess the additionality of the project interventions. The Project Proponent is responsible for generating a conservative estimate of [math: CO_2e_{Counterfactual}] following the requirements within the Module under which The Project is crediting.
[math: CO_2e_{Counterfactual,cum,n}] is assessed as the cumulative change in counterfactual carbon storage from project initiation to the end of the most recent Reporting Period ([math: RP_n]):
[math: CO_2e_{Counterfactual,cum,n} = CO_2e_{Counterfactual,t=n} - CO_2e_{Counterfactual,t=0}]
(Equation 8)
Where:
[math: CO_2e_{Counterfactual,cum,n}] is the cumulative change in counterfactual carbon storage from [math: t=0] to the end of the most recent Reporting Period, in tonnes CO2e. This is the cumulative counterfactual quantity used in Equation 4.
[math: CO_2e_{Counterfactual,t=n}] is the total carbon storage within the counterfactual scenario at time [math: t=n], the end of the most recent Reporting Period, in tonnes CO2e
[math: CO_2e_{Counterfactual,t=0}] is the total carbon storage within the counterfactual scenario at time [math: t=0], the time of project initiation, in tonnes CO2e
Uncertainty in the counterfactual must be characterized on this cumulative change and carried through to the uncertainty assessment in Section 9.2.
The methods and requirements for calculating [math: CO_2e_{Counterfactual,t}] are specified within the intervention Module under which The Project is crediting.
The total GHG emissions associated with a Reporting Period, RP can be calculated as:
[math: CO_2e_{Emissions,RP}=CO_2e_{Establishment,RP}+CO_2e_{Operations,RP }+CO_2e_{EndOfLife,RP}+CO_2e_{Leakage,RP}]
(Equation 9)
Where:
The following sections set out specific quantification requirements for each term in Equation 9. Note that the emissions term in Equation 4 is the cumulative value over all Reporting Periods up to the current time.
GHG emissions associated with project establishment should include all historic emissions incurred as a result of project establishment, including but not limited to the SSRs set out in Table 4, such as biomass removal, irrigation installation, etc.
Project establishment emissions occur from the point of project inception to the moment before the first removal activity takes place. GHG emissions associated with project establishment may be amortized following the requirements for amortization (The term used to describe allocation of Project emissions to multiple Removals or Reductions.) as outlined in Section 7 of the GHG Accounting Module.
GHG emissions associated with CO2eOperations,RP should include all emissions associated with operational activities, including but not limited to the SSRs set out in Table 4.
For improved soil management projects, the Reporting Period covers a set period of time (e.g., one year), during which soil organic carbon accumulates. CO2eOperations,RP emissions must be attributed to the Reporting Period in which they occur. This includes any emissions associated with management of the soil system or harvesting/processing of commodities for which production was established by The Project. The emissions from these activities must be calculated as explained in Section 9.6. Allocation outside of the current Reporting Period may be permitted in certain instances, on a case-by-case basis in agreement with Isometric.
CO2eEndOfLife,RP includes all emissions associated with activities that are anticipated to occur after the Crediting Period until the end of the Project Commitment Period. This includes activities related to ongoing monitoring for Reversals.
CO2eEndOfLife,RP must be estimated upfront and allocated in the same way as set out for calculation of CO2eEstablishment,RP.
Given the uncertain nature of CO2eEndOfLife,RP emissions, assumptions must be revisited at each Reporting Period and any necessary adjustments made. Furthermore, if there are unexpected CO2eEndOfLife,RP emissions that occur after The Project has ended, then the Reversal process described in the Reversals and Buffer Pools Section of the Isometric Standard will be triggered to compensate for any emissions not accounted for.
CO2eLeakage,RP includes emissions associated with a Project's impact on activities that fall outside of the system boundary of The Project. It includes increases in GHG emissions as a result of The Project displacing emissions or causing a secondary effect that increases emissions elsewhere.
For Projects engaging in interventions to increase SOC the primary risk of leakage comes from reduced agricultural productivity on the project sites leading to supply shortfalls and price-induced market leakage emissions. This could present through reduced agricultural yields or reduced livestock productivity corresponding to the intervention. Market leakage could also result from retention of agricultural residues for SOC improvements that historically went to market for alternative productive use.
Specifics of leakage considerations and calculation approaches can be found in appropriate Modules under this Protocol.
GHG emissions accounting must be undertaken in alignment with the GHG Accounting Module v1.1, which ensures a consistently rigorous standard in how GHG emissions are quantified and reported between different CDR Projects and approaches. This includes:
The Energy Use Accounting Module 1.3 provides requirements on how energy-related emissions must be calculated for The Project so that they can be subtracted in the net CO2e removal calculation. It sets out the calculation approach to be followed for intensive facilities and non-intensive facilities and acceptable emission factors.
Energy emissions are those related to electricity or fuel usage. They may include, but are not limited to:
The GHG Accounting Module v1.1 provides requirements on how transportation and energy-related emissions must be calculated for The Project so that they can be subtracted in the net CO2e removal calculation.
Embodied emissions are those related to the life cycle impact of equipment and consumables. They may include, but are not limited to:
Transportation emissions are those related to transportation of products and equipment. They may include, but are not limited to:
The storage reservoirs of the CO2 removed through soil management interventions are soil organic carbon and optionally live aboveground woody biomass and belowground woody biomass depending on the intervention Module. The durability of a CDR process refers to the length of time for which CO2 is removed from the Earth’s atmosphere and cannot contribute to further climate change.
For requirements associated with durability, reversal risk, risk assessment and management and buffer pool, please refer to the intervention Module under which The Project is crediting.
The durability of awarded Credits are defined by the Module under which The Project is crediting.
The durability must not exceed any of the following:
The durability must not exceed any of the following:
Reversal risks which may threaten the durability of project system carbon and project-level risk assessment and mitigation requirements are discussed in Section 10.2 and Section 10.3, respectively.
[/R-PXQ5-0]The durability must not exceed any of the following:
Reversal risks which may threaten the durability of project system carbon and project-level risk assessment and mitigation requirements are discussed in Section 10.2 and Section 10.3, respectively.
[/G-QCXQ-0]A improved soil management-wide Buffer Pool managed by Isometric is used to insure Credits against Reversals. Throughout any Ongoing Monitoring Period, project carbon stocks must be monitored for Reversals to ensure Credits achieve their stated durability. Upon detection and quantification of carbon losses, Credits issued to the Buffer Pool will be canceled in equal proportion to the loss (see Section 10.4 and Section 10.5).
Project Proponents must design The Project in a manner that is aligned with long-term durability and sustainability. Well-designed projects should mitigate risk of changes in land use and land management or Reversal after The Project ends (see Section 5.0). Support for long-term durability may consist of evidence of the following, and ideally a combination of factors:
[/G-J0ZW-0]Reversals are defined as reductions in stored carbon within applicable pools that may result in emissions of CO2 to the atmosphere. Reversal risk is quantified by assessing the likelihood of a disturbance event occurring over a period of time and estimating the severity of the disturbance in terms of carbon loss. Disturbance events may be natural or anthropogenic, such as fire, drought/heat, insect and disease, changes in management practices, and land use conversion. A disturbance event which results in a reduction in soil carbon and/or other covered pools is considered a loss event. The duration of disturbance events may be over multiple years (e.g., drought) or for a very limited duration (e.g., flood).
The likelihood and severity of disturbances are influenced by external and project-related factors.
External factors:
Project-related factors:
Furthermore, the risk profile of The Project may change over the Project Commitment Period due to:
Projects must complete the Risk Assessment(s) of the Improved Soil Management intervention Module(s) The Project is crediting against, the results of which are independently evaluated by a third-party VVB.
Projects crediting under the Cropland Management Module must complete the risk assessment in Appendix A of the Module
The Risk Assessment is used to determine the risk profile of The Project, including risks to Credit delivery and storage. Aspects of The Project which have higher risk exposure should be accompanied by an appropriate risk mitigation plan. To safeguard against high risk projects, the Project must score below the thresholds indicated within the corresponding intervention Module to be eligible for crediting under this Protocol.
The Risk Assessment(s) must be updated each Reporting Period by the Project Proponent and increased risk scores will result in additional mitigation activities.
The following safeguards are required for all improved soil management projects and must be in place at the start of The Project and maintained throughout the Project Commitment Period. The Project Proponent must:
[/R-AJJT-0]As outlined in the Buffer Pools Section of the Isometric Standard, the Buffer Pool is a mechanism used to insure against risks of Reversals that may be observable and attributable to The Project through monitoring.
Currently, there is insufficient published scientific evidence to quantitatively account for climate change, management activities, or project age and translate this into a highly accurate Buffer Pool contribution. As a result, we apply either a flat contribution requirement on The Project or a model to translate the Risk Assessment for the intervention Module into a Buffer Pool contribution. As actuarial data improve and more research is published, Protocol requirements will be updated accordingly.
To be eligible under this Protocol, The Project must either:
[/R-Y7EF-0]The intervention Module's project-specific Risk Assessment does not account for contract-tenure or non-renewal risk; that risk is addressed solely by the Contract Coverage Buffer below. The Contract Coverage Buffer is therefore additive to the base contribution and does not duplicate any charge within it, whichever base method The Project uses.
In addition to the contribution determined under either of the approaches above, a Contract Coverage Buffer contribution applies for any Reporting Period in which contractual agreements with enrolled landowners or operators are not in place for the full remaining duration of the Project Commitment Period across all portions of the Project Area, determined in accordance with the section below. This additional contribution reflects the increased Reversal risk associated with management practices after contract expiry, and applies on top of, not in lieu of, the base contribution.
[/R-HWA4-0]The Contract Coverage Buffer applies an additional Buffer Pool contribution scaled to the share of The Project exposed to contract non-renewal over the remaining Project Commitment Period, weighted by each enrolled field's contribution to the Project's net removals and by the share of the coverage horizon left uncontracted. A Project that lacks the data to run this calculation may instead elect the flat ceiling rate of 5%; this choice is fixed at the first verification of the Project. Credits contributed under this section are held in the improved soil management-wide Buffer Pool (Section 10.4.2).
The base contribution under Section 10.4.1 applies to physical carbon reversal, including the treatment of lost land access as a Reversal under Section 5.1.1.1. The Contract Coverage Buffer applies to contractual continuity only and does not apply to physical reversal.
For each enrolled field, the share of the required coverage horizon left uncontracted is determined and aggregated across The Project, weighted by carbon contribution, to give a single Project-level exposure figure:
[math: E = \frac{\sum_{i} A_i \times \max\!\left(0,\ \dfrac{T_{req} - C_i}{T_{req}}\right)}{\sum_{i} A_i}]
(Equation 10)
Where:
[math: CCB_{base} = B_{max} \times E]
(Equation 11)
Where:
Rates expressed as percentages enter the products in Equations 10 and 11 as decimals ([math: B_{max} = 5\% = 0.05]); [math: E] and [math: M] are dimensionless in the range 0–1.
[math: M = \max\!\left(M_{floor},\ 1 - d_{rev} - d_{eng} - d_{ret}\right)]
(Equation 12)
Where:
[math: d_{rev} = \begin{cases} 0.15 & \text{if } RS > 20\% \\ 0 & \text{if } RS \le 20\% \end{cases}]
(Equation 13)
Where:
[math: d_{ret} = 0.20 \times \operatorname{clamp}\!\left(\frac{D_{exp} - D_{obs}}{D_{exp}},\ 0,\ 1\right)]
(Equation 14)
Where:
[math: D_{exp}] is the expected cumulative non-renewal over the elapsed period:
[math: D_{exp} = 1 - (1 - a)^{\,t}]
(Equation 15)
Where:
Where [math: D_{exp} = 0], [math: d_{ret}] is set to 0.
[math: a] is set to 0.05/year, reflecting the central rate of annual attrition observed in comparable working-land conservation practices (net cover-crop and no-till disadoption of roughly 3–6%/year). A Project-specific value may be substituted only on the basis of evidence accepted by Isometric.
Each discount is 0 where its condition is not met.
[math: CCB_{final} = B_{max} \times E \times M]
(Equation 16)
Where:
The resulting Credits are contributed to the improved soil management-wide Buffer Pool (Section 10.4.2) and reported as a distinct line, in addition to the base contribution under Section 10.4.1 and in place of the flat contract-coverage 5% within it.
A Project that does not have the data required to determine exposure or mitigation under Steps 1–4, in particular, the field-level contract terms or the carbon (or area) weighting needed for Equation 11, may instead elect to contribute the flat ceiling rate of [math: CCB_{final} = B_{max} = 5\%], equivalent to setting [math: E = 1] and [math: M = 1] in Equation 16. A Project may elect the flat rate without acceptance by Isometric. This election replaces, and is not additional to, the flat contract-coverage 5% within Section 10.4.1.
The choice between the calculated method (Steps 1–4) and the flat-rate election must be made at the first Verification and is fixed for the remainder of the Project Commitment Period. A Project may not switch between the two methods at any subsequent Verification. A Project that elects the flat rate contributes 5% of the Credits generated in each Reporting Period to the improved soil management-wide Buffer Pool (Section 10.4.2) under this section, in addition to its base contribution.
For a Project on the calculated method (Steps 1–4), the Contract Coverage Buffer rate must be recomputed at every Verification event. At each Verification, both [math: T_{req}] and each [math: C_i] are re-measured as the term remaining from the Verification date.
Recalculation applies only to Credits not yet issued. Credits already contributed to the Buffer Pool remain in the Pool and are non-returnable, consistent with the Buffer Pool Compensation Process (Section 10.4.3) and the Reversals and Buffer Pools Section of the Isometric Standard.
A Project on the flat-rate election performs no recalculation under this Step and contributes the 5% ceiling in every Reporting Period.
The Buffer Pool contribution will be held in an improved soil management-wide Buffer Pool managed by Isometric. Pooling of a diversified portfolio of improved soil management projects across geographic regions, project types, spatial scales and temporal scales can reduce the exposure to systemic risks stemming from nature-based projects constrained to a geographic area or ecological type1210,1311,1412. The improved soil management-wide Buffer Pool composition will be transparently reported on the Isometric Registry.
The Buffer Pool Compensation Process is governed by the Isometric Standard. The following procedures apply upon detection and quantification of a loss event.
For more details on Reversals, refer to Isometric Standard sections covering risk of reversal and buffer pools.
Monitoring, reporting, and quantification of reversals must follow the requirements set within the Improved Soil Management intervention Module(s) The Project is crediting under.
Isometric would like to thank the following external contributors to this Protocol:
Buffer Pool Contribution
Geospatial Dynamic Baselines
Fractionation of Soil Carbon Pools
Insurance
Quantification Methods
Stakeholder Engagement
Uncertainty
Köchy, M., Hiederer, R., & Freibauer, A. (2015). Global distribution of soil organic carbon – Part 1: Masses and frequency distributions of SOC stocks for the tropics, permafrost regions, wetlands, and the world. SOILSoil, 1(1), 351–-365. ↩
Lessmann, M., Ros, G. H., Young, M. D., & De Vries, W. (2022). Global variation in soil carbon sequestration potential through improved cropland management. Global Change Biology, 28(3), 1162-1177. ↩
Jones, P., Hannam, J., & Collins, C. (2026). Evaluating the economic co-benefits of soil carbon sequestration: The test case of the UK. Land Use Policy, 161, 107839\. ↩
McGuire, R., Williams, P. N., Smith, P., McGrath, S. P., Curry, D., Donnison, I., Emmet, B... , & Scollan, N. (2022). Potential Co‐benefits and trade‐offs between improved soil management, climate change mitigation and agri‐food productivity. Food and Energy Security, 11(2), e352. ↩
Shah, A., Weersink, A., & Vyn, R. (2022). Adoption of beneficial management practices to improve soil health. Canadian Journal of Soil Science, 102(4), 825-834. ↩
Ng’ang’a, S. K., Jalang’o, D. A., & Girvetz, E. H. (2019). Soil carbon enhancing practices: a systematic review of barriers and enablers of adoption. SN Applied Sciences, 1(12), 1726\. ↩
Di Sacco, A., Hardwick, K. A., Blakesley, D., Brancalion, P. H., Breman, E., Cecilio Rebola, L., ... & Antonelli, A. (2021). Ten golden rules for reforestation to optimize carbon sequestration, biodiversity recovery and livelihood benefits. \*Global Change Biology\*, \*27\*(7), 1328-1348. ↩↩2
Convention on Biological Diversity. (2002). Decision VI/23: Biodiversity and climate change. Retrieved from https://www.cbd.int/decision/cop/default.shtml?id=7197↩
Gann, G. D., McDonald, T., Walder, B., Aronson, J., Nelson, C. R., JonsonHallett, J. G., ... & Dixon, K. W. (20192026). International principles and standards for the practice of ecological restoration. \*Restoration Ecology. 27 (S1): S1-S46.\*, \*27\*(S1)34, S1-S46. ↩
Di Sacco, A., Hardwick, K. A., Blakesley, D., Brancalion, P. H., Breman, E., Cecilio Rebola, L., ... & Antonelli, A. (2021). Ten golden rules for reforestation to optimize carbon sequestration, biodiversity recovery and livelihood benefits. \*Global Change Biology\*, \*27\*(7), 1328-1348e70441. ↩
United Nations General Assembly. (2007). United Nations declaration on the rights of indigenous peoples (A/RES/61/295). Retrieved from [https://www.un.org/development/desa/indigenouspeoples/wp-content/uploads/sites/19/2018/11/UNDRIP\\\\\\\_E\\\\\\\_web.pdf\](https://www.un.org/development/desa/indigenouspeoples/wp-content/uploads/sites/19/2018/11/UNDRIP\_E\_webUNDRIP_E_web.pdf) ↩
United Nations General Assembly. (2007). United Nations declaration on the rights of indigenous peoples (A/RES/61/295). Retrieved from [https://www.un.org/development/desa/indigenouspeoples/wp-content/uploads/sites/19/2018/11/UNDRIP\\\\\\\_E\\\\\\\_web.pdf\](https://www.un.org/development/desa/indigenouspeoples/wp-content/uploads/sites/19/2018/11/UNDRIP\_E\_web.pdf) ↩↩2↩3
United Nations. (2016). Free, prior, and informed consent: An indigenous peoples’ right and a good practice for local communities. Retrieved from [https://www.un.org/development/desa/indigenouspeoples/publications/2016/10/free-prior-and-informed-consent-an-indigenous-peoples-right-and-a-good-practice-for-local-communities-fao/\](https://www.un.org/development/desa/indigenouspeoples/publications/2016/10/free-prior-and-informed-consent-an-indigenous-peoples-right-and-a-good-practice-for-local-communities-fao/) ↩↩2
Cohn, A. S., Newton, P., Gil, J. D., Kuhl, L., Samberg, L., Ricciardi, V., Manly, J.R., & Northrop, S. (2017). Smallholder agriculture and climate change. Annual Review of Environment and Resources, 42(1), 347-375. ↩