Projects must provide a summary of the monitoring plan that details the monitoring duration, frequencies, location, SOPs, sample collection methods, analytical methods, thresholds (if applicable), data reporting and quality assurance/quality control.
Projects must detail the frequency and duration of monitoring, which must span pre-deployment, dosing and post-dosing.
Project Proponents must determine and outline appropriate monitoring locations.
Required river parameters for quantification must be validated and described including river discharge, temperature, salinity, and carbonate system parameters.
Projects must describe how alkalinity dosing will be measured.
Projects must provide a site-specific ecological monitoring and mitigation strategy.